Search Documents

Sort by

  • AUSIMM
    Dry Cover Trials at Mt Whaleback ù A Summary of Overburden Storage Area Cover System Performance

    By P Waters

    BHP Billiton Iron Ore initiated a program in January 1995 at the Mt Whaleback operation in Newman, Western Australia to develop a closure plan for the overburden storage areas (OSA), which have the po

    Jan 1, 2003

  • AUSIMM
    Further Improvement to a Safe and Efficient Procedure to Blast, Excavate and Dispose of a Reactive Rock Type

    By Ash M

    The world-class iron ore mines at Mt Whaleback, Torn Price and Paraburdoo located in the Hamersley Province of Western Australia must mine the Mt McRae Shale to obtain high grade ore from the Dales

    Jan 1, 1995

  • NIOSH
    Longwall Coal Mine Respirable Dust Sources - Objective

    Identify specific sources and the relative levels of contribution of various components of longwall shearer operations to the total airborne respirable dust generated during mining. Approach A

    Jan 1, 1984

  • SME
    Hydraulic Pulse Generator For Nonexplosive Excavation (10f1a281-9a0e-412e-ac65-1440a2c270ad)

    By J. J. Kollé

    A compressed-water hydraulic pulse generator (HPG) for nonexplosive blasting of rock and con¬crete is described Energy is stored in the HPG by compressing water to ultrahigh pressure. A large, fastope

    Jan 1, 1997

  • SME
    Validation Of Seismic Tomography To Detect Stress In An Underground Mine

    By J. Jordan, D. K. Denton, D. Tesarik, D. F. Scott, T. J. Williams

    Personnel from the Spokane Research Laboratory of the National Institute for Occupational Safety and Health integrated the results of studies from a seismic tomographic survey, a finite-difference ana

    Jan 1, 2004

  • AUSIMM
    The Sydney Harbour Colliery, Balmain

    By Bahsford A

    The presence of coal in the Sydney area was confirmed in 1891 when Cremorne Bore No. I intersected cindered coal at 1 854 m. The decision to develop Sydney Harbour Colliery was based on the results

    Jan 1, 1988

  • AUSIMM
    Queensland Nickel - Value Added Products from Technological Advances

    The Yabulu refinery of Queensland Nickel Pty Ltd located near Townsville now imports more than three million wet tonnes per year of nickel laterite ore from New Caledonia and Indonesia, making it th

    Jan 1, 1995

  • AUSIMM
    Hydrothermal Processes, Sulphide Deposits and the Ocean Drilling Program

    The Ocean Drilling Program is the largest international geoscience project in the world, and the state-of-the-art drill ship, the JOIDES Resolution, is permanently at sea. Each year there are six sc

    Jan 1, 1996

  • SAIMM
    A Holistic Approach To Control And Optimization Of A PGM Concentrate Flash Drying Unit ? Synopsis

    By D. J. de Clerk

    Global trends stipulate the need to optimize existing assets while reducing environmental impacts. This paper illustrates the procedure that was followed to achieve such goals at one of the coal burni

    Jan 1, 2012

  • AUSIMM
    Mining Environmental Impacts Evaluation in a Karstic Zone using Geographical Information Systems

    Analysis of different environmental scenarios and to represent, spatially, of impacted areas is possible by the use of geoprocessing techniques, specifically Systems of Geographical Information (SIG).

    Dec 6, 2010

  • SME
    Overall Process Effectiveness in industrial Complexes

    By Patrick Ph. D. Kennedy, Osvaldo A. Ph. D. Bascur

    With the revolutionary progress in information and computer technologies, applying the latest information technologies in metallurgical complexes has become a serious challenge to both a major opportu

    Jan 1, 1998

  • NIOSH
    Extendable Aluminum Drilling Post - Objective

    Improve underground long-hole drilling efficiency and safety by developing a lightweight, easily transportable drilling pust that can be adjusted to fit a range of mine opening heights. Background

    Jan 1, 1990

  • NIOSH
    Computer Simulation Of Ground Behaviour And Rock Bolt Interaction At Emerald Mine

    By David C. Oyler, Winton J. Gale, Jinsheng Chen, Christopher Mark

    A collaborative project between RAG Emerald Mine, NIOSH, and SCT Operations was conducted to investigate ground behaviour, reinforcement performance, and stress redistribution in a coal mine entry sub

  • AUSIMM
    Borehole and Surface Geophysical Monitoring, and Simple Modelling of Groundwater Polluted by Waste Leachates

    By Barber C, Buselli G

    Detailed monitoring of point sources of groundwater pollution is expensive due to the high cost of drilling monitoring boreholes. Whether groundwater pollution is due to mining, industrial or domes

    Jan 1, 1988

  • AUSIMM
    Learning from Nuclear Waste Repository Design: the Ground-Control Plan (9344425e-0fdb-451a-8179-1134301c90ee)

    With mining development on hold and other underground works in a slowdown, the development of nuclear wa te repositories takes centre tage on the American rock engineering scene. Three repositorie for

    Jan 1, 1988

  • SME
    Hydraulic Pulse Generator For Nonexplosive Excavation

    By J. J. Kollé

    A compressed-water hydraulic pulse generator (HPG) for nonexplosive blasting of rock and concrete is described. Energy is stored in the HPG by compressing water to ultrahigh pressure. A large, fast-op

    Jan 1, 1998

  • NIOSH
    RI 9247 - Effects of Abandoned Multiple Seam Workings on a Longwall in Virginia

    By Gregory J. Chekan

    In order to reduce waste and improve resource conservation, mine planning, and development, the U.S. Bureau of Mines is investigating multiple seam interactions associated with longwall mining. Longwa

    Jan 1, 1989

  • AUSIMM
    Improving Autogenous/Semi-Autogenous Grinding Performance and Energy Efficiency with Optimised Pulp Lifter Design

    The comminution process indicates that the most energy-efficient comminution system would be one where the particles leave the breakage field as soon as they reach product size. Contrary to the free f

    Jan 1, 2009

  • AUSIMM
    Learning from Nuclear Waste Repository-Design: The Ground-Control Plan

    With mining development on hold and other underground works in a slowdown, the develop- ment of nuclear waste repositories takes center stage on the American rock engineering scene. Three repositor

    Jan 1, 1987

  • AUSIMM
    Predicting Machine Cutting and Cutter Wear Rates for Mining Applications

    By Trueman R

    If continuous mining systems are to be successfully applied in metalliferous mines then reliable models will be needed to predict rock cutting machine advance and tool wear rates for effective machi

    Jan 1, 1995