Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Making Design and Construction WorkBy S Porter
The Melbourne City Link Project is a privately funded road infrastructure project linking three significant existing freeways in the vicinity of the Central Business District. The State Government, th
Jan 1, 1999
-
In-Pit Crushing And Conveying At Highland Valley Copper (ed32fdb4-81a8-44a9-9ceb-c2871da4e7e5)By A. D. MacPhail
The Highland Valley Copper partnership was formed in July 1986 and was the logical result of a mine with a large ore reserve but no adequate mill, and a mine with a large, modem mill but dwindling ore
Jan 1, 1993
-
Gordie Howe International Bridge Foundations - Drilled Shaft Construction in Challenging Detroit LimestoneBy Jim Glider, Noah Miner
The Gordie Howe International Bridge is a project to build a cable-stayed bridge and border crossing across the Detroit River. With a span length of 2,800-ft (853.4 meters), the Gordie Howe Internatio
Sep 8, 2021
-
Deep Cfa Piles Application For Foundation In QueenslandBy Sameh M. Khella
This paper discusses the application of deep CFA piles for the foundation of structures in different ground stratifications with a focus on the application in Queensland region. Design, construction t
Nov 1, 2022
-
Improving compliance in mining through an effective geoscientific information management frameworkBy S Mundell, A Atkins, S van de Water
Geoscientific information management enables the capture, management and delivery of the original geoscientific observations and measurements of the earth’s natural resources. However, original observ
Nov 8, 2021
-
Assessing the Behaviour of Merensky Reef Crush PillarsBy M. du Plessis, D. F. Malan
"Crush pillars are designed to be in a crushed state whilst being formed at the mining face. The residual stress state of these failed pillars provides a local support function in mining stopes and is
Jan 1, 2015
-
Gibraltar Mine SAG Mill Expansion Grinding Ciruit DesignBy R. J. Rotzinger
The Gibraltar Mine and Mill facility were commissioned in 1972 by Gibraltar Mines Ltd utilizing a flowsheet consisting of two stages of crushing followed by a rod mill / ball mill grinding circuit. Du
Jan 1, 2012
-
Safety at home – this is where mine safety startsBy K Biegaj
During the author’s 25+ year career in mine management in various parts of the world (mostly in Australia), the author has been privileged to live and work in mining towns (not FIFO) for more than 20
May 5, 2022
-
Numerical Modeling of Foundation Deformation Due to Fault Rupture (718b3bb2-ba73-41ae-ad4b-2a32fb89742b)By Orestis Zarzouras, Amalia Giannakou, Jacob Chacko
"When designing structures in seismically active areas, foundations of critical structures are typically located away from known faults. Indeed many seismic codes prohibit construction in the immediat
Jan 1, 2017
-
OFR-22-80 Evaluation Of Proximity Warning DevicesBy J. E. Hipp
Three electrostatic field sensing proximity warning devices were tested using full-scale cranes and power line systems, a scaled model facility, environmental testing facilities, and theoretical/numer
Jan 1, 1980
-
Jet Grouting at the West Toronto Diamond Grade Separation ProjectBy Jim Bruce, Naresh Gurpersaud
"The West Toronto Diamond project, under construction since 2006 and due to be complete in 2015, is a rail-to-rail grade separation project in the heart of urban Toronto. Once complete, a depressed co
Jan 1, 2017
-
Effect Of An Unsaturated Setting On The Hydrology Of In Situ Copper LeachingBy Michael J. Friedel
The permeability and flow capacity in unsaturated media is investigated by the Bureau of Mines for application to in situ copper leach mining at the Cyprus Casa Grande mine site. Moisture retention pr
Jan 1, 1991
-
Practical Aspects Of Corrosion In The Wear Of Grinding Media (ebe1c47f-9c23-4521-96fe-efbad9f5616a)By M. J. Meulendyke
An extensive program of marked ball wear testing (MBWT), laboratory corrosion studies, and worn ball surface analyses has been used to gain insight about the role of corrosion in the overall wear proc
Jan 1, 1984
-
Enabling Advanced Energy Management Practice for Minerals OperationsBy Dean L. Millar
Measures taken by mining companies around the world to reduce their carbon footprints are becoming increasingly important in the sector securing its social licence to operate. The options for measures
May 1, 2011
-
Inrushes and SubsidenceBy S Harvey
An inrush of water or mud into an underground mine, or sudden subsidence above mining voids represent low probability but high impact risks in underground mining. About two such incidents involving mu
Jan 1, 1998
-
Battery Energy Storage As A Way To Reduce Remote Mine Electricity CostsBy Jakob Janzen
This paper demonstrates that the introduction of a Battery Energy Storage System (BESS) into an isolated diesel generator based grid has the potential to reduce the electricity cost and deliver a good
Aug 1, 2013
-
Mineral Development And Land Conservation In Montana's Stillwater District (bc9f553c-0466-42ef-bf85-39ee5c04a836)By Timothy C. Richmond
The Stillwater District is located in south central Montana approximately 75 miles southwest of Billings, the state's largest city. It lies along the northeast front of the Beartooth Mountains an
Jan 1, 1974
-
Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging ProjectBy José Carlos do Amaral, Marcelo Groszownik, Jorge Beim
"Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the
Jan 1, 2015
-
Slope Repairs in a Tight Footprint: Slope Stabilization Using Multiple TechnologiesBy Dan Mahrt
"In June of 2009, a slope failure occurred along River Road in Bismarck, North Dakota. The slope failure affected approximately 300 feet of River Road with vertical displacements up to 3 feet, resulti
Jan 1, 2016
-
Driven Piles In Glacial Deposits Exhibiting Time Dependent CapacityBy Upendra L. Karna
The pile capacity gain with time evaluated and implemented for the construction of the Route 21 Viaduct in Newark, NJ, U.S.A is discussed in this paper. The project consisted of the replacement of mor
Jan 1, 2006