Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Investigations Of Rock Mass Properties For The Foundation Of A Nuclear Power Plant At Forsmark, SwedenBy Håkan Stille, Kjeld Boye-Møller, Lars Lundström
BACKGROUND Forsmark Power Station is a nuclear power plant under construction at the Baltic abt 120 km north of Stockholm. Investigations on the Site were started in 1969. Areas were reserved for a
Jan 1, 1979
-
Use of Linear Shaped Charge for Cutting Emergency Vent and Drain Openings in a Rail Tank CarBy William H. Snyer, Hank Cox
A high explosive device using Linear Shaped Charge (LSC) (to rapidly cut vent and drain openings in a rail tank car) is described. In the event of damage to a tank car loaded with a pressurized flamma
Jan 1, 1994
-
Improving Fragmentation and Ore Displacement Control at Homestake McLaughlin Mine Lower Lake, CaliforniaBy Roger Lucas, Dale Nies
The McLaughlin Mine is an open-pit disseminated gold mining operation. Homestake Mining Company's approach to solving some of the blasting problems inherent to this type of deposit provide an interest
Jan 1, 1990
-
Peabody Study: Optimizing Cast Blasting Efficiency Using ANFO With LinersBy Stafan Rose, Art Madsen
Four years ago, Peabody’s North Antelope Rochelle Mine (NARM) site started experimenting withANFO and Liners in its Cast Blasting operations. The motivation to use ANFO was based on the following:1. A
Jan 1, 2007
-
Remote Radio Control BlastingBy Scott Gustfason, Richard N. Snyder
What is a safe stand-off distance? Recent mishaps using conventional blasting equipment have seen flyrock as distant as 3,750 feet from the blast area, or close to three-quarters of a mile, therefore,
Jan 1, 1987
-
Knelson Concentrator Aids In Shift From Silver To Gold ProcessingBy Russell Dittrich
The Kinross DeLamar Mine has been operated for more than 17 years producing precious metals doré from ores, principally silver bearing with associated gold coproducts. In late 1995, the Stone Cabin or
Jan 1, 1998
-
A Geotechnical Data Management System for Surface and Underground MinesBy Brant BA, Lewandowski R, Trendle M, Haughton D
There is a vast amount of geotechnical data, which can be obtained during exploration programs at new and existing mine sites. Additional information on the performance of the in-situ rock mass can
Jan 1, 1983
-
Silverton Project Continues On ScheduleBy E. T. Hunter
Surrounded by the 13,000-ft high peaks of the San Juan Mountains in southwestern Colo., the town of Silverton is the site of the extensive development operations initiated 20 months ago by Standard Me
Jan 1, 1961
-
Development of a Biooxidation Leach Process at Asamera Minerals (U.S.) Cannon MineBy Donald C. Moore
Asamera Minerals Cannan Mine has been producing a 170 g gold/tonne (5 oz gold/ton) siliciaus flotation concentrate since July 1985. Flotation concentrate is shipped to a smelter for gold recovery. Num
Jan 1, 1989
-
Design And Operation Of The Circulating Fluid Bed Roaster System For The Syama Gold Deposit ProjectBy S. A. Bunk, W. P. Wood
In the early 1980's BHP identified several potential gold deposits in West Africa. One of these deposits was located in Mali, near the village of Syama. As a result of extensive exploration activitie
Jan 1, 1996
-
Keynote Environmental AddressThe geotechnical and environmental aspects of heap leaching are very closely tied during design, operations and closure. Potential environmental impacts from heap leaching are mostly due to land di
Jan 1, 1994
-
Utilization of Lime Mud Residue from Kraft Pulp Mills as Alkaline Amendment for Oxidized Sulfidic Mine TailingsBy Guohong Yin
Oxidized sulfidic tailings contain significant amounts of accumulated acidity in the form of water-soluble secondary sulfate minerals and thus constitute long-term sources of acid drainage at many met
Nov 1, 2002
-
Behavior Studies For A Highway TunnelBy D. L. Misterek, E. J. Slebir, G. W. Ring, M. A. Laird
INTRODUCTION In 1973, the Federal Highway Administration (FHWA) initiated a 10-year program of research on tunneling technology for future highways as a part of a larger Department of Transportatio
Jan 1, 1976
-
Predicting Tunnel OverbreakBy P. R. Mohanty, Kaushik Dey
Blast-induced tunnel overbreak prediction in the past has been based on peak particle velocity measured far from the blast site with necessary extrapolation. This has often resulted in suggesting high
Jan 1, 2004
-
Technology News - Converting Methane To Utility Energy At Australian Coal MinesEnergy Developments Ltd. (EDL) has developed power plants at two Australian coal mines that featuring 94 gas-fueled Caterpillar G3516 engine/generator sets. They will convert to electricity 145 kt/a (
Jan 1, 1997
-
Economic Benefits Gained by Rock Mechanics – Three Case StudiesBy J. F. T. Agapito
Significant economic benefits can result when rock mechanics is applied within a practical framework and integrated within the other engineering functions of the mine organization. Such application an
Jan 1, 1991
-
High-Sulfidation Submarine Hydrothermal Systems Of The Mariana ArcBy Robert G. Ditchburn
The Mariana arc is an ~1,400-km-long intraoceanic arc that marks the southern extension of the Izu-Bonin arc, and is host to 62 ?volcanic centers? of which at least 27 (21 submarine) are hydrothermall
Jan 1, 2008
-
Environmental Auditing as a Driver for Continuous Improvement in Environmental Performance (ede55e7e-c054-4fc6-ae90-dd762e66d692)Continuous improvement in environmental management assists in the achievement of sustainability goals for the mining and processing of minerals. The use of regular internal environmental audits (score
Jan 1, 2004
-
Applying Image Analysis to Process Control- From Blasting to FlotationThe ever-increasing power (and decreasing cost) of computers has opened up substantial oppor¬tunities for 'Vision'-based systems in both on-line and off-line control. This paper reviews imag
Jan 1, 2000
-
Management of Tailings and Other Wastes for RehabilitationBy Leggate J
In the past many coal mining projects commenced without any consideration being given to eventual site rehabilitation. Now that site rehabilitation is assuming greater importance with changing comm
Jan 1, 1991