Search Documents

Sort by

  • AUSIMM
    Optimising Assessment and Selection with Indigenous People in Remote Communities

    By P Davidson

    For many years, in numerous settings, the need for a language-fair and culture-fair assessment test has been identified as a significant issue for employment and selection for training of remote indig

    Jan 1, 2006

  • SME-ICGCM
    A Practical Solution to Highwall Mining Coal Reserves Sterilized by Auger Mining

    By Michael Amick

    Over the last few years as the coal industry has seen an increase in the price of coal, a renewed interest in the additional mining of pre-law highwall sites has occurred. Much premium coal and pro

    Jan 1, 2007

  • SME-ICGCM
    Effects of Specimen Age on the Uniaxial Compressive Strength and Moisture Content of Weak Coal Measure Rocks

    By Timothy Barton

    The uniaxial compressive strength (UCS) is the most fundamental measurement used in geotechnical rock characterization for mine design. While there are standardized procedures for how to conduct UCS

    Jan 1, 2008

  • SME
    Mine Safety Applications Of A Geographic Information System

    By S. E. Phillipson

    The Mine Safety and Health Administration?s (MSHA) Roof Control Division (RCD) collects a variety of geological and engineering information pertaining to mining conditions in surface and underground m

    Jan 1, 2008

  • CIM
    Water Management in Hydraulic Fill Operations

    By M. Helinski

    In the authors? experience inappropriate water management in hydraulic fill masses has been the root cause of most barricade failures. Inappropriate water management can lead to high water pressures,

    May 1, 2007

  • DFI
    Pore Water Pressure Response and Effect on Installation Torque of Large Diameter Helical Piles in Soft Soils

    By Howard A. Perko, M. Mae Benvenga, Heather H. Trantham

    Displacement of soil and groundwater during helical pile installation can produce excess pore water pressures (PWP) in fine-grained soils. Pore water pressure reduces effective stress in the soil imme

    Jan 1, 2018

  • SAIMM
    The History And Development Of The Pyrometallurgical Processes At Evraz Highveld Steel & Vanadium ? Synopsis

    By W. S. Steinberg

    In 1963, the full-scale engineering study for the development of an iron, steel, and vanadium plant was initiated. This was the birth of Evraz Highveld and its process flow as it is known today. Highv

    Jan 1, 2011

  • SME
    Hydrologic evaluation of post-closure flooding and dewatering of the Homestake Mine

    By Guosheng Zhan

    The Homestake Mine included the open cut and underground workings up to 2,484 m (8,150 ft) deep. The mine ceased mining activities in December 2001 after 125 years of operation. Pumping from the under

    Jan 4, 2010

  • AUSIMM
    Road Haulage of Ore by Peko Mines N.L.

    With the proving of a mineable orebody at Orlando in May 1961, Peko Mines N.L. was faced with the decision of whether to mill the ore on site or to haul it 25 miles to central facilities at Peko. Orla

    Jan 1, 1966

  • AUSIMM
    Continuous Vacuum Dezincing Plant at B.H.A.S. Pty Ltd., Port Pirie

    By Williams K. C

    This paper presents a brief account of the plant which has been developed at Port Pirie to recover, by vacuum distillation, the greater part of the zinc content of desilverized lead. The present plant

    Jan 1, 1956

  • SAIMM
    Trial Of The BX Conical-Ended Borehole Overcoring Stress Measurement Technique

    By H. Ogasawara

    Information on rock stress is important for safe mining in seismically active ground. On a major gold mine, a few tens of crews are continuously conducting geological drilling with small pneumatic mac

    Jan 1, 2012

  • ISEE
    Studies on Safe Blasting Technique in Fire Area of Coal Mines

    By A Bagchi, Nabiullah, Jagdieh

    "A number of coal mines in India are affected by fire. Most of coking coal reserves in the country are located in Jharia coalfield where more than 18 sq. km is in the grip of fire. Generally such fire

    Jan 1, 1993

  • AUSIMM
    The Coromandel Epithermal Gold-Silver Province: A Result of Collision of the Northland and Colville Volcanic Arcs in Northern New Zealand

    By D N. B Skinner

    Changes in the configuration of late Cenozoic volcanic arcs related to Pacific-Australian plate convergence in northern New Zealand may have localised large-scale epithermal gold-silver mineralisation

    Jan 1, 1997

  • DFI
    Economic and Safe Design and the Execution Standards for the Construction Phase of Deep Foundation Systems in Difficult Soil Conditions

    By Seffen Leppla, Rolf Katzenbach, Matthias Seip

    "Abstract The economic and safe design of deep foundation systems in difficult soil conditions is based on a reduction of construction material used, construction time spent, energy consumed and a hig

    Jan 1, 2014

  • CIM
    Comparison of Uranium Solvent Extraction Strip Options

    By Deon van Tonder, Chuck Edwards

    "Solvent extraction is used in many acid leach uranium circuits to upgrade and purify the uranium bearing solution prior to final product precipitation. A number of strip options are available to reco

    Jan 1, 2013

  • CIM
    Heavy Mineral Concentration from Oil Sand Tailings

    By Francis Chachula, Niel Erasmus

    "In 2002, Titanium Corporation Inc. focused its attention on the development of a process for the recovery of valuable heavy minerals, including zircon and titanium bearing minerals from oil sands fro

    Jan 1, 2008

  • SME
    Hydrologic Assessment Of Waste Rock Stockpiles: A Case Study From Ajo Mine, Arizona

    By A. L. Williamson, G. Savci

    Hydrologic assessments of existing and proposed waste rock stockpiles (WRS) are typically required for application of operating and closure permits at mine sites. The results of these assessments can

    Jan 1, 2002

  • SAIMM
    The History And Development Of The Pyrometallurgical Processes At Evraz Highveld Steel & Vanadium

    By W. S. Steinberg

    Keywords: Pyrometallurgy, furnace, open slag bath, Evraz, Highveld In 1963, the full-scale engineering study for the development of an Iron, Steel, and Vanadium plant was initiated. This was the

    Jan 1, 2011

  • AUSIMM
    Grinding Mill Operation and Maintenance - Central to Asset Management

    Grinding Mill Operation and Maintenance - Central to Asset Management Since 2005, RME has pursued a vision for a new grinding plant operational paradigm, made possible by RME's latest Mill Relin

    Sep 13, 2010

  • CIM
    From Drill Core to Metal: A Multi-Disciplined Approach to Flowsheet Development

    By Norman O. Lotter, Virginia Lawson, Mika Muinonen, Dominic Fragomeni, Jorge F. Oliveira

    Development of metallurgical flowsheets from drill core to production of finished metal involves two main domains: process mineralogy to sample the ore and develop a successful flowsheet producing sal

    Jan 1, 2014