Search Documents

Sort by

  • TMS
    Removal Of Boron From Metallurgical-Grade Silicon By Applying CaO-Based Flux Treatment (69991582-ff84-4636-8187-0088ee11f2a6)

    By Mitsuru Tanahashi

    In order to develop an effective process for the production of from metallurgical-grade one (MG-Si), the oxidation removal of boron from molten MG-Si was investigated at a solar-grade silicon (SOG-Si)

    Jan 1, 2003

  • AUSIMM
    Methodology for Calculating the Closure Water Balance for an Acid Generating Tailings Impoundment

    By G W. Wilson

    Rehabilitation of tailings impoundments is one of the most challenging aspects in mine closure, as not only does the potential for producing leachate pose a challenge to the rehabilitation designer, b

    Jan 1, 2003

  • TMS
    Thermal Plasma Treatment Of Metal And Material Wastes (Keynote)

    By Patrick R. Taylor

    In the search for the development of more "environmentally friendly" and more intensive waste disposal approaches to meet more and more stringent environmental regulations, thermal plasma-based proces

    Jan 1, 2003

  • TMS
    Effect Of P2O5 Or Na2O Addition On The Reaction Rate Of C02 Dissociation With FexO Containing Molten Oxides

    By Hiroyuki Matsuura

    The effects of P2OS or Na2O addition on the reaction rate of CO2 dissociation on the surface of FexO-base molten oxides was investigated at I 773K by isotope exchange method 1-6. The rate constant dec

    Jan 1, 2003

  • TMS
    An Investigation On The High-Mg-Content Slag In Jinchuan Nickel Flash Smelting Furnace

    By Wang Zhi

    High-Mg-content concentrates are usually treated in Jinchuan flash smelting Furnace. Because the viscosities of high-Mg-content slag is very high, the operation of flash smelting becomes very difficul

    Jan 1, 2003

  • SME
    Problems And Options In Relation To Abandoned Mine Sites (Asturias, Spain)

    By J. Loredo

    Asturias, in Northwestern Spain, has an extensive mining history. As a result of these historical mine activities where operations have been usually developed with little control on effluents or emiss

    Jan 1, 2003

  • SAIMM
    The REP experiment at the Bure underground research laboratory: objectives, programme and design

    By A. Thoraval, K. B. Slimane, O. Ozanam

    The REP experiment is part of the research programme conducted by Andra to investigate the possibility of reversible radwaste disposal in a Jurassic (Callovo-Oxfordian) argillite formation at the Meus

    Jan 1, 2003

  • AUSIMM
    Technical Feasibility Studies and Uses of Treated Acid Mine Drainage at Kingsmill Tunnel, Peru

    By J Chßvez, J Rosa del Castillo, J Rui

    Environmental Impact Assessment (EIA) and Feasibility Studies (FS) were carried out to evaluate the potential use of treated acid mine drainage (AMD) occurring at the Kingsmill Tunnel in the Central A

    Jan 1, 2003

  • DFI
    Quality Control Of Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Piles ? Introduction

    By Rudolph P. Frizzi

    Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is

    Jan 1, 2003

  • AUSIMM
    Regulatory Perspective ù Development of Closure Plan With Adequate Financial Assurance for the Protection of Ground Water Quality at the Chino Copper Mine

    By K Myers

    Since the mid-1990s, the Chino Mine Facility (Chino) located near Silver City, New Mexico has been developing a closure plan with financial assurance to protect water quality, as required by State reg

    Jan 1, 2003

  • AUSIMM
    High-Resolution Pit Water Quality Model for the Highway Reward Mine, Queensland, Australia

    By B G. Lottermoser

    Field and laboratory data combined with computational modelling have been used to predict the pit water quality for the Highway Reward mine. Open pit mining of the Highway Reward copper-gold deposit h

    Jan 1, 2003

  • SAIMM
    Finance accounting and cost control for long-term construction contracts supported by the integrated management and information system Aristoteles

    By K. Böde

    Hochtief AG Germany has developed a comprehensive management and information system for the construction industry named Aristoteles. This system is an efficient supporting tool to manage a variety of

    Jan 1, 2003

  • DFI
    Cut-Off Walls For Diamond Mining In The Arctic

    By Wolfgang G. Brunner

    A 3800 m long temporary water-retaining dike has been constructed under extreme conditions in the harsh northern climate to enable two of the kimberiite pipes at the Diavik Diamond Project reserve to

    Jan 1, 2003

  • SAIMM
    On the surface noxious gas emissions from old iron mines

    By D. Grabowski, Z. Pokryszka

    A study carried out in the iron basin of Lorraine (North-East of France) highlighted the existence of under-oxygenated and noxious gas emissions (carbon dioxide, radon…) in vast built-up areas related

    Jan 1, 2003

  • AUSIMM
    The Floatability Characterisation Test Rig as a Pilot Plant for Flotation Testing ù An OperatorÆs Viewpoint

    By J-P Franzidis, M Esvelt, E V. Manla

    The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant that is able to treat up to 2 tph solids. It consists of a bank of six 130 L WEMCO« Smart

    Jan 1, 2003

  • TMS
    Separation Of Copper And Arsenic From Acidic Electrolytes By Electrodialysis

    By Juan Patricio Ibáñez

    Separation of arsenic and copper from Cu-As-H2S04 electrolytes by electrodialysis has been investigated at room temperature. The effects of current density and pH were studied. An arsenic-free copper

    Jan 1, 2003

  • SME-ICGCM
    Using Site Case Histories Of Multiple Seam Coal Mining To Advance Mine Design (a1a824d0-6082-498c-977a-2f43506db9fe)

    By John Ellenberger

    The nature of competition in the coal market tends to deplete the most favorable coal reserves first, and forces subsequent development of mines in more extreme ground conditions such as those associa

    Jan 1, 2003

  • SAIMM
    Hydraulic mining of an in situ heavy mineral ore reserve

    By M. Berger

    The ‘Metallurgical Operations’ Department of Grinaker-LTA Process Engineering (GLTA) currently undertakes then primary mining as well as the re-deposition of tailings forTicor South Africa (Ticor) at

    Jan 1, 2003

  • SME
    Long-Term Performance Of Passive Acid Mine Drainage Treatment Systems

    By P. F. Ziemkiewicz

    This project evaluated the performance of nine passive treatment methods by studying 137 treatment units in eight eastern states. Performance was normalized according to construction cost, projected s

    Jan 1, 2003

  • AUSIMM
    The Nature and Implications of Resuspension in Subaqueous Sulfide Tailings

    By M H. Mian

    Much has been published on resuspension of sediments in lakes and estuaries. In general, resuspension has implications on transport and release of contaminants from the sediments. It has been shown th

    Jan 1, 2003