Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Bolt Load Changes During Initial Face Advance And Cross-Cut BreakthroughBy Steve Signer
The San Juan Mine and the National Institute for Occupational Safety and Health conducted a study to measure how development mining effected bolt loads. Twelve fully grouted, instrumented roof bolts w
Jan 1, 2004
-
Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery RoomsBy T. M. Barczak, S. C. Tadolini
Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery en
Jan 1, 2004
-
Application Of Ground Penetrating Radar To Evaluate The Extent Of Polyurethane Grout Infiltration For Mine Roof Control - A Case StudyBy William Monaghan
Over the period 2000 to 2003, roof falls have accounted for 4 to 14% of the fatalities in underground mining operations. The National Institute for Occupational Safety and Health (NIOSH) is conducting
Jan 1, 2004
-
Deep shaft hoisting at LaRonde —The Penna shaft hoisting plantBy B. McLaughlin
Agnico-Eagle started sinking the Penna Shaft in 1995 with a hoisting plant capable of hoisting 1800 t/d from a 2240 m deep shaft. Exploration success led to the installation of a hoisting plant capabl
Jan 1, 2004
-
Treatment Of Transition Metal Oxide Wastes By Plasma Driven ElectrolysisBy Patrick R. Taylor
Keywords: Thermal Plasma, Electroreduction, Electrolysis, Transition metals, Waste treatment, Molten oxides, Chromium oxide. An innovative process to treat transition metal oxide waste materials f
Jan 1, 2004
-
30 Hudson Street Foundation Design and Construction in Variable RockBy Joel Moskowitz, George J. Tamaro
"A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140m by 100m, will include 4 basements under the entire footprint. The perimeter was to be s
Jan 1, 2004
-
Environmental planning in mine waste management — The Huckleberry Mines experience (CIM BULLETIN)By H. F. Letient, D. C. Johnson
At the 25th Annual B.C. Mine Reclamation Symposium in September 2001, Huckleberry Mines Limited received the Jake MacDonald Reclamation Award for its exemplary mine waste management plan, conceived to
Jan 1, 2004
-
Drilled Shaft Inspector's Manual - 1.0 General - 1.1 Scope And LimitationsThe intent of this manual is to provide guidelines for inspectors of drilled shaft construction otherwise referred to as drilled piers, caissons or bored piles. It should also be helpful to train begi
Jan 1, 2004
-
Safety Talk - Misfires: Don't Overlook the Safety if FlaggersBy Larry Schneider
In the construction field and to a lesser degree in mining, flagman are often necessary to move traffic and or pedestrians through work zones. Everyone readily recognizes that they are essential for t
Jan 1, 2004
-
MSHA'S Role in Mine Safety and HealthGood Morning. Thank you for your kind welcome, Lyle and thank you for having me here today. I spoke at the fall meeting of the Utah state RMCMI in Price and it's nice to be invited back. I can se
Jan 1, 2004
-
Murphy's Law And The Pile Prediction Event At The 2002 ASCE GeoInstitute's Deep Foundations ConferenceBy Bengt H. Fetlenius
The "Pile Prediction Event" at the ASCE GeoInstitute's Deep Foundation Conference in February 2002 involved prediction of drivability and capacity of three 14m long, 324mm diameter, closed-toe pi
Jan 1, 2004
-
2000 Blasting in the New Millennium Won't You Be My Neighbor?By Ann Barron, Mark Abernethy
Regardless of the care exercised by a blaster, seismic and acoustic effects produced by blasting can be disruptive and alarming to many people. With the general trend toward larger blasts, increased p
Jan 1, 2004
-
An Insight into the Direction of Environmental Management in New Zealand's Coal IndustryBy T Clemens, D Trumm
Adopting environmentally acceptable practices in New Zealand is a crucial requirement for mineral wealth development. Recent planned expansions in the coal industry have increasingly placed mining in
Jan 1, 2004
-
Safety Talk - Training If It's Worth The Time, It's Worht DocumentingBy Ann Barron, Paul Downing
Those employed in the explosives industry must have a keen familiarity of the explosives products they handle, the safety pro c e d u res they must follow, and the increasing number of laws and regula
Jan 1, 2004
-
Development of a Fluid Bed Pyrohydrolysis Process for Inco's Goro Nickel ProjectBy A. Vahed
The Goro Nickel Project is situated in the Southern Province of New Caledonia. Inco Limited and Goro Nickel S.A. have developed a process that features the use of pyrohydrolysis to produce nickel oxid
Jan 1, 2004
-
Sustainable Development Keys - SME Annual Meeting 2022By Steve Kral
The concept of sustainable development is not new to the mining industry. Many people involved with mining have argued that the industry throughout the world has always supported the communities wher
Jan 1, 2004
-
Quality Assurance Programs for Fabrication of Specialised Vessels and Exotic Alloy PipingBy M. Pearson, W. Bristowe, A. Hanson
"There's no such thing as quality assurance; only quality control ... by inspection. "(1) A common misunderstanding in the procurement and construction of custom designed, fabricated pressure ves
Jan 1, 2004
-
High Temperature PDX of Precious/Base Metal Concentrates from Newmont's Phoenix Project, Using Controlled Precipitation of Sulphate Species to Enhance Silver RecoveryBy J. C. Gathje
Newmont acquired the Phoenix Project through the acquisition of Battle Mountain Gold in 2000. Shortly after the acquisition, Newmont Metallurgical Services (NMS) and Nevada Operations began developmen
Jan 1, 2004
-
Nanostructured Gold and Alloys for Fuel Cell CatalysisBy Chuan-Jian Zhong
Gold-based nanoparticles in the size range of a few nm have attracted increasing interests in catalysis, sensors and biomedical applications. The study of the unique catalytic properties of nanosized
Oct 1, 2003
-
Au L3-edge XANES Analyses for spr-Au/Al2O3 CatalystBy S. Nagamatsu
Alumina supported gold catalyst prepared by spray reaction method (spr) provides gold particle with about 20 nm of diameter. The gold particle size is larger than conventional gold catalysts. However,
Oct 1, 2003