Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Application Of An MIP Model To The Optimal Siting And Production Scheduling For A Centralized Coal Preparation PlantBy Raja V. Ramani, Ralph W. Barbaro
This paper presents an application of a Mixed Integer Programming (MIP) model to the problem of locating a centralized coal preparation plant and determining the production schedule for the mines. The
Jan 1, 1983
-
Converting Of Low-Copper High-Sodium MattesBy C. Ek
In bismuth metallurgy, low-copper high-sodium mattes are by-produced. Different charges containing mixtures- of crude mattes, oxidized matte, and/or copper sulfide concentrate and/or copper silicate o
Jan 1, 1983
-
Ferric Chloride Leaching Of Molybdenite Concentrates For Copper Removal At The Anaconda Minerals Company - Nevada Moly OperationsBy Joseph M. Zigich
The Anaconda Minerals Company operates a molybdenite and copper producing mine and mill facility near Tonopah, Nevada. Included with the milling facility is a ferric chloride leach plant for removal o
Jan 1, 1983
-
Design Examples of Open Pit Slopes Susceptible to TopplingBy Alan F. Stewart, Douglas R. Piteau, Dennis C. Martin
Three examples of open pits where toppling failure controls the stability and design of the slopes are described. Two examples involve the design of overall slopes in base metal mines. The third examp
Jan 1, 1983
-
Blasting Practices for Improved Coal Strip Mine Highwall Safety and CostBy Michael F. Dunn, Francis S. Kendorski
The fall of rock from strip coal mine highwalls continues to be the largest single source of fatal accidents, so methods to improve highwall stability through improved blasting practices were investig
Jan 1, 1983
-
OFR-101-84 Development Of A Multiple Unit Continuous Haulage SystemBy GJ Hundman
The Multiple Unit Continuous Haulage (MUCH) System was designed to provide the capacity to continuously convey coal from the mining machine to the main haulage belt. The MUCH System has an operator
Jan 1, 1983
-
OFR-60-85 Correct Shortcomings During Trial Of Shotcrete Lining System And Demonstrate Shotcrete SystemThis report describes the redesign, development and field demonstration of a remote shotcrete lining system, capable of operating in shafts and mines from 8 to 16 feet in diameter at depths up to 1000
Jan 1, 1983
-
OFR-179(1)-84 Guidelines For Open Pit Ore Pass Design - Volume 1 - Final ReportBy D. F. Hambley
This report documents the work carried out by Engineers International, Inc. and its subcontructor, W. G. Pariseau, in order to develop a design manual for ore passes for open pit mines. The work inclu
Jan 1, 1983
-
OFR-39-84 Postmining Results In Coshocton County, Ohio: Research On The Hydrology And Water Quality Of Watersheds Subjected To Surface MiningSurface mining and reclamation of a southeastern Ohio site with sandstone-shale overburden resulted in (as compared to premining levels): 1) runoff volumes and peak rates that increased by a factor of
Jan 1, 1983
-
OFR-37-90 Design, Fabrication, And Testing Of A Bidirectional AugerBy O. Llewellyn Jack
From September 1978 to December 1983, ESD Corporation (formerly a Division of FMC Corporation) undertook the development and testing of a bidirectional auger under contract with the U.S. Department of
Jan 1, 1983
-
OFR-185-84 Ground-Water Monitoring In The Tucson Copper Mining DistrictGround-water and tailings pond monitoring in the Upper Santa Cruz Basin Mines Task Force's Special Studies Area has been performed to determine the nature and extent of aquifer contamination from
Jan 1, 1983
-
OFR-94-84 Methane Control In An Advancing Section Of An Underground Coal MineBy Danny Hagood
The drilling of horizontal boreholes as a means of degasification in advance of mining has been tried at Jim Walter Resources, Inc., No. 4 Mine. In a joint venture with the U.S. Bureau of Mines, a ser
Jan 1, 1983
-
OFR-52(1)-84 Surface Coal Mine Spoil Stability Study Eastern Coal Province - Volume IBy Paul G. Swanson
This investigation was conducted to identify the principle causes of spoil instability problems in the Eastern Coal Province. The study was also conducted to develop a matrix to predict the strength a
Jan 1, 1983
-
OFR-187(1)+(2)-84 Erodibility And Related Soil Properties Of Three Reclaimed Surface Mined SoilsBy Otto Robert Stein
Erodibility of reclaimed surface mine soils is a subject in need of quantification. Effects of soil erosion from reclaimed areas may damage surrounding areas and the quality of water in nearby streams
Jan 1, 1983
-
OFR-151(3)-83 Development Of A Procedure For Land Use Potential Evaluation For Surface-Mined Land - Appendix II: Central U. S. Surface Mine Case StudyBy Raja V. Ramani
The potential usefulness of reclaimed surface-mined land has received much attention recently. In an effort to develop a procedure for evaluating postmining land use potentials, specific mines in vari
Jan 1, 1983
-
OFR-207-84 Accident Cost Indicator Model Reference And User ManualBy Daniel G. Di Canio
Reference information and user instructions for Version 3.0 of the Accident Cost Indicator Model (ACIM) software package are presented. ACIM estimates the tangible costs of occupational injuries, illn
Jan 1, 1983
-
OFR-14-84 Improved Crowd Limit Switches And Greenhorn For Electric ShovelsBy Gary Choate
The work presented in this report represents the background activity which led to the fabrication and testing of a greenhorn and crowd limit switch system for electric shovels. The program began With
Jan 1, 1983
-
Applied Geology: The Foundation For Mine Design At Exxon Minerals Company?s Crandon DepositBy Roger G. Rowe
The Crandon deposit, located in northern Wisconsin, is a 65.8 million ton Precambrian volcanogenic massive sulfide deposit which averages 1.4% copper and 5.8% zinc. The deposit is classic in origin, m
Jan 1, 1983
-
Availability Of Toxic Metals From Non-Ferrous Metallurgical Slags Using Various Testing ProceduresBy D. A. Robbins
The Resource Conservation and Recovery Act. of 1976 (RCRA) requires testing of waste materials as part of the determination of whether these materials are classified and managed as hazardous wastes. T
Jan 1, 1983
-
The Million Dollar Grinding Mill - Is It For You?By Vas P. Srinivasa
A comminution circuit is an important integral part of a mineral processing plant. Nearly 40% of the capital cost and 30 to 40% of the operating cost are taken up by the crushing and grinding circuit.
Jan 1, 1983