Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Improvements in Control of the Mill 3 Circuit at AlcoaÆs Wagerup RefineryBy D Nicoli, P Feltoe
The operation of grinding circuits are vital to the success of most mineral processing operations in the provision of effective size reduction whilst maximising throughput. However these same circuits
Jan 1, 2000
-
Deep Cover Pillar Extraction In The U. S. CoalfieldsBy Keith A. Heasley, Frank E. Chase, Christopher Mark
Deep cover retreat mining (overburden in excess of 750 ft) is an important emerging issue which will intensify in the future as the more easily mined shallow seam reserves are depleted. Analysis of M
-
Estimating Mine Operating Costs - Trials and TribulationsThe projection of operating costs for mining, processing, and other site operating costs is an exercise which can be fraught with considerable peril. Not only are the physical characteristics of eac
Jan 1, 1990
-
CPT - Guided Installation Of Pressure-Grouted Displacement PilesBy Mark M. Petersen
As part of the addition of eight new combined cycle generating units at the Florida Power & Light Sanford Plant, 2,129 piles were to be installed. The existing plant elements were supported on driven
Jan 1, 2002
-
Risk Management in Blasting: Lessons Learned the Hard WayBy Ralph E. Burnham, Jeff Taylor, Jonson Montgomery, J. Kelly Ratliff, Rennie Montgomery, Martin Brashear
Top priorities for all blasting companies and individual blasters are risk management, safety of company personnel and the general public, regulatory compliance, and liability protection. On a daily b
Jan 1, 2018
-
Shovel-Truck-Pocket-Car LoadingBy T. W. Flemal
Good afternoon gentlemen. To begin, may I say ?thank you? to the AIME for the invitation to be here today to talk about my company's experience with shovel, truck, pocket, to car loading. The oth
Jan 1, 1970
-
Field Trial of a Bulk Mineral for the Assay of Nickel in Lateritic OresBy Garnsey R. G T, Wenk G. J, Toop A, Sowerby B. D
A bulk mineral analyser (BMA) suitable for the determination of Cu or Ni in bulk ore samples has been developed at the Lucas Heights Research Laboratories. This analyser, which uses the nuclear resona
Jan 1, 1983
-
Large Scale Lateral Testing Of Pile Foundations (Young Professor Paper Competition 2010)By Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010
-
Predictable Blasting With In Situ Seismic Surveys (ef361d66-b9fb-4fd5-8b99-babcbd2b934f)By C. D. Broadbent
Open pit blasting can be a low cost routine or a high cost bottleneck depending on geology, environment and the operator's ability to master site conditions. Because blasting is a repetitive oper
Jan 1, 1974
-
New Insitu Instrumentation Technique For Tunneling & Mining Design: Field ExamplesBy Yoshinori Iwasaki, Shosei Serata, Yutaka Mochida
A new comprehensive insitu instrumentation technique named this RCC Method has been developed for rapid assessment and improvement of the structural stability of underground openings. When applied to
Jan 1, 1976
-
Mineralogic Sources Of Metals In Leachates From The Weathering Of Sedex, Massive Sulfide, And Vein Deposit Mining WastesBy S. F. Diehl
Weathered mine waste consists of oxidized primary minerals and chemically unstable secondary phases that can be sources of readily soluble metals and acid rock drainage. Elevated concentrations of met
Jan 1, 2011
-
Excavation Support At The Capitol Visitor Center In Washington DCBy Harald Ludwig
In 2002, excavation support work commenced on the Capitol Visitor Center project located adjacent to the nation?s Capitol building in Washington, D.C. The outlying work (Slurry Wall Work at Main Site
Jan 1, 2006
-
The Quintette ProjectBy W. R. Leeder
"The Quintette coal property lies in the Rocky Mountain foothills of northeastern British Columbia (see Figure 1). Quintette and the adjacent Bullmoose property of Teck Corporation are soon to become
Jan 1, 1983
-
Development of Environmental Management Systems in the Mining IndustryVarious influences determine how an Environmental Management System (EMS) for a mining or petroleum project is developed and administered. These influences include the environmental and resource legis
Jan 1, 1995
-
Life Cycle Assessment of Process Options for Copper ProductionBy Y Zhuang, S La Brooy
The selection of the optimum process route for a new project has traditionally consisted of investigating existing options and ranking them in terms of cost, technical risk and environmental acceptabi
Jan 1, 2002
-
Application Of Ground Penetrating Radar To Evaluate The Extent Of Polyurethane Grout Infiltration For Mine Roof Control - A Case StudyBy William D. Monaghan, Michael A. Trevits
Over the period 2000 to 2003, roof falls have accounted for 4 to 14% of the fatalities in underground mining operations. The National Institute for Occupational Safety and Health (NIOSH) is conductin
-
Crystal Falls Dam Demolition and Protection Techniques Using an Air CurtainBy Alex Chapman, Cam Thomas, Bryan Karney
"During the early summer of 1989, Ontario Hydro removed a concrete portion of the North Channel Dam at Crystal Falls Generating Station by blasting and excavating in marine conditions. Because of the
Jan 1, 1992
-
Bibliography Of Petroleum And Allied Substances 1922 And 1923 - IntroductionBy H. Britton
This bulletin is the seventh in the series of petroleum bibliographies published by the Bureau of Mines, Bulletins 149, 165, 180, 189, 216, and 220 being compilations for the years 1915, 1916, 1917, 1
Jan 1, 1929
-
Arc Exploration from the Hydrothermal Plume PerspectiveBy C E. J de Ronde, I C. Wright
Oceanic subduction-related volcanic frontal arcs extend over 20 000 km within the western Pacific basin and over 21 500 km worldwide, yet they remain largely unexplored with respect to active seafloor
Jan 1, 2002
-
Drilling And Lining Of The Ocean Shafts - Seabrook Power ProjectBy B. J. Dave, Ashok J. Desai, Allen J. Hulshizer
This paper presents various design and construction considerations involved in developing an underwater installation of lined, large diameter shafts not known to have been previously accomplished for
Jan 1, 1976