    Dewatering for the Lenox Avenue Subway Reconstruction Project

    By Paul C. Schmall, Thomas Tuozzolo, Arthur B. Corwin

    The Lenox Avenue Reconstruction Project involved the excavation and replacement of 750 m (2,500 ft) of deteriorated subway invert concrete, 5 to 7 m (15 to20 ft) below water table in very permeable gr

    Jan 1, 2001

  • AUSIMM
    Low-Temperature Roasting of Ilmenite ù Phase Chemistry and Applications

    By C Li

    Removal of gangue minerals from ilmenite concentrates can be accomplished by relatively low temperature roasting in controlled gas atmospheres to selectively enhance the magnetic separation characteri

    Jan 1, 2001

  • SME
    Tunnel Construction in Difficult Site Condition for the Longest Highway Tunnel in Himalayan Ranges—India

    By Alok Garg, Rajeev Kumar Dayal

    The Himalayan ranges have complex geological formation induced with locked up tectonic stresses and squeezing ground conditions. High overburden, steep slopes, perennial snow, and forest cover restric

    Jan 1, 2001

  • TMS
    Outokumpu Flash Smelting

    By W. G. Davenport

    Chapter 1 showed that flash smelting is a key step in extracting copper from sulfide ores. It also showed that there , are two versions of flash smelting: (a) Outokumpu flash smelting, which uses ox

    Jan 1, 2001

  • TMS
    Micro-Macro Modeling of Solidification Processes and Phenomena

    By Vaughan R. Voller

    "The wide range of length and time scales found in solidification processes are outlined and discussed. Methods for Direct Microstructure Simulation (DMS) are introduced. Key features in sharp interfa

    Jan 1, 2001

  • CIM
    Thiosulfate Leaching as an Alternative to Cyanidation: A Review of the Latest Developments

    By Mark Aylmore, Guy Deschenes

    "Increasing pressure are motivating the gold mining industry to develop a substitute to cyanide for leaching gold. This effort in mainly based on the high toxicity of cyanide and on the lack of effici

    Jan 1, 2001

  • SME
    A Tunnel Boring Machine at the South Pole

    By Michael R. Walsh, John H. Wright, Eivind B. Jensen

    A tunnel boring machine (TBM) was designed and built at the Cold Regions Research and Engineering Laboratory in 1992 for use in Antarctica. The TBM system was tested at the South Pole where a 120-m lo

    Jan 1, 2001

  • CIM
    Converting the Key Lake Mill Process for McArthur River Ore

    "The Key Lake mill was commissioned in 1983 to process the two Key Lake ore deposits. With the depletion of these ore bodies in 1999, the plant was converted to mill the exceptionally rich McArthur Ri

    Jan 1, 2001

  • CIM
    Encapsulation of Mercury in Gossan Tailings Murray Brook Mine, New Brunswick, Canada

    By Robert Harris, Peter Pheeney

    "The Murray Brook gold mine operated from September 1989 to March 1991. Approximately 1.2 million tonnes of gossan were mined from an open pit and treated at a rate of 900 tonnes per day. The facility

    Jan 1, 2001

  • ISEE
    Gravois Bluffs: Review of a Successful Large-Scale Blast-Monitoring program.

    By David Weidner

    Public relations, regulatory compliance, determination and implementation of pre-blast inspections, and accurate blast monitoring data are all essential components when conducting blasting operations

    Jan 1, 2001

  • SME
    Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel Project

    By Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal

    Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som

    Jan 1, 2001

  • CIM
    Evaluation and Control of Self-Heating in Sulphide Concentrates (2a4e2f85-66d7-4fa2-be4e-37d3482156e2)

    By J. Nesset, F. Rosenblum, P. Spira

    "Sulphide concentrates may exhibit self-heating to various degrees during storage or shipping, the worst cases presenting a serious hazard from fire and SO2 emission. Based on measurements of heating

    Jan 1, 2001

  • AUSIMM
    Structure Response of a Brick Veneer House to Open Pit Coal Mine Blasting

    By A B. Richards

    A brick veneer house located on a open-pit coal mine lease has been subject to ground vibration levels of up to 222 mm/s, and air vibration levels of up to 145 dBL. The dynamic response of the structu

    Jan 1, 2001

  • CIM
    Reducing Mercury Production at Bald Mountain Gold Mine

    By Jim Wickens, Vince Lofftus, Mark Kravetz

    "This paper discusses how Bald Mountain Gold Mine (Ely, NV) dramatically reduced mercury production by treating process solutions with a liquid reagent based on organic sulfide chemistry. Cherokee Che

    Jan 1, 2001

  • SME
    Construction of a Low Rock Cover Cavern for the Neutrinos at Main Injector Facility

    By Bhaskar B. Thapa, Christopher Laughton, Michael P. Bruen

    At Fermilab, located in Batavia, Illinois, a 4,000-foot underground complex of tunnels and caverns is being excavated on a decline of six percent, at depths of up to350 ft, below grade. The site geolo

    Jan 1, 2001

  • AUSIMM
    Estimation of Flyrock Travel Distances: A Probabilistic Approach

    By M F. L Gibson

    The issue of flyrock is very important in the operation of all mineral extraction sites that use blasting. Unlike the other environmental effects of blasting, ground vibrations and air overpressure, f

    Jan 1, 2001

  • SME
    Dewatering Solutions to Groundwater Control and Environmental Problems — Sheppard Subway Expansion — Toronto, Ontario, Canada

    By Andy Ingriselli, Andrew Famiglietti, John Westland, Greg Landry

    Atlas Dewatering was contracted to install and maintain a groundwater control system for the new Bessarion Subway Station and the Tail Track Structure on the Toronto Transit Commission’s new Sheppard

    Jan 1, 2001

  • AUSIMM
    Blast Design Using Measurement While Drilling Parameters

    By M Higgins

    Measurement while drilling (MWD) techniques can provide a useful tool to aid drill and blast engineers in open cut mining. By avoiding time consuming tasks such as scan-lines and rock sample collectio

    Jan 1, 2001

  • AUSIMM
    Staurolite Product Development

    By S Benson

    Staurolite is one of the major contaminant minerals contained in the Tiwest Cooljarloo orebodies. Approximately 80 per cent of staurolite in mined ore, reports to the heavy mineral concentrate that is

    Jan 1, 2001

  • SME
    St. Louis Skinker–McCausland Tunnel

    By Jozef F. Zurawski

    River Des Peres Foul water Interceptor (Skinker–McCausland Tunnel) is a gravity sewer tunnel constructed to eliminate dry sewage overflows during high river stages and to improve the wastewater collec