Search Documents

Sort by

  • AUSIMM
    KEYNOTE: Back to the Future – Still on the Dark Side

    By P D. Munro

    "This is a reprise of the paper ‘Back to the Future – Why Change Doesn’t Necessarily Mean Progress’ presented to the Tenth Mill Operators’ Conference in 2009. It was observed that the ‘boom and

    Oct 10, 2016

  • AUSIMM
    BHP Billiton Iron Ore Car Dumper 4 - Temporary Works

    By D Ford

    BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow

    Jan 1, 2007

  • NIOSH
    OFR-84-79 Factors Influencing The Solution Rate Of Uranium Dioxide Under Conditions Applicable To In Situ Leaching

    By A. Renton Amell

    The rate of dissolution of U02 was measured in acid solutions similar to those used for in situ leaching, with S04 of 10-1.82 to 10-4 M, Fe(III) of 10-2 to 10-4 M and pH's of 1.1 to 2.3. The depe

    Jan 1, 1978

  • NIOSH
    Detecting Hot Areas In Dumps With A Handheld, Infrared Scanner

    By Raymond M. Stateham

    A portable, handheld infrared scanner has been used to detect abnormal surface temperature on dumps of flood-generated trash near Wilkes-Barre, Pa. Three of eight dumps examined had thermal anomalies

    Jan 1, 1973

  • NIOSH
    RI 8819 Flocculation of Sulfide Mineral Fines by Insoluble Cross-Linked Starch Xanthate

    By S. C. Termes, P. E. Richardson, R. L. Wilfong

    "The Bureau of Mines conducted research on the flocculation of various minerals with insoluble cross-linked starch xanthate (ISX) to determine its potential as a beneficiation technique for low-grade,

    Jan 1, 1983

  • CIM
    Process Integration and Optimisation of the Boddington Hpgr Circuit

    The current mining operations at Newmont Boddington Gold Mine (NBG) commenced in 2008, and commissioning of the processing plant started in the latter half of 2009. Metso Process Technology and Innova

    Jan 1, 2012

  • AUSIMM
    Practical Approaches to Managing Business Critical Water Risk

    By A Tang, K Ringwood

    "Water is increasingly being recognised as a material business risk that many companies are still not well-equipped to deal with. Despite a raft of water-risk focused initiatives, methodologies and gu

    Nov 26, 2013

  • CIM
    Measurement of Environmental Performance of Mining Firms ? Technical Approaches and Strategic Implications

    By Knud Sinding

    Mining firms are widely criticised for their adverse impacts on the environment. At the same time many firms in the industry devote extensive resources, both financial and managerial, to the reduction

    May 1, 2003

  • ISEE
    A Kinematic Approach for Blast Modeling

    By Ruilin Yang

    Kinematic approach of blast modeling refers to using the velocity, strain, or displacement as controlling parameters to model blasting, rather than the stress and the material constitutive relations.

    Feb 1, 2020

  • SME
    Allegheny County Sanitary Authority—Ohio River Tunnel Project Updates - RETC2023

    By Shawn McWilliams, Aini Sun, Mike Lichte, Greg Colzani

    The Allegheny County Sanitary Authority (ALCOSAN) adopted its Clean Water Plan (CWP) in May 2020, as part of a federal consent decree to comply with the USEPA’s Combined Sewer Overflow (CSO) Control P

    Jun 13, 2023

  • SME
    An Application Of Acoustic Cross-Borehole Tomography For Locating A Tunnel And Its Associated Stress Anomaly

    By G. J. Schneider

    The higher stress zone adjacent to an underground opening causes a velocity anomaly that can be mapped in favorable conditions with an acoustic cross-borehole logging system. Bureau personnel used a s

    Jan 1, 1988

  • NIOSH
    MLA 15-93 - Mineral Resource Investigation Of The Caribou City-Stump Creek Study Area, Bonneville And Caribou Counties, Idaho

    By Richard L. Rains

    In 1992, the Bureau of Mines evaluated mineral resources of the 34,043-hectare Caribou City and 41,943-hectare Stump Creek study areas in southeastern Idaho. No resources were delineated. The areas ha

    Jan 1, 1993

  • DFI
    Consultants Can Be Safe, Too – A Collaborative Approach

    By Brian FitzPatrick, Michael J. Weaver

    Everyone has a role in site safety, even consultants. This paper presents a summary of how a geotechnical and environmental consulting firm, with field staff on construction and subsurface exploration

    Jan 1, 2019

  • AUSIMM
    The Integration of Geometallurgy with Plant Design

    By G Harbort

    Traditional engineering design for flotation circuits use the “Rule of Thumb” approach. Typically this uses a nominated maximum head grade for design. A scale-up factor is applied to laboratory flotat

    Aug 8, 2011

  • SME
    Remediation Of The Warm Springs Ponds Complex, Montana

    By W. R. Hail

    A proactive design and construct approach was used to remediate the Warm Springs Ponds Complex near Anaconda, Montana under "Superfund". The pond complex is used for treatment/settlement of heavy meta

    Jan 1, 1995

  • IMPC
    Review of Ecological Rehabilitation in Metal Mine in China

    The status quo of ecological rehabilitation in metal mine in China and progress in the technology for ecological rehabilitation are presented, including soil reconstruction, soil improvement, plant se

    Jan 1, 2014

  • CIM
    Quantifying Losses in Support Capacity Due to Corrosion

    By E. Ghali

    "Corrosion of support system components (e.g., bolts, mesh, plates) is a safety and economic concern in underground mines. This paper reports the results of a five-year study wherein corrosion coupons

    Jan 1, 2015

  • DFI
    Design, Construction And Verification Of Temporary Working Platforms – Australian And New Zealand Good Industry Practice

    By Martin D. Larisch, Ronald Damen

    The design and construction of temporary working platforms for cranes and piling rigs is a high-risk activity. It requires the careful selection of the appropriate input parameters to obtain the corre

    May 1, 2022

  • SME
    Development Of Stillwater Mining Company's East Boulder Project Using Tunnel Boring Technology

    By C. Alexander

    Stillwater Mining Company is developing a second underground palladium and platinum mine approximately 21 km (13 miles) west of their existing Nye operation in south central Montana. A 5650 meter (18,

    Jan 1, 1999

  • IMMS
    Application Of Ferromanganese Marine Mineral Tailings In Concrete And Ceramics

    By J. C. Wiltshire

    Both ferromanganese crusts and nodules present potential processors with enormous volumes of tailings of dubious environmental character: most processing scenarios fail to utilize the uneconomic manga

    Jan 1, 1991