Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Energy efficiency prediction models for air–conditioning systems in underground mining APCOM 2021By N. Duda, P. Śliwiński, P. Stefaniak, B. Jachnik
Ventilation and air-conditioning are some of the most energy-consuming processes in deep underground mining. Additionally, the energy consumption of these processes systematically increases along with
Sep 1, 2021
-
A deep learning approach for automation of joint sets recognition on 3D point clouds of rock mass surfaces APCOM 2021By M. Z. Naghadehi, E. Emami, J. Sattarvand, R. Battulwar
In this paper, a methodology for a computerised recognition of joint sets on 3D point cloud models of rock masses is presented. The process starts with classifying joints on a 3D rock mass surface thr
Sep 1, 2021
-
Optimisation of pit to sag mill network using mixed integer linear programming APCOM 2021By Z. Saw, C. Poveda, N. L. Mai
Optimising the throughput of a mining network comprising all equipment from shovels to semi-autogenous grinding (SAG) mills is a complicated task, yet the potential benefits can be significant. Key mo
Sep 1, 2021
-
Discussion - Of Mr. Lee's Paper on The Corrosion of Water-Jackets of Copper Blast-Furnaces (see Trans., xxxviii., 877)C. D. Demond, Anaconda, Mont. (communication to the Secretary*) :—In order to throw some light on this interesting subject, a series of experiments were made with strips of mild steel, containing abou
Jan 1, 1909
-
Copper Supply Outlook for the 1980 'SBy Alexander Sutulov
1. INTRODUCTION According to the classical economic approach of the open market economy, copper supply should be regulated by market forces which are (a) demand and (b) prices. In fact, demand is o
Jan 1, 1986
-
Calculation Of An Open Pit Operation's CapacityBy Jorgen Elbrond
The calculation of open pit operations' capacities has been the subject of many studies using computer simulations. The common problems of simulation are that if one desires a realistic picture o
Jan 1, 1977
-
P.T. Inco's Indonesian Nickel ProjectBy R. Musu, J. A. E. Bell
P.T. Inco has constructed a smelter to produce 45 000 tonnes (49 500 tons) of nickel per year as a nickel matte from the lateritic ores of Sulawesi, Indonesia. The facilities include mines, five scree
Jan 1, 1979
-
Meandu Rising: The Second Life Of Tarong Coal Project's Meandu Mine - IntroductionBy J. G. Pippenger
Rio Tinto Coal Australia (RTCA) developed Meandu Mine in Queensland, Australia in 1983 to supply thermal coal to the adjacent newly constructed Tarong Power Station (TPS). In designing the mine, RTCA
Jan 1, 2011
-
Application of work renovation planning and systems performance training at Rio Algom's Stanleigh operationsBy Allan A. Este, Bruce Arthur
"Rio Algom's Stanleigh Mine and Mill Operation Was' officially started up in August 1983. In September 1982, Rio Algom contracted Estonix International Inc. from Lively, Ontario, to develop
Jan 1, 1993
-
Applying Today's Global Technologies to Underground Communications Systems? Case Study: Designing A State-of-the-Art Mine Communications SystemBy Charles Tkaczuk
In order to remain competitive the mining industry must keep up with changes in technology. Many innovative technologies from the mining perspective are commonplace in other industries. A ?Global? rev
May 1, 2003
-
Advanced Mixer Settler Designs That Will Optimize Tomorrow's Large Flow Production RequirementsBy M. Giralico
Optimized mixer settler designs will now handle flows of over 25,000 GPM. The size and expense of the equipment hamper experimental settler optimization efforts. Computational Fluid Dynamics (CFD) is
Jan 1, 2003
-
Silicon or Silver? - Imaging's Future Directions as an Analysis Tool for Explosives and Mining Research ActivitiesThe key issue which determines the use of imaging for explosives and mining research is the question - `What information will I gain by using imaging technology?' This paper will address that q
Jan 1, 1995
-
Mining 1n Canada's Sub-Arctic . . . The Iron Ore Company of CanadaBy P. W. A. Mayer
"As the push toward the northern regions of Canada steadily increases to exploit the rich mineral reserves, interest is steadily rising in respect to accessibility and climatic conditions and the prob
Jan 1, 1966
-
Australia's Coal Industry - Where Will it be in the Year 2000?The Australian coal industry has undergone sevenfold growth over the last 30 years and since 1985 has been the world's largest coal exporter. Three quarters of Australia's coal production
Jan 1, 1988
-
Blast Desification Techniques (An Operator's Guide)By Patrick D. McLaughlin, C Fordham
"The project outlined in the accompanying paper was to densify beach sands on the pond side ofa tailings dyke to the strength required for future dyke construction, This was to be achievedthrough the
Jan 1, 1992
-
Improvement On Mathematical Model For Studying Coal's Propensity Of Spontaneous Combustion (dd449287-9a34-46ab-911e-758c3fb8cfd4)By Xinyang Wang
It is believed that sulfur and volatile matter contents in coals are the main intrinsic properties to cause the self-heating of coal. Their oxidation at lower temperatures than that of fixed carbon to
Jan 1, 2013
-
Occidental's Resorts 7 and 8 Blasting Design and ResultsBy Thomas E. Ricketts
Occidental Oil Shale, Inc. constructed two commercial-sized modified in situ (MIS) retorts, Retorts 7 and 8, at its Logan Wash Oil Shale Mine in February and April 1981, respectively. One of the prima
Jan 1, 1984
-
Timely Mine Production Reporting And Mine Planning Utah Copper Division's Bingham Canyon MineBy G. Paul Anderson
Personnel at Utah Copper Division's Bingham Canyon Mine use current computing technology to compile pertinent production statistics and mining plans. Within hours after the day's work has be
Jan 1, 1977
-
The Northeast Tripp Slide - A 11.7 Million Cubic Meter Wedge Failure at Kennecott's Nevada Mine DivisionBy Victor J. Miller
The Northeast Tripp Slide is one of the larger slope failures that can be attributed to open pit mining. It is a 11.7 million cubic meter (15.3 x l0 6 yd3) wedge failure created by two thick gouge-fil
Jan 1, 1983
-
Institute of Metals Division - A Discussion of the Importance of Line Tension on Cottrell's Theory of the Sharp Yield PointBy J. M. Roberts, D. M. Barnett
The activation energy required to break a pinned dislocation line away from its condensed atmosphere of impurity atoms is calculated as a .function of applied stress, without neglecting line tension.
Jan 1, 1963