Learning from and managing a significant saprolite instabilityBy M Bouare, C Holland, K N’Diaye
Two adjacent open pits in Mali hosted by deeply weathered saprolitic materials were mined consecutively over the course of approximately 12 months. During excavation, both pits experienced significant
Jun 22, 2022
-
Improvement of blast efficiency at Rio Tinto Borates and Lithium Mine in California, USABy J Furtney, W Fu, D Nutakor, A Brose
Rock blasting outcomes are often a shared responsibility of both the mine operations group and the mine geotechnical group. From an operational logistics and planning perspective, blasting concerns in
Jun 22, 2022
-
Quantifying iron ore ‘handleability’ to reduce processing plant delaysBy P Cherepanskiy, G Elphick, R Hus, C Perring
When an iron orebody nears its end of life, the extracted material can become increasingly problematic to handle. Higher moisture content occurs as larger portions of originally-below-water-table mate
Jun 22, 2022
-
Applying control frameworks to enhance vehicle interaction technology outcomesBy P Standish
Qualitative risk assessment methods are not well suited to considering complex systems and potential interactions of new technology. As part of supporting tier one mining organisations and internation
Jun 22, 2022
-
Scaled depth of burial application to increase blast efficiency in PT. Indo Muro KencanaBy A Suwandhi, H Utama
PT. Indo Muro Kencana (PT.IMK) is a gold mine that is located in Central Kalimantan, Indonesia. Drilling and blasting activity is applied in order to support mining production. Drilling and Blasting (
Jun 22, 2022
-
Blast design and execution drives mine site profitsBy J Loeb, J Dampney, P Cameron
Optimisation of Blast Design and Execution must be done right the first time. It is too late after the ore is broken. Consequences of poor design and execution negatively affect productivity from load
Jun 22, 2022
-
Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)By C E. Woolley, H Jebaliya, J Foster
The East wall of the Kalgoorlie Consolidated Gold Mines Fimiston Open Pit (KCGM Superpit) has a history of wall instabilities impacting mining operations; the most significant of which occurred in May
Jun 22, 2022
-
The use of collaboration and management to turn-around the performance of a failing copper mineBy M Jacobs
This abstract discusses a heap leach copper mine that was failing to perform and as a result was not meeting targeted production. The mine had numerous technical challenges including: high water inflo
Jun 22, 2022
-
A tailored solution to determine plant capacity using strategic analysisBy J Nortier, J Dray
There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi
Jun 22, 2022
-
The role of fleet management in reducing carbon emissions from haul trucksBy D Prior
The Australian mining industry is a significant contributor to the nation’s greenhouse gas (GHG) emissions, and like any industry, it must make efforts to reduce these. Medium- and long-term strategie
Jun 22, 2022
-
Transition from owner mining to contract mining – a structured tender process using a holistic approachBy Y G. Anoman
This paper discusses the operating model within Endeavour Mining Corporation regarding the options of owner mining against contract mining. It’s based on the concept of ‘are we carrying out the most e
Jun 22, 2022
-
The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisationBy X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones
Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla
Jun 22, 2022
-
Managing uncertainty in large open pit geotechnical modellingBy R Hao
Uncertainties in large open pit geotechnical modelling has been a major concern for slope stability analysis. The level of confidence in the in-put assumptions, such as structural and rock mass model,
Jun 22, 2022
-
Managing remediation, and risk of failure, to complete extraction of a short life open pitBy C E. Woolley, A Hosseini, J Foster
Northern Star’s Thunderbox Open Pit C-Zone cutback was designed to maximise extraction in a short life excavation; In fresh rock on the western wall this included 20 m to 30 m bench heights with 6.5 m
Jun 22, 2022
-
Should earthquake loading be considered for open pit slope design in Australia?By F Weir, B Estrada
The impact of seismic loading on open pit slope stability in Australia is often only considered where the slopes are located adjacent to tailings facilities or other major infrastructure. The debate r
Jun 22, 2022
-
Social licence to operate – circular economyBy L Schürmann, R Kendall
Social licence to operate is becoming part of a mining company’s DNA in the same way as health and safety. Consequently, mining companies are receiving increasing pressure from their shareholders to e
Jun 22, 2022
-
Slope stability is a critical issue for the open pit mining communityBy M Edgar, G Pattemore, M Auad, K Job, A Job, S Gale
In recent decades, significant advances have improved the modelling techniques for predicting slope failure. Predicting failures is vital in open pit mining due to the significant risk posed to person
Jun 22, 2022
-
Dredger drop impact on slope stability – Hazelwood MineBy J Stipcevich, N Patel, J Faithful5, S Narendranathan, L Tatnell4
ENGIE, the current owner and operator of the Hazelwood Open Cut coalmine, are in the process of rehabilitating the mine site in preparation for mine closure. Bucket wheel excavators (dredgers) used du
Jun 21, 2022
-
Near‑Technical Limit Gold Recovery from a Double Refractory Carlin‑Type Ore After Pre‑treatment by High‑Temperature Pressure OxidationBy DEVY DYSON, Brian Hart, JOHN LANGHANS, Stamen Dimov, STEVE YOPPS
A recent Nevada Gold Mines research program focused on pressure oxidation pre-treatment of a Carlin-type double refractory ore from the Turquoise Ridge Mine. The research team found that both arsenian
Jun 21, 2022
-
Rockmass Permeability Induced by Longwall Mining Under Deep Cover: Potential Gas Inflow from a Sheared Gas WellBy Steven J. Schatzel, Kayode M. Ajayi, Bo H. Kim, Zoheir Khademian, Gabriel S. Esterhuizen
The stability of shale gas wells drilled through current and future coal reserves can be compromised by ground deformations due to nearby longwall mining. Depending on the longwall-induced rockmass pe
Jun 19, 2022