Search Documents

Sort by

  • CIM
    Towards a Robotic Refurbishment Process of Industrial Buildings

    By K. Iturralde

    The topic of this article is the automation and robotization in refurbishment processes of industrial buildings. The need to mold these production spaces is quite universal. Particularly in the region

    Aug 1, 2013

  • DFI
    Evaluation Of The Effect Of Vertical Load On The Impedance Function In Seismic Analysis Of Soil-Pile-Structure Interaction

    By Ahmad Mahboubi

    The damage caused by catastrophic earthquakes has always been an incentive towards more sophisticated building codes and requirements. In parallel to computer technology development, the engineers? at

    Jan 1, 2010

  • CIM
    Ventilation Design and Operating Issues Relating to Underground Mines with High Elemental Sulphur Content

    "The ventilation-related risks from mines with elemental sulphur include dust explosions, spontaneous combustion with emission of heat and toxic sulphur dioxide or hydrogen sulphide gases, reactions w

    Jan 1, 2019

  • CIM
    Study of Re-Entry Time Post Blasting at Ciguha PT Antam Ubpe Pongkor Underground Gold Mine

    By P. H. Agson Gani, T. Sitorus, N. P. Widodo

    "PT ANTAM UBPE Pongkor underground mine use blasting to develop its tunnels which will cause poisonous and dangerous gases trapped inside mine. To analyze this case, a study of mine ventilation, the d

    Jan 1, 2019

  • ISEE
    A Practical Approach for Blasters to Determin The Optimal Bench Blasting Conditions

    By Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan

    In the bench blasting, the realisation of an economic, and safe blasting is only possible with a reliable blasting design on condition that considering all sequential activities such as drillingblasti

    Jan 1, 2004

  • AUSIMM
    Tunnel Boring Machine Usage Speeds up Development at Stillwater Mine

    By D Willis, A Shanahan, C Jacobs, T Luxner

    The application of tunnel boring machines (TBM) for reef mining is a unique practice with benefits over current mining methods given the right geology and geometry of the orebody. The Stillwater Minin

    Sep 17, 2014

  • NIOSH
    Bulletin 181 Abstracts of Current Decisions on Mines and Mining

    By J. W. Thompson

    MEANING OF TERM, The term "minerals" when used in grants or in reservations or instruments of conveyance is not limited to metals or metalliferous deposits, whether contained in veins that have well-

    Jan 1, 1919

  • CIM
    Boundary Dam Mine

    By J. Keith Haddock

    "Introduction The Boundary Dam Mine is located 5 km south of the City of Estevan, Saskatchewan and is operated by Manitoba and Saskatchewan Coal Company Ltd., one of the Luscar companies. The entire p

    Jan 1, 1985

  • SME
    Full-Face Shaft Sinking At The Atomic Energy Of Canada Limited Underground Research Laboratory

    By G. W. R. Kuzyk

    The Underground Research Laboratory (URL) , a major geotechnical research facility, is currently being developed by Atomic Energy of Canada Limited (AECL) , 120 km northeast of Winnipeg, Manitoba. The

    Jan 1, 1989

  • IOM3
    Minerals '98

    By J. D. G. Groom

    The introduction to a selection of papers from the Minerals '98 professionals' conference, held in London, 24 June 1998 as part of a week of activities supported by 13 professional and trade associati

    Jun 21, 1905

  • AUSIMM
    Conventional and real-time sampler comparison study for inhalable and respirable dust

    By B Walsh, M Cattani, S Verpaele

    With the increasing sophistication of real-time sampling devices for occupational hygiene exposure assessment, research to objectively assess their performance is a priority. Using real-time monitorin

    Apr 16, 2024

  • AUSIMM
    The Mine Land Rehabilitation Authority – reducing risk for Victoria

    By R Mackay, J Brereton

    On 30 June 2020, the Mine Land Rehabilitation Authority (the Authority) superseded the Latrobe Valley Mine Rehabilitation Commissioner as the independent overseer of Victoria’s declared mine rehabilit

    Aug 2, 2023

  • CIM
    Development of the Drumbo Gypsum Mine, Ontario

    By RAYMOND C. HARTVIKSEN

    The Drumbo Mine is located near Highway 401 between Woodstock and Kitchener in southwest Ontario. The tabular flat-lying gypsum bed is between 1.5 to 2.4 m thick and is situated near the base of the S

    Jan 1, 1984

  • DFI
    Piling Framed Tie down Concrete Retaining Wall

    By Saieb Haddad, Henry Pate

    "Building retaining walls in an urban area is becoming more difficult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for ins

    Jan 1, 2007

  • DFI
    Piling Framed Tie Down Concrete Retaining Wall (4e2f4102-889f-44e0-a228-adb5cc7c450f)

    By Saieb Haddad, Henry Pate

    "Building retaining walls in an urban area is becoming more diffi cult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for in

    Jan 1, 2007

  • AUSIMM
    Independent Decline Haulage at Kanowna Belle Gold Mines

    In May 2000, Kanowna Belle Gold Mines (KBGM) carried out a detailed Truck versus Shaft Haulage Study. The study showed that whilst the shaft option had many operating cost benefits the capital costs w

    Jan 1, 2002

  • SME
    Application of Borehole Imaging for Detection of Rock Fracture Zone and Improvement of Roadway Stability

    By X. Song, Q. Zhang

    "The development of fracture zones in surrounding rock mass has significant impact on the stability of underground mine roadways. Detection of the fracture zones is of compelling importance for mainta

    Jan 1, 2016

  • DFI
    A Study on Bearing Capacity of Waveform Micropiles Using Centrifuge Test

    By Chengcan Wang, Jin-Tae Han, Young-Eun Jang

    "The waveform micropile is a newly developed foundation type for increasing the bearing capacity with the created shear keys on the pile’s shaft. Analyzing the increment of resistance at the shear key

    Jan 1, 2016

  • CIM
    Improving Concentrate Loadout Availability with Specialised Containers and an Upgraded Filter Press at the Nunavik Nickel Project Concentrator

    By M. Girard, C. Farsangi, N. Singh

    "Canadian Royalties Inc. owns and exploits the Nunavik Nickel Project: a copper and nickel deposit in Nunavik, Québec. The nickel and copper concentrates are filtered by plate and frame filter presses

    Jan 1, 2019

  • SME
    The Kingston Project Nevada Goldfields' Initial Mining Operation

    By A. E. Jack Swanson, Brian P. Micke

    INTRODUCTION Nevada Goldfields began underground mining development at the Kingston Project in September, 1986, followed by mill start-up in March, 1987. The first gold pour in April followed thre

    Jan 1, 1987