Search Documents

Sort by

  • CIM
    Project Environmental Approval

    By B. R. Boardman

    Project Environmental Approval is a multi-faceted issue. From a mining perspective, it is a costly item because of avoidable time delay. The government perspective is that the approvals are a necessar

    Jan 1, 1978

  • CIM
    Corporate Social Responsibility in the Czech Coal Mining Industry

    By V. Budinsky

    In recent years the global mining industry has addressed its social and environmental responsibilities and numerous factors have contributed to this. Corporate Social Responsibility (CSR) is an import

    Aug 1, 2013

  • AUSIMM
    Upstream Raising of Laterite Nickel Tailings Storage Facilities

    By D A. Williams, J C. J Boshoff

    The properties of tailings that emanate from laterite nickel processing plants are significantly different to most other mine tailings. They typically comprise a mixture of fine materials that are mad

    Jul 27, 2015

  • AUSIMM
    The Implementation of Paste Fill at the Henty Gold Mine (e808b65b-096a-41b0-a461-dc39eb272114)

    By Jardine G, Woodall C

    The Henty Gold Mine, located in Western lasiuania use, uuiusatise solutions to effectively manage a mining operation in an environmentally sensitive setting and has been presented with several envir

    Jan 1, 1998

  • CIM
    Rare Earth Elements in Malaysia: Overview of Processing, Sustainability and Environmental Impact

    By Nessetech Consulting, L. A. Cisternas, E. D. Galvez, S. H. Kuan, L. H. Saw

    "In Malaysia, there were two rare earths processing plants namely Asian Rare Earth (ARE) and the Malaysian Rare Earth Corporation Plant (MAREC) in Perak, which were operated until 1992 and were subseq

    Jan 1, 2016

  • TMS
    On the Relationship Between Hardening and Softening Processes and the Austenite-to-Ferrite Phase Transformation in Steel

    By David N. Hanlon

    The effect of high-temperature plastic deformation of the austenitic phase (y) on the subsequent phase transformation to ferrite (a) has been experimentally investigated, and modelled using a physical

    Jan 1, 2001

  • SME-ICGCM
    Calibrating the LaModel Program for Shallow Cover Multiple? seam Mines

    By Morgan Sears

    The LaModel program (Heasley, 1998) is a displacement discontinuity, boundary element model (BEM) for analyzing stresses and displacements in single and multiple-seam coal mines. After the Crandall Ca

    Jan 1, 2013

  • AUSIMM
    Learnings from review of drawpoint management across New South Wales mines

    By X Hill

    Throughout the 2016/2017 financial year, the NSW Resources Regulator conducted an assessment of each underground metalliferous operation across the state to assess how each operation managed the princ

    Oct 16, 2017

  • SME
    Roof and Pillar Failure Associated with Weak Floor at a Limestone Mine

    By J. L. Ellenberger, T. Miller

    "A limestone mine in Ohio has had roof instability problems that have led to massive roof falls extending to the surface. This paper describes a collaborative study of these events undertaken by the N

    Jan 1, 2015

  • DFI
    Session 16 "Deep Mixing Method IV"

    By Mary Ellen Bruce

    Let me first address the issue of the wet grab samples. The wet grab samples that were attempted to take on the Central Artery were hindered by the fact that the way the mixing was being done was only

    Feb 10, 2003

  • AUSIMM
    Blast Design and Vibration Control at Kayad Lead-Zinc Underground Mine

    By P S. Jaitawat, M Sarim, M P. Roy, P K. Singh, A Joshi

    Mining is being carried out using the sublevel open stoping method at the Kayad underground mine. The mine will ultimately reach a depth of 390 m. Kayad village is only 100 m (horizontally) from the u

    Aug 24, 2015

  • SME-ICGCM
    Mechanics of Horizontal Movements Associated with Coal Mine Subsidence in Sloping Terrain Deduced From Field Measurements

    By Ken W. Mills

    The ground movements associated with underground coal mining and, in particular, longwall mining, are recognised to include horizontal subsidence movements, but the mechanics of the processes that cau

    Jan 1, 2014

  • CIM
    Reducing Water Usage in Gold Treatment—What is Possible

    By Erik Spiller

    "Water and cyanide are highly contentious and conflict issues that many gold mining companies encounter worldwide when dealing with local farming communities, industries and cities competing for water

    Jan 1, 2017

  • SME
    Tunnel Vision: Planning a Resilient 21st Century Wastewater System for Houston - RETC2021

    By Brian Gettinger, Jared Barber, Richard Weatherly, Shannon Dunne, Jeff Masek, Chuck Wolf, Fazle Rabbi, Jack Canfield

    During Hurricane Harvey over 60% of the 39 WWTPs, including the low-lying 25 MGD Sims North WWTP, and one third of the 382 lift stations owned and operated by the City of Houston were flooded resultin

    Jun 13, 2021

  • IOM3
    Preliminary modelling of groundwater inflows at Gays River mine, Nova Scotia, Canada

    By R. Macleod, G. G. Bursey, T. R. C. Aston, J. E. Gale

    In 1991 the problems of water inflow at the mine were addressed by a three-phase study. A three-dimensional finite-element computer code, CFEST (Coupled Fluid, Energy and Solute Transport), was used t

    Jan 12, 1993

  • SAIMM
    A practical approach to determine the role of rockbolts in stoping gullies

    By J. P. Gouvea, T. R. Stacey

    A research project was carried out on a gold mine in the Vaal River region of South Africa (Witwatersrand Basin) to evaluate the effect of two particular aspects of rockbolt installation – the angle o

    Feb 12, 2024

  • AUSIMM
    Ventilation contaminant characterisation for a greenfield project

    By A Hatt

    This paper presents a case study of characterisation work undertaken at a greenfield exploration project to provide engineering and OH&S inputs for the design of a ventilation system. The paper discus

    Oct 12, 2022

  • DFI
    Deep Drilled Shafts For The Pearl Harbor Memorial Bridge New Haven, Connecticut

    By Theodore von Rosenvinge

    Large diameter (2.4 meter) drilled shaft foundations were installed to depths of over 62 meters through soil into Arkose bedrock for Connecticut?s Pearl Harbor Memorial Bridge (I-95 over New Haven Har

    Jan 1, 2011

  • SME
    Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023

    By Victor Despointes, Stephane Polycarpe, Kathryn Kelly, Chris Feeney, Brian Hann, Vojtech Ernst Gall

    The Pawtucket Tunnel is a 2.2-mi, 30.2-ft diameter CSO storage tunnel in Rhode Island. The primary tunnel is built using a dual-mode open-EPB TBM capable of sealing the face within 120 seconds to mana

    Jun 13, 2023

  • AUSIMM
    Geomorphic design and landscape evolution modelling for best practice mine rehabilitation

    By G R. Hancock, J F. Martín Duque

    Post-mining landscapes are required to geomorphologically and ecologically integrate with their surrounds (Martín Duque et al., 2015). Designing and constructing an erosionally stable landform is

    Jul 25, 2018