Search Documents

Sort by

  • AUSIMM
    Making Design and Construction Work

    By S Porter

    The Melbourne City Link Project is a privately funded road infrastructure project linking three significant existing freeways in the vicinity of the Central Business District. The State Government, th

    Jan 1, 1999

  • SME
    In-Pit Crushing And Conveying At Highland Valley Copper (ed32fdb4-81a8-44a9-9ceb-c2871da4e7e5)

    By A. D. MacPhail

    The Highland Valley Copper partnership was formed in July 1986 and was the logical result of a mine with a large ore reserve but no adequate mill, and a mine with a large, modem mill but dwindling ore

    Jan 1, 1993

  • DFI
    Gordie Howe International Bridge Foundations - Drilled Shaft Construction in Challenging Detroit Limestone

    By Jim Glider, Noah Miner

    The Gordie Howe International Bridge is a project to build a cable-stayed bridge and border crossing across the Detroit River. With a span length of 2,800-ft (853.4 meters), the Gordie Howe Internatio

    Sep 8, 2021

  • DFI
    Deep Cfa Piles Application For Foundation In Queensland

    By Sameh M. Khella

    This paper discusses the application of deep CFA piles for the foundation of structures in different ground stratifications with a focus on the application in Queensland region. Design, construction t

    Nov 1, 2022

  • AUSIMM
    Improving compliance in mining through an effective geoscientific information management framework

    By S Mundell, A Atkins, S van de Water

    Geoscientific information management enables the capture, management and delivery of the original geoscientific observations and measurements of the earth’s natural resources. However, original observ

    Nov 8, 2021

  • CIM
    Assessing the Behaviour of Merensky Reef Crush Pillars

    By M. du Plessis, D. F. Malan

    "Crush pillars are designed to be in a crushed state whilst being formed at the mining face. The residual stress state of these failed pillars provides a local support function in mining stopes and is

    Jan 1, 2015

  • CIM
    Gibraltar Mine SAG Mill Expansion Grinding Ciruit Design

    By R. J. Rotzinger

    The Gibraltar Mine and Mill facility were commissioned in 1972 by Gibraltar Mines Ltd utilizing a flowsheet consisting of two stages of crushing followed by a rod mill / ball mill grinding circuit. Du

    Jan 1, 2012

  • AUSIMM
    Safety at home – this is where mine safety starts

    By K Biegaj

    During the author’s 25+ year career in mine management in various parts of the world (mostly in Australia), the author has been privileged to live and work in mining towns (not FIFO) for more than 20

    May 5, 2022

  • DFI
    Numerical Modeling of Foundation Deformation Due to Fault Rupture (718b3bb2-ba73-41ae-ad4b-2a32fb89742b)

    By Orestis Zarzouras, Amalia Giannakou, Jacob Chacko

    "When designing structures in seismically active areas, foundations of critical structures are typically located away from known faults. Indeed many seismic codes prohibit construction in the immediat

    Jan 1, 2017

  • NIOSH
    OFR-22-80 Evaluation Of Proximity Warning Devices

    By J. E. Hipp

    Three electrostatic field sensing proximity warning devices were tested using full-scale cranes and power line systems, a scaled model facility, environmental testing facilities, and theoretical/numer

    Jan 1, 1980

  • DFI
    Jet Grouting at the West Toronto Diamond Grade Separation Project

    By Jim Bruce, Naresh Gurpersaud

    "The West Toronto Diamond project, under construction since 2006 and due to be complete in 2015, is a rail-to-rail grade separation project in the heart of urban Toronto. Once complete, a depressed co

    Jan 1, 2017

  • SME
    Effect Of An Unsaturated Setting On The Hydrology Of In Situ Copper Leaching

    By Michael J. Friedel

    The permeability and flow capacity in unsaturated media is investigated by the Bureau of Mines for application to in situ copper leach mining at the Cyprus Casa Grande mine site. Moisture retention pr

    Jan 1, 1991

  • SME
    Practical Aspects Of Corrosion In The Wear Of Grinding Media (ebe1c47f-9c23-4521-96fe-efbad9f5616a)

    By M. J. Meulendyke

    An extensive program of marked ball wear testing (MBWT), laboratory corrosion studies, and worn ball surface analyses has been used to gain insight about the role of corrosion in the overall wear proc

    Jan 1, 1984

  • CIM
    Enabling Advanced Energy Management Practice for Minerals Operations

    By Dean L. Millar

    Measures taken by mining companies around the world to reduce their carbon footprints are becoming increasingly important in the sector securing its social licence to operate. The options for measures

    May 1, 2011

  • AUSIMM
    Inrushes and Subsidence

    By S Harvey

    An inrush of water or mud into an underground mine, or sudden subsidence above mining voids represent low probability but high impact risks in underground mining. About two such incidents involving mu

    Jan 1, 1998

  • CIM
    Battery Energy Storage As A Way To Reduce Remote Mine Electricity Costs

    By Jakob Janzen

    This paper demonstrates that the introduction of a Battery Energy Storage System (BESS) into an isolated diesel generator based grid has the potential to reduce the electricity cost and deliver a good

    Aug 1, 2013

  • SME
    Mineral Development And Land Conservation In Montana's Stillwater District (bc9f553c-0466-42ef-bf85-39ee5c04a836)

    By Timothy C. Richmond

    The Stillwater District is located in south central Montana approximately 75 miles southwest of Billings, the state's largest city. It lies along the northeast front of the Beartooth Mountains an

    Jan 1, 1974

  • DFI
    Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging Project

    By José Carlos do Amaral, Marcelo Groszownik, Jorge Beim

    "Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the

    Jan 1, 2015

  • DFI
    Slope Repairs in a Tight Footprint: Slope Stabilization Using Multiple Technologies

    By Dan Mahrt

    "In June of 2009, a slope failure occurred along River Road in Bismarck, North Dakota. The slope failure affected approximately 300 feet of River Road with vertical displacements up to 3 feet, resulti

    Jan 1, 2016

  • DFI
    Driven Piles In Glacial Deposits Exhibiting Time Dependent Capacity

    By Upendra L. Karna

    The pile capacity gain with time evaluated and implemented for the construction of the Route 21 Viaduct in Newark, NJ, U.S.A is discussed in this paper. The project consisted of the replacement of mor

    Jan 1, 2006