Search Documents

Sort by

  • TMS
    EAF Dust Processing in the Gas-Fluid Flame Reactor Process

    By C. O. Bounds

    Management of emission control dust from electric? arc furnace (EAF) steelmaking as an RCRA-EPA listed hazardous waste places economic and environmental pressures on the steelmaking industry. Horsehea

    Jan 1, 1990

  • SME
    Empirical Approach Based Estimation of Charge Factor and Dimensional Parameters in Underground Blasting "Mining, Metallurgy & Exploration (2021)"

    By VIVEK KUMAR HIMANSHU, M. P. Roy, P. K. Singh, A. K. Mishra, RAVI SHANKAR

    Blasting with the aim to reduce oversize boulders in underground has many hurdles due to limited accessibilities and poor site conditions. Optimized drilling and blasting parameters can help to achiev

    Jan 4, 2020

  • AUSIMM
    Lifestyle in Fly-in, Fly-Out Operations Versus Residential Operations: A Personal Comparison and Choice

    This report will differ slightly from the traditional scientific and technical discussions given at this type of conference. It will focus on the personal experiences and choices that I undertook when

    Jan 1, 2005

  • SME
    Uranium Resource Assessment Through Statistical Analysis Of Exploration Geochemical And Other Data

    By Jr. Koch

    In the Hydrogeochemical and Stream Sediment Reconnaissance (HSSR) phase of its National Uranium Resource Evaluation (NURE) pro¬gram, the U.S. Department of Energy (DOE) samples about 1400 sites for st

    Jan 1, 1980

  • SME
    Have Aggregates - Will Travel

    By B. J. Timmons

    An initial point that I would like to make very emphatically?and as our title might erroneously suggest for those of you old enough to remember . . . Peter Harben and myself do not intend to shoot our

    Jan 1, 1987

  • NIOSH
    IC 9062 Microcomputer-Based Instrumentation System For Monitoring Ground Support In A Deep Mine Shaft

    By J. K. Whyatt

    This report describes a microcomputer-based instrumentation system for structural monitoring of the circular, concrete-lined Silver Shaft in northern Idaho, The 1-ft-thick concrete lining and surround

    Jan 1, 1986

  • SME
    Wetlands - A Coal Mine Permitting Challenge

    By Kent D. Gastreich

    As the number of prime surface coal mining sites diminishes with time and with the potential for increased coal demand, areas that were previously not mined because of their difficult mining condition

    Jan 1, 1980

  • SME-ICGCM
    Three Dimensional Analysis of Strain and Ground Surface Displacement Caused By Underground Mining in the Vicinity of Geotechnical Barriers

    By Rafal Misa

    In order to prevent the formation of mining damage or to reduce its reach, it is advisable to look for technical solutions which would enable effective protection of construction sites from the impact

    Jan 1, 2014

  • CIM
    Shaft Sinking at Rouyn Merger Gold Mine

    By L. J. Cunningham

    Introduction The property of Rouyn Merger Gold Mines, Limited, is in Rouyn and Joannès townships, Western Quebec, seven miles east of the town of Rouyn. Traversing it is the east-west trending Cadi

    Jan 1, 1948

  • CIM
    Sampling Design To Best Capture The Aging Of In-situ Tailings: Results And Lessons Learned

    By John Rowson, Caitlin Brown, Kebbi Hughes, Joseph Esslifie-Dughan

    The McClean Lake mill in northern Saskatchewan, Canada, is operated by Orano Canada Inc. and has been in production for the last 20 years. The tailings preparation process at the mill has been designe

    Jan 1, 2020

  • NIOSH
    RI 6339 compressive strength versus

    By Robert T. Beckman

    The results of a preliminary investigation of compressive strength versus length-diameter (L/D) ratios of potash specimens and the statistical treatment of the data are summarized in this report. The

    Dec 1, 1963

  • NIOSH
    RI 9038 Testing Materials for Support-Wall Construction

    By Kenneth E. Hay

    The Bureau of Mines collected coal and coal waste aggregate material from two different mine sites to determine their strength characteristics for use in concrete. The concrete would be placed undergr

    Jan 1, 1986

  • NIOSH
    OFR-66-77 Operational Start-Of Shift Inspection Procedures For Mobile, Self-Propelled Surface Mine Equipment

    By Barton K. Cross

    The objectives of this effort were to: 1) Develop and validate start-of-shift operational inspection procedures to be used by operators of mobile, self-propelled equipment used in surface mining opera

    Jan 1, 1977

  • AIME
    Institute of Metals Division - Diffraction Patterns and Crystal structure of Si3N4 and Ge3N4 (Correction, p. 316) - Discussion

    By W. C. Leslie, R. M. Fisher, K. G. Carroll

    J. S. Bowles and J. K. Mackenzie (Commonwealth Scientific and Industrial Research Organization, Mel- bourne, Australia)—The authors are to be congratulated for giving the first direct experimental pro

    Jan 1, 1953

  • NIOSH
    Experimental Procedure - Materials , Equipment, And Analytical Techniques

    Four actual coal mine waters were used in various phases of the research program. All were from the Sewickley Creek area In Westmoreland County, Pennsylvania. The BCR designations, site locations, and

    Jan 1, 1971

  • SME
    An Integrated Multi-Criteria Approach To Enhancing The Business Value Of Community Investment At Mine Sites

    By A. M. Esteves

    This paper addresses the question ?What constitutes the right level of investment in community goodwill?? Mining companies are still grappling with this subject even though the business case for commu

    Jan 1, 2007

  • SME
    Determination of natural background concentrations of dissolved components in water at mining, milling and smelting sites

    By R. L. Jones, D. D. Runnels, D. P. Dupon, D. J. Cline

    To establish meaningful remediation goals and monitoring programs in areas disturbed by mining and associated industries, it is desirable to determine the natural concentrations of metals that existed

    Jan 1, 1999

  • AIME
    The Application Of An MIP Model To The Optimal Siting And Production Scheduling For A Centralized Coal Preparation Plant

    By Raja V. Ramani, Ralph W. Barbaro

    This paper presents an application of a Mixed Integer Programming (MIP) model to the problem of locating a centralized coal preparation plant and determining the production schedule for the mines. The

    Jan 1, 1983

  • SME-ICGCM
    Acoustic Scanner Analysis of Borehole Breakout to Define the Stress Field Across Mine Sites in the Sydney and Bowen Basins, Australia

    By S. MacGregor

    The role of horizontal stress, its orientation and magnitude, in defining the behaviour of strata in underground coal mines has been well established. Poor panel layouts have led to gate end stress co

    Jan 1, 2002

  • DFI
    Evaluating Geotechnical Resiliency Solutions in New York City

    By Karen C. Armfield, Gisele R. Passalacqua, Joanna Smith

    When selecting a solution for improving resiliency at facilities, such as airports, utility and transit sites, there are many options to protect structures and equipment against potential flooding. Ea

    Jan 1, 2018