    A Hybrid Life Cycle Assessment and Geographical Information System Model for Sustainable Recycled Aggregate Chain Management in Turin (Italy)

    By E Garbarino, P Molina, V Badino

    Given the ever increasing quantity of construction and demolition waste (C&DW), one of the most challenging issues presently facing policymakers and public administrators in Italy concerns how to

    Jan 1, 2009

  • NIOSH
    OFR-103(1)-82 Feasibility Of Water Diversion And Overburden Dewatering - Volume I: Technical Report

    By Michael L. Clar

    The U.S. Bureau of Mines contracted a study to determine the feasibility of water diversion and overburden dewatering for underground coal mines in the Appalachian Region. All relevant published liter

    Jan 1, 1981

  • ISEE
    Reactive Ground Learnings and Prevention

    By R. Jacob

    Mining has been around for a long time, and new deposits are being discovered continually but are becoming more complex for processing and typically sulfide in nature. Most of the large easy deposits

    Feb 6, 2023

  • ISEE
    Safety Talk - Misfires: What All Employees Need to Know

    By Robert Morgan

    The mind-set that only blasters and their helpers need training in explosives can result in risk to other employees working at mine or construction sites where blasting is conducted. Misfires are not

    Jan 1, 2004

  • DFI
    Fresh Concrete Pressure in Cast In-Situ Bored Piles

    By Matthias Pulsfort, Hanna Nissen, Markus Herten

    An insufficient integrity of cast in-situ bored piles can lead to a reduction of the load bearing capacity and may require cost intensive repairs. Reasons for an insufficient pile integrity are linke

    Sep 8, 2021

  • AUSIMM
    Development and Implementation of Major Hazard Management Plans

    By D Hume

    During 2001 the Ridgeway Gold Mine, driven by company initiatives and recent NSW legislation (General Rule 2000), developed and implemented Major Hazard Management Plans to control significant hazards

    Jan 1, 2002

  • NIOSH
    IC 8456 Surface Mine Reclamation, Moraine State Park, Pennsylvania

    By Lewis M. McNay

    Description of methods employed and cost data are given for surface-mined land reclamation in Moraine State Park, Butler County, Pa. This project was conducted under the authority of the Appalachian R

    Jan 1, 1970

  • SAIMM
    Tailings storage facility-specific water balance as a standard practice

    By K. M. Uderstadt, G. C. Howell, L. de Villiers

    This paper highlights the advantages of developing tailings storage facility-specific water balances. A case study illustrates how such focused analysis provides clearer insights into water storage a

    Apr 8, 2026

  • SME
    Assessing the Safety Culture of Underground Coal Mining: Results and Recommendations

    By C. L. Kosmoski

    In recent years, coal mining safety has attained national attention due to several highly publicized disasters. Despite these threats to worker safety and health, the U.S. relies on the mining of coal

    Feb 23, 2014

  • SME
    A Case History on the Reduction of Chlorides from Mine Water

    By K. Lagnese, C. Robinson, S. Muddasani

    "Mine water generated from underground coal mining operations contains both dissolved and particulate solids. Dissolved solids primarily consist of sodium, calcium, magnesium, potassium, chlorides and

    Jan 1, 2015

  • SME
    New Application of Directional Drilling and Gas-Enhanced Foam for Suppression of Abandoned Underground Coal Mine Fires

    By M. A. Trevits, A. Ozment

    "According to the Office of Surface Mining Reclamation and Enforcement, Abandoned Mine Land Inventory System, in 2013 there were 98 underground mine fires in nine states. This is considered to be an u

    Jan 5, 2018

  • SME
    Pre-Excavation Grouting Design Guidelines for Hard Rock Excavations

    By S. Klein, D. Crouthamel, D. W. Farmer, S. H. Phillips

    Groundwater inflows during construction pose one of the greatest risks to the successful completion of tunnel projects. Inflows can result in safety concerns, difficulty in mining and ground support,

    Jan 1, 2005

  • SME
    Management of Explosion Risks in Underground Coal Mines with the use of Bag Barriers

    By J. R. Schafler, J. L. Brinkman

    "Since the year 2000, 59 miners have lost their lives to explosions occurring in underground coal mines in the US. More accurately, those explosions were methane ignitions that propagated through the

    Jan 1, 2017

  • ISEE
    Paper or Electronic Records – Ways to Improve Blast Documentation and Recordkeeping

    By Travis A. Davidson, Ralph E. Burnham, Cathy Aimone-Martin, J. Kelly Ratliff

    Blasters face a long list of tasks to execute daily—from vehicle inspections to blast design and layout, hole loading and tie-in, securing the site, and finally, safely executing the blast. Good pract

    Jan 21, 2025

  • CIM
    Bloom Lake: Flowsheet Improvement and Recommissioning

    By A. Belleau, F. Lavoie

    "Quebec Iron Ore Limited (QIO), a subsidiary of Champion Iron Limited (Champion), secured assets in early 2016 from the previous Bloom Lake operations in the heart of the Labrador Trough region of Nor

    Jan 1, 2019

  • DFI
    Deep Soil Mixing Design and Construction for Surface Fault Rupture Mitigation

    By James R. Gingery, Byron Foster, Bret Lingwall

    While microzonation and setbacks are the typical mitigation for structures exposed to surface fault rupture hazards, lifelines and lifeline facilities are not easily relocated to avoid faulting. In th

    Sep 8, 2021

  • DFI
    Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric Project

    By James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford

    "Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock

    Jan 1, 2017

  • CIM
    Optimising the Management of CIP/CIL Circuits

    By K. Barbetti

    "The carbon-in-pulp (CIP) process has been the dominant gold recovery process since the early 1980s. CIP has proven to be very adaptable for a wide range of ores and circuit configurations. The key pe

    Jan 1, 2017

  • AUSIMM
    Staurolite Product Development

    By S Benson

    Staurolite is one of the major contaminant minerals contained in the Tiwest Cooljarloo orebodies. Approximately 80 per cent of staurolite in mined ore, reports to the heavy mineral concentrate that is

    Jan 1, 2001

  • AUSIMM
    Lessons Learned from Geometallurgical Investigations Carried Out on a Nickel Sulfide Flotation Plant

    By B Newcombe

    From many years practical industrial experience the author has drawn together a list of the key points to consider when embarking on a large-scale geometallurgical project. Fundamental aspects which m