Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Be Open to Closure - It Can Save You MoneyBy J Heyes
Historically mining engineers haven't spent enough time planning waste dumps, but waste movement costs often outweigh ore haulage costs. There is a real incentive to plan waste dumps right the fi
Jan 1, 2009
-
An assessment of the rate of construction of an upstream raised tailings damBy J J. Moreno, J Willis, P Garvey
Many of the tailings storage facilities (TSFs) in Australia are upstream raised facilities for which the consolidation of the hydraulically deposited tailings is essential to the stability of the TSF.
Jul 1, 2021
-
Design And Application Of Vertical Micropiles To Resist Large Lateral LoadsBy Helen D. Robinson
Traditional practice to resist large lateral loads on foundations is the use of large diameter caissons, battered driven piles, or battered micropiles. Dense urban construction environments, however,
Jan 1, 2010
-
Refurbishment Of A Piled Commercial Building With A Single Level Basement For A 70% Increase In Floor AreaBy Henry H. Tayler, Eric Sturel
1 Triton Square was originally a six-storey building with a one-level basement located within a commercial development near Euston, London. It was designed and constructed in the 1990s and the foundat
May 1, 2022
-
Monitoring of Erosion Risk in Surface Mining Area using a Satellite Image and Geographic Information System – A Case Study in the Indonesia Coal Mining AreaBy S Maryati
Surface mining activities disturb large areas, produce great sediment loads and tend to be a source of water pollution if they are not managed properly. Coal mining in Indonesia has a very high risk o
Nov 22, 2011
-
Maintenance Of Aerial TramwayBy A. F. MacDonald
The rugged foothills of the Allegheny Mountains in Washington County, Southwestern Pennsylvania, lend their terrain very well to the use of aerial tram systems to carry refuse from Bethlehem Mines&apo
Jan 1, 1966
-
RI 4440 Pilot-Plant Concentration Of Arkansas Aluminum OresBy S. M. Runke
The purpose of the work described in this publication was to determine, on a pilot-plant scale, the practicability of concentrating low-grade bauxite deposits to render them suitable for the extractio
Jan 1, 1949
-
Mining And Exploration Technology - Innovation Sets The Pace In '68 - Open Pit DevelopmentsBy O. T. Berge
Development and production from open cut mines continued its vigorous growth trend during the year 1968. Material handling and transportation were again exposed to the use of larger equipment with sho
Jan 2, 1969
-
Carrapateena Vent Rise Performance – Geotechnical Design and CalibrationBy G Balog, T Ormerod, D Sidea
Carrapateena is a copper-gold sub level caving operation located in the Gawler Craton, South Australia. One of Australia’s largest undeveloped copper deposits, the project will be a 4.25 Mtpa undergro
Mar 15, 2021
-
Ventilation Planning Considerations when Dealing with Hot GroundwaterBy S Bluhm, L van den Berg
In planning mine ventilation systems, heat issues are normally associated with deep-level mines where auto-compression and virgin rock temperatures play a major role. However, a number of mines suffer
Aug 31, 2015
-
Disposal Of Retorted Oil Shale: Principal Issues And Their ManagementBy Devraj Sharma
This paper presents technical issues in the design and management of a retorted oil shale disposal site. Major physical and geochemical mechanisms which affect the disposal are: heat transport, moistu
Jan 1, 1981
-
Case Study Of Efforts To Reduce Costs And Increase Production At A Mid-Sized International Mining CompanyBy M. V. T. Da Silva, J. C. Harrison
Eldorado Gold Corporation of Vancouver, B.C. owns and operates three gold mines. The São Bento underground gold mine in Minas Gerais State, Brazil produced 105,907 ounces in1997. The La Colorada and
Jan 1, 1999
-
Production OperationsBy Lee W. Saperstien
At the heart of the mining process are a number of basic and fundamental tasks whose regular and repeated performance constitute the mining cycle. As will be discussed presently, these tasks are the b
Jan 1, 2008
-
Historical development of the INCO SO2/AIR cyanide destruction processBy G. H. Robbins
"Originally presented at TORONTO 94, CIM-AGM, this paper has been updated to reflect the present status of business development for theSO2/AIR process. The paper reviews the back-ground leading to the
Jan 1, 1996
-
Hydromechanical Processes During In Situ Coal GasificationBy J Liu
In situ coal gasification is a method of extracting a high proportion of the energy value from coal without the need for mining. In situ conversion of coal to combustible gases is achieved by drilling
Jan 1, 2004
-
The necessary role of the geologist in geotechnical data gatheringBy P B. Hills
Almost a quarter of a century since Bridges (1993) documented techniques for the assessment of ground conditions in a seminal paper in the Proceedings Second International Mining Geology Conference, t
Sep 20, 2017
-
Assessing Erosion and Run-Off Performance of a Trial Rehabilitated Mining LandformBy G Hancock, J Lowry, W D. Erskine, D Jones, T Coulthard, M J. Saynor, P Lu
An 8 ha trial landform was constructed in late 2009 at the Ranger Uranium Mine, located 250 km east of Darwin in the wet-dry monsoonal tropics of northern Australia. The objective of the trial, which
Jul 10, 2012
-
Sandgate Avenue Flood Alleviation Project, Stage 1 –Slurry Treatment Plant – Lessons LearntBy M Weeks
Melbourne Water Corporation, through the Pipelines Alliance, has commenced construction of a new drainage pipeline to provide additional flood protection within the Sandgate Avenue Main Drain catchmen
Mar 8, 2011
-
Using Near‑Miss Events to Create Training Videos - Mining, Metallurgy & Exploration (2023)By Brendan Demich, Brendan Macdonald, Timothy J. Orr, Jonathan K. Hrica, CASSANDRA L. HOEBBEL, Jason Navoyski, Jennica L. Bellanca
Haul truck fatal accidents and injuries continue to be a significant concern for the mining industry. However, the availability of high-quality training materials continues to be limited. Near-miss in
Jun 1, 2023
-
Identification and Quantification of Pile RelaxationBy Patrick J. Hannigan, Alex Ryberg, Rozbeh B. Moghaddam
Driven piles are widely used for foundation support. In the vast majority of cases, an increase in pile capacity occurs with time which is referred to as “set-up.” However, in a very limited number of
Jan 1, 2019