  • AUSIMM
    Learning from and managing a significant saprolite instability

    By M Bouare, C Holland, K N’Diaye

    Two adjacent open pits in Mali hosted by deeply weathered saprolitic materials were mined consecutively over the course of approximately 12 months. During excavation, both pits experienced significant

    Jun 22, 2022

  • AUSIMM
    Improvement of blast efficiency at Rio Tinto Borates and Lithium Mine in California, USA

    By J Furtney, W Fu, D Nutakor, A Brose

    Rock blasting outcomes are often a shared responsibility of both the mine operations group and the mine geotechnical group. From an operational logistics and planning perspective, blasting concerns in

    Jun 22, 2022

  • AUSIMM
    Quantifying iron ore ‘handleability’ to reduce processing plant delays

    By P Cherepanskiy, G Elphick, R Hus, C Perring

    When an iron orebody nears its end of life, the extracted material can become increasingly problematic to handle. Higher moisture content occurs as larger portions of originally-below-water-table mate

    Jun 22, 2022

  • AUSIMM
    Applying control frameworks to enhance vehicle interaction technology outcomes

    By P Standish

    Qualitative risk assessment methods are not well suited to considering complex systems and potential interactions of new technology. As part of supporting tier one mining organisations and internation

    Jun 22, 2022

  • AUSIMM
    Scaled depth of burial application to increase blast efficiency in PT. Indo Muro Kencana

    By A Suwandhi, H Utama

    PT. Indo Muro Kencana (PT.IMK) is a gold mine that is located in Central Kalimantan, Indonesia. Drilling and blasting activity is applied in order to support mining production. Drilling and Blasting (

    Jun 22, 2022

  • AUSIMM
    Blast design and execution drives mine site profits

    By J Loeb, J Dampney, P Cameron

    Optimisation of Blast Design and Execution must be done right the first time. It is too late after the ore is broken. Consequences of poor design and execution negatively affect productivity from load

    Jun 22, 2022

  • AUSIMM
    Mining method, and controls, to cut back a failed slope at KCGMs Fimiston Pit (KCGM Superpit)

    By C E. Woolley, H Jebaliya, J Foster

    The East wall of the Kalgoorlie Consolidated Gold Mines Fimiston Open Pit (KCGM Superpit) has a history of wall instabilities impacting mining operations; the most significant of which occurred in May

    Jun 22, 2022

  • AUSIMM
    The use of collaboration and management to turn-around the performance of a failing copper mine

    By M Jacobs

    This abstract discusses a heap leach copper mine that was failing to perform and as a result was not meeting targeted production. The mine had numerous technical challenges including: high water inflo

    Jun 22, 2022

  • AUSIMM
    A tailored solution to determine plant capacity using strategic analysis

    By J Nortier, J Dray

    There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi

    Jun 22, 2022

  • AUSIMM
    The role of fleet management in reducing carbon emissions from haul trucks

    By D Prior

    The Australian mining industry is a significant contributor to the nation’s greenhouse gas (GHG) emissions, and like any industry, it must make efforts to reduce these. Medium- and long-term strategie

    Jun 22, 2022

  • AUSIMM
    Transition from owner mining to contract mining – a structured tender process using a holistic approach

    By Y G. Anoman

    This paper discusses the operating model within Endeavour Mining Corporation regarding the options of owner mining against contract mining. It’s based on the concept of ‘are we carrying out the most e

    Jun 22, 2022

  • AUSIMM
    The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisation

    By X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones

    Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla

    Jun 22, 2022

  • AUSIMM
    Managing uncertainty in large open pit geotechnical modelling

    By R Hao

    Uncertainties in large open pit geotechnical modelling has been a major concern for slope stability analysis. The level of confidence in the in-put assumptions, such as structural and rock mass model,

    Jun 22, 2022

  • AUSIMM
    Managing remediation, and risk of failure, to complete extraction of a short life open pit

    By C E. Woolley, A Hosseini, J Foster

    Northern Star’s Thunderbox Open Pit C-Zone cutback was designed to maximise extraction in a short life excavation; In fresh rock on the western wall this included 20 m to 30 m bench heights with 6.5 m

    Jun 22, 2022

  • AUSIMM
    Should earthquake loading be considered for open pit slope design in Australia?

    By F Weir, B Estrada

    The impact of seismic loading on open pit slope stability in Australia is often only considered where the slopes are located adjacent to tailings facilities or other major infrastructure. The debate r

    Jun 22, 2022

  • AUSIMM
    Social licence to operate – circular economy

    By L Schürmann, R Kendall

    Social licence to operate is becoming part of a mining company’s DNA in the same way as health and safety. Consequently, mining companies are receiving increasing pressure from their shareholders to e

    Jun 22, 2022

  • AUSIMM
    Slope stability is a critical issue for the open pit mining community

    By M Edgar, G Pattemore, M Auad, K Job, A Job, S Gale

    In recent decades, significant advances have improved the modelling techniques for predicting slope failure. Predicting failures is vital in open pit mining due to the significant risk posed to person

    Jun 22, 2022

  • AUSIMM
    Dredger drop impact on slope stability – Hazelwood Mine

    By J Stipcevich, N Patel, J Faithful5, S Narendranathan, L Tatnell4

    ENGIE, the current owner and operator of the Hazelwood Open Cut coalmine, are in the process of rehabilitating the mine site in preparation for mine closure. Bucket wheel excavators (dredgers) used du

    Jun 21, 2022

  • SME
    Near‑Technical Limit Gold Recovery from a Double Refractory Carlin‑Type Ore After Pre‑treatment by High‑Temperature Pressure Oxidation

    By DEVY DYSON, Brian Hart, JOHN LANGHANS, Stamen Dimov, STEVE YOPPS

    A recent Nevada Gold Mines research program focused on pressure oxidation pre-treatment of a Carlin-type double refractory ore from the Turquoise Ridge Mine. The research team found that both arsenian

    Jun 21, 2022

  • SME
    Rockmass Permeability Induced by Longwall Mining Under Deep Cover: Potential Gas Inflow from a Sheared Gas Well

    By Steven J. Schatzel, Kayode M. Ajayi, Bo H. Kim, Zoheir Khademian, Gabriel S. Esterhuizen

    The stability of shale gas wells drilled through current and future coal reserves can be compromised by ground deformations due to nearby longwall mining. Depending on the longwall-induced rockmass pe

    Jun 19, 2022