Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Impacts of ESG on the Copper Supply Chain— The New Critical Mineral - SME Annual Meeting 2024By Casandra Gamez Gonzales, Angelina Anani
Copper, the newest addition to the critical mineral list, is an essential metal whose electrical and heat conductive properties label it as a vital mineral for the creation of renewable energy sources
Feb 1, 2024
-
IC 8273 Mining Method, Technique, & Cost of Presplitting the Flood Control Gate Shaft, Littleville Dam, Huntington MABy N. A. Eilertsen, Rolf S. Paine
The Bureau of Mines studied the presplitting technique used for controlling overbreakage in the walls of a vertical shaft at the U.S. Army Corps of Engineers Littleville Dam project near Huntington, M
Jan 1, 1965
-
OFR-1-75 Environmental, Economic, And Social Impacts Of Mining Copper-Nickel In Northeastern MinnesotaBy Ronald M. Hays
The Duluth Gabbro Complex in Northeastern Minnesota possibly contains a significant domestic copper resource and the nation's largest nickel resource. Exploration has discovered large low-grade c
Jan 1, 1974
-
Construction of Sherritt's ConcentratorsBy J. A. MacLellan
"CONSTRUCI'ION OF SHERRITT'S CONCENTRATORSSherritt Gordon is operating two mills north of the 56th parallel, and is presently engaged in building a third. The author was closely involved in the design
Jan 1, 1972
-
Case Study: Feather River West Levee Program Cutoff WallsBy Kyle R. Lackner, Jared P. Williams
"The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat
Jan 1, 2016
-
Planning for Commercial Operation of the Honeymoon ISL Uranium ProjectA recoverable uranium resource, shown to be suitable for in situ leaching, was discovered at Honeymoon in South Australia in 1971. Exploration of the deposit was carried out during the period from 197
Jan 1, 2002
-
Quantifying the effect of climate and surface materials on post-mining landscape erosion – a risk approach using landscape evolution modelsBy D C. Verdon-Kidd, G R. Hancock, M J. Saynor, J B. C Lowry, T J. Coulthard
Designing post-mining landscapes requires quantifying the short and long-term risks. In recent years, computer based landscape evolution models (LEMs) have been used to provide insight into both erosi
Jul 25, 2018
-
Effects of Atmospheric Conditions on Energy Pile PerformanceBy Melissa S. Beauregard, Randall A. Pietersen
This study focuses on quantifying the effects of water infiltration on a full-scale energy pile system’s ability to meet the thermal demand of an HVAC system. Theoretically, an energy pile system shou
Jan 1, 2019
-
A Comparison Of Environmental Permitting Requirements And Costs Chile And The Last FrontierBy R. T. Richins
Coeur d'Alene Mines Corporation (CDE) is a precious metals mining company. The company's three mining operations are located In Nevada and Idaho. Collectively, these mines (Rochester in Neva
Jan 1, 1993
-
Contreting The Deep Shafts And Tunnel For New York City's Third Water TunnelBy Edward S. Plotkin, Gary A. Almeraris, Thomas F. Peyton
The lining of the tunnel and shafts for a new section of New York City's- water system required extensive components to produce, deliver and place a continuous tunnel linning. The project placed
Jan 1, 1987
-
International Workshop On Micropiles ? September 26-28,1997 - Title ? Table Of Contents - First International Workshop On Micropiles September 26-28,1997This Workshop was held at the Doubletree Inn, Seattle, Washington from September 26 to 28, 1997. Run under the auspices of the Deep Foundations Institute (DFI), it was co-funded by the newly formed Ja
Jan 1, 1997
-
Hydrogen Sulfide Produced From Sulfate By Biological Reduction For Use In Metallurgical OperationsBy A. L. de Vegt
Hydrogen sulfide is an expensive chemical used in nickel, zinc and copper mining and metallurgical operations for selective recovery and concentration of metals from leach water streams, acid plant bl
Jan 1, 1998
-
Simulation of Bulk Earthwork and Quarry Material Delivery During Surface Mine TransformationBy S. Duvah Pentiah
The transformation of an open pit coal mine to a horizontal-punch underground mine is subject to a number of challenges. These include scheduling the operation of various sizes of trucks over a long p
Aug 1, 2013
-
Design and Construction of Driven H-Piles for Landslide Stabilization in Marlboro ClayBy Charbel Khoury, Kwabena Ofori-Awuah, Kofi B. Acheampong
"Following heavy rains in spring of 2014, Prince George’s County officials issued a mandatory evacuation for homes in the Piscataway Hills subdivision of Fort Washington, Maryland where a landslide al
Jan 1, 2017
-
Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And MeetingBy Peter J. Nicholson
A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th
Jan 1, 1998
-
El Oxígeno de la Empresa Minera: Un Modelo de Innovación ExitosoBy Ruth Escobar
Así como los seres vivos necesitan del oxígeno para vivir, las empresas mineras precisan de un modelo de innovación exitoso para ser competitivas hoy y en el futuro, esta es la síntesis del trabajo de
Sep 30, 2022
-
Learnings from Infrastructure Replacement within an Operating RefineryBy L. Trytten, S. Bass, P. Nawrocki, J. Mercer
The Sherritt Fort Site nickel refinery and fertilizer plant has been operating continuously since 1954. The ammonia leach process uses ammonia and sulphuric acid, producing nickel and cobalt and an am
Jan 1, 2015
-
OFR-84-79 Factors Influencing The Solution Rate Of Uranium Dioxide Under Conditions Applicable To In Situ LeachingBy A. Renton Amell
The rate of dissolution of U02 was measured in acid solutions similar to those used for in situ leaching, with S04 of 10-1.82 to 10-4 M, Fe(III) of 10-2 to 10-4 M and pH's of 1.1 to 2.3. The depe
Jan 1, 1978
-
Failure Mechanisms in Thermo-Mechanical Fatigue of DS Superalloy Rene 80By E. O. Abrokwah
Directionally solidified (DS) Rene 80 Superalloy was tested in thermo-mechanical fatigue (TMF) over the temperature range 500-900°C and plastic strain levels from 0.2 to 0.8% using a DSI Gleeble therm
Jan 1, 2011
-
BHP Billiton Iron Ore Car Dumper 4 - Temporary WorksBy D Ford
BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow
Jan 1, 2007