Search Documents

Sort by

  • SME
    Rock Mass Characterization For Designing Underground Leaching Stopes

    By D. Boreck

    The Bureau of Mines is conducting research on the feasibility of incorporating in situ stope leaching into active underground metal mines. Stope leaching, a modified in situ leaching technique, prop

    Jan 1, 1991

  • AUSIMM
    Recent Investigations of Submarine Hydrothermal Activity in Indonesia

    By I Zulkarnain, H Permana, R A. Binns

    Through an ambitious but relatively low-cost program of marine fieldwork, laboratory investigations and technology-transfer and training activities, three Indonesia-Australia-led marine expeditions we

    Jan 1, 2004

  • SME
    Weighted ensembles of artificial neural networks based on Gaussian mixture modeling for truck productivity prediction at open‑pit mines - Mining, Metallurgy & Exploration (2023)

    By Wei Victor Liu, Na Zhang, Chengkai Fan, Bei Jiang

    The truck haulage data from open-pit mine sites are usually massive and multidimensional with multi-peak Gaussian distributions. Artificial neural networks (ANNs) are well-known machine learning algor

    Mar 2, 2023

  • AUSIMM
    Managing Geological Intellectual Property and Competitive Advantage - Newcrest Mining LimitedÆs Experience

    By M Berry, F MacCorquodale

    The ownership, management and employment structures operating in the Australian minerals industry have dynamically evolved during the last 30 years. One of the most dramatic changes, from an explorati

    Sep 26, 2013

  • SME-ICGCM
    A Case Study for Multiple Seam Calibration of LaModel in Bump Prone Ground

    By Kevin W. Harris

    Multiple-seam coal mining is a major issue in underground coal mining that adds additional complexity to the practice of ground control. As reserve exploitation is driven by economics, it is now dif

    Jan 1, 2014

  • AUSIMM
    Trials, Tribulations and Triumphs of Unmanned Aerial Vehicle Surveying at St Ives Gold Mine

    By R Steven

    "Surveying, and as a result, surveyors, have been around since the start of time, and it has been said that so has their methodology!The theodolite and tape have been the backbone of a time-tested pra

    Nov 15, 2016

  • SME
    A Discrete Fracture Network Model for Prediction of Longwall‑Induced Permeability (Mining, Metallurgy & Exploration)

    By E. Watkins, S. J. Schatzel, V. Gangrade, K. M. Ajayi, Z. Khademian

    Longwall-induced deformations could jeopardize the mechanical integrity of shale gas well casings positioned in the abutment pillar of a longwall mine. The in situ and induced fracture networks surrou

    Jun 17, 2022

  • DFI
    The Berkeley Art Museum: Using Deep Foundations to Repurpose a Historical Building

    By Timothy Nelson, Simon Burnworth

    "The University of California’s new Berkeley Art Museum and Pacific Film Archive will showcase a collection of art and film in a facility that pairs an existing 1930s-era printing press facility with

    Jan 1, 2017

  • SAIMM
    Investigation of stress in a pothole in the Bushveld Complex: A case study

    By B. P. Watson, D. Hoffmann, D. P. Roberts

    Potholes on the Merensky and UG2 reefs in the Bushveld Complex occur as near-circular to elliptical depressions or slumps on the reef horizon, normally presenting as severe disruptions which prevent e

    Jan 1, 2021

  • SME
    Opportunities For The Mineral Industry In Hazardous Waste Management

    By R. J. Sterrett

    To the average mine operator, the implementation of environmental regulations are viewed as a drain on the profitability of the mine. Since the birth of environmental awareness in the late 1960's

    Jan 1, 1988

  • AUSIMM
    The Design and Installation of a Booster Fan at Tahmoor Colliery

    By M Ogle

    "Booster fans are relatively rare in Australian coal mines. However, as mines become progressivelydeeper it is likely that such fans will be increasingly adopted as a method to sustain or improve the

    Jun 1, 2012

  • AUSIMM
    Demonstrating Efficiency Gains from Installing Truck Turntables at Crushers

    By P A. Grossman, J H. Rubinstein, M Brazil

    The installation of truck turntables at above-ground crushers has the potential to yield gains in efficiency and productivity by eliminating the need for the trucks to turn around and reverse up to th

    Nov 24, 2014

  • CIM
    Boliden Westmin Limited - Gibraltar Mine

    By Harry Siewert, Tom Milner, Jack Stickney

    "LocationThe Gibraltar mine is located in central British Columbia (NTS 93B/9W), 362 km north of Vancouver. Access is provided by 20 km of paved road from McLeese Lake, which lies 45 km north of Willi

    Jan 1, 2000

  • NIOSH
    RI 7258 Effect Of Microstructure On Superconductivity In The Columbium-Hafnium System

    By R. E. Siemens

    The Bureau of Mines sought to correlate the variation of structure-sensitive superconducting properties with microstructure in selected Cb-Hf alloys and to compare the experimental results with those

    Jan 1, 1969

  • AUSIMM
    Whole of mine planning – Evolution Mount Rawdon case study

    By M L, G Maddocks, A Ferrier, ers, A Forbes

    Evolution’s Mount Rawdon Operation (MRO) produces gold and silver through open pit mining methods. The mining operations are scheduled to be completed in FY24 (Financial Year 2024), after which low-gr

    Aug 2, 2023

  • SME
    Dragline Mining And Reclamation At Hobet Mining, Inc.

    By J. E. Lowe

    The unique application of a large walking dragline in the mountains of southern West Virginia was developed and implemented by Hobet Mining, Inc. Hobet is an independent operating subsidiary of Ashlan

    Jan 1, 1993

  • AUSIMM
    Opportunities for rare earth element recovery from waste streams

    By K Clode, J Al-Shdifat, S Daykin

    Planning for a circular economy allows for previously untapped market opportunities to be explored, resulting in new, innovative revenue generating opportunities, while also reducing environmental imp

    Sep 1, 2024

  • ISEE
    Blasting on Parliament Hill, Ottowa, Adjacent to Canada's No. 1 Heritage Building

    By M V. Van Bers, A L. McAnuff, A Curic

    During the Summer of 1997, rock excavation was carried out for construction of the Centre Block Underground Services building (CBUS) abutting the most historically significant structural complex in Ca

    Jan 1, 1999

  • AUSIMM
    Flotation circuit efficiency improvement at Northern Star Resources Limited’s Kanowna Belle gold mine

    By A Nugraha, H Thanasekaran, K Tatetdagat

    The Kanowna Belle gold mine is located in the Eastern Goldfields of Western Australia, approximately 18 km north-east of Kalgoorlie. The processing plant is designed to process 2 Mt/y and has the capa

    Aug 29, 2018

  • AUSIMM
    Augusta Gold-Antimony Mine

    By S Marshall, A Fowler

    The Augusta underground mine at Costerfield in Central Victoria has been in operation since mid 2006; however, AGD Operations Pty Ltd have explored and undertaken open pit operations in the area for o

    Jan 1, 2008