Search Documents

Sort by

  • DFI
    Special Foundation Systems - Introduction

    By D. A. Greenwood

    Dr David Greenwood opened the first technical session of the conference by highlighting the diverse nature of the papers in this session but drawing attention to the common theme that each solved a pa

    Jan 1, 1991

  • SAIMM
    Meeting The Milestones: Are South African Small-To Medium-Scale Mines Up To The Task? - Synopsis

    By J. J. Dekker

    Controlling noise has proven difficult in mining, and noise-induced hearing loss (NIHL) remains common. In 2008, a South African Mine Health and Safety Council study focused on small- to medium-sized

    Jan 1, 2011

  • AUSIMM
    Martha Mine Tailings Storage Facilities ù How Do They Stack Up?

    By K M. Brodie, D I. K McLeod, J Ruddock

    Environmental incidents involving mine tailings and waste rock inevitably become highly publicised and serve to damage the credibility of the entire industry. The recent serious incident involving a s

    Jan 1, 2002

  • ABM
    PLUG & WORK IN 3D – NEW WAYS IN RAPID PROFESSIONAL COMMISSIONING

    By Detlef Ehlert

    With the proven “Plug & Work” concept developed by SMS Siemag, automation systems are tested and optimized in the test field in a near-reality environment before being shipped and commissioned at

    Aug 16, 2017

  • SAIMM
    Analysis of rock avalanches generated by large planar rock slides by means of numerical methods for discontinua

    By R. Ribacchi, P. Tommasi, C. Consorti, P. Campedel

    The runout of dry blocky rock avalanches produced by planar rockslides affecting a limestone formation with clayey interbeds is analysed by means of distinct element modelling. Numerical analyses are

    Jan 1, 2003

  • SME
    Environmental Evaluation of Mining Systems

    By P. Schmieder

    "The close vicinity of mining companies to other sites that are used for commercial and residential purposes or to areas under conservation as well as the fact that the people become more and more sen

    Jan 1, 2005

  • AUSIMM
    Orogenic Gold Deposits – A Two-stage Process of Gold Enrichment

    By R R. Large

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The formation of orogenic gold deposits is commonly a two-stage process. The first stage in

    Mar 18, 2015

  • SAIMM
    Piloting Of The Ishigaki Fibre-Wakishimizu (Fibre Media Rapid Filtration Equipment) At Skorpion Zinc ? Summary (4cb2c708-51b2-4b55-8a1e-390793b28d6a)

    By H. F. Fuls

    The quality of Pregnant Leach Solution (PLS) at Skorpion Zinc is of utmost importance for efficient operation of the Solvent Extraction (SX) Plant. Suspended solids in the PLS forms CRUD in the settl

    Jan 1, 2008

  • SAIMM
    Piloting Of The Ishigaki Fibre-Wakishimizu (Fibre Media Rapid Filtration Equipment) At Skorpion Zinc - Summary

    By K. Nong, H. F. Fuls

    The quality of Pregnant Leach Solution (PLS) at Skorpion Zinc is of utmost importance for efficient operation of the Solvent Extraction (SX) Plant. Suspended solids in the PLS forms CRUD in the settl

    Jan 1, 2007

  • SME
    Assessment of equipment operator?s noise exposure in western underground gold and silver mines

    By Ellsworth R. Spencer

    An assessment of U.S. western hardrock miners? noise exposures was conducted as part of a multi-year National Institute for Occupational Safety and Health (NIOSH) survey of noise exposures in each sec

    Jan 3, 2010

  • CIM
    Stress Measurements at Great Depth at Craig-Onaping Mines, Sudbury Canada

    Reliable estimation of in situ stress is a major step in the analysis and design of underground excavations in rock, particularly for evaluating the stability of underground structures to prevent fail

    May 1, 2009

  • CIM
    Analyzing Shovel Tooth Wear Patterns with an Automated Machine Vision System

    By Matthew A. Baumann

    Tooth-wear on mining shovels requires continuous monitoring. Worn teeth impede excavation performance, increase energy usage, and increase the risk of lost or broken teeth and adapters. A machine-visi

    Nov 1, 2011

  • NIOSH
    RI 9448 - Seismicity and Stress Changes Subsequent to Destress Blasting at the Galena Mine and Implications for Stress Control Strategies

    By P. L. Swanson, F. M. Boler

    The U.S. Bureau of Mimes conducts research at the Galena Mine, Wallace, ID, with the aim of mitigating the effects of rock bursting. Destress blasting is commonly used as a stress control technique at

    Jan 1, 1993

  • NIOSH
    OFR-66-75 Excavation Of Coal Using A High Pressure Water Jet System

    By David A. Summers

    Coal is increasingly viewed as one of the major fuel resources of this country for the remainder of this century. The need to extract a greater percentage of the coal in a given seam, together with ad

    Jan 1, 1974

  • NIOSH
    Bulletin 229 Fifty Nine Coal Mine Fires

    By G. S. Rice, J. W. Paul, M. W. VONBERNEWITZ

    This bulletin abstracts and reviews essential details of reports on 59 fires in different coal mines in the United States, describes the circumstances of origin and the methods of controlling or extin

    Jan 1, 1927

  • SAIMM
    Quantifying Stable Hangingwall Spans Between Support Units

    The current methodology to design stope support systems in South African gold and platinum mines is based upon the tributary area concept. The discontinuous nature of the hangingwall rock is not adequ

    Jan 1, 2000

  • AUSIMM
    Lessons from the S11D Truckless Mining Project

    By T Atchison

    The Vale Ferro Carajßs S11D project in northern Brazil is based on the movement of unprecedented volumes of waste and ore for mobile in-pit crushing and conveying or ætrucklessÆ systems. In peak years

    Aug 12, 2013

  • SAIMM
    A Rock Mass Rating System For Evaluating Stope Stability On The Bushveld Platinum Mines

    By B. P. Watson

    Several large falls of ground occur annually in the narrow, tabular stopes mined in the Bushveld Complex. These falls comprise safety risks and cause substantial production losses and compromise effor

    Jan 1, 2004

  • SME
    Grade control in mineral sands – The unique conditions at Old Hickory, Virginia

    By A. J. Romeo

    The Old Hickory heavy mineral ore body, which lies within the Fall Zone of south central Virginia, has been mined since 1997. There are many differences in this deposit when compared to humate-laden m

    Jan 1, 2005

  • DFI
    Summary Of Pile Adhesion And Creep Data From Central Artery/Tunnel Project Test Programs - Summary

    By Francis D. Leathers

    Four friction pile load test programs, including 23 tension tests and 9 compression tests, have been performed as part of the Central Artery/Tunnel Project in Boston, Massachusetts. The tests, perform

    Jan 1, 1994