Search Documents

Sort by

  • SME
    Cost Trends — Environmental Management Of Mine Operations

    By T. M. Dyhr, T. E. Wilson

    Although environmental management costs during mine operation depend on the size, type, climatic and geochemical conditions of operation, general cost categories are identified and mean values, as a p

    Jan 1, 2004

  • CIM
    Use of Oxyfuel Based In-Plant Recycling Of Dust and Sludge

    By Joachim von Scheele

    An oxyfuel-based technology - OXYFINES - has been introduced for in-plant recycling. It provides fines, dust, sludge (without any drying-step) and other by-products arising in the steel and metal prod

    Jan 1, 2004

  • SME
    Sustainable Development And Mine Closure Planning, A Case Study, Golden Sunlight Mine, Jefferson County Montana

    By S. Mendenhall

    The Golden Sunlight Mine (GSM) began operation in 1982 with a strong commitment to environmental stewardship and the local community. This commitment ensured the long-term physical, chemical and ecolo

    Jan 1, 2004

  • ISEE
    Predicting Tunnel Overbreak

    By P. R. Mohanty, Kaushik Dey

    Blast-induced tunnel overbreak prediction in the past has been based on peak particle velocity measured far from the blast site with necessary extrapolation. This has often resulted in suggesting high

    Jan 1, 2004

  • CIM
    The Development of Ultrafine Grained Steels through Thermomechanical Processing

    By P. D. Hodgson, G. L. Kelly, H. Beladi

    "The formation of ultrafine ferrite by strain induced transformation is assessed using rolling and hot torsion experiments. These experiments are used to examine the impact of thermomechanical process

    Jan 1, 2004

  • CIM
    Testing and Modelling a Novel Iron Control Concept in a Two-Stage Ferric Leach/Pressure Oxidation Process for the Sepon Copper Project

    By K. G. Baxter, D. G. Dixon

    The Sepon process plant utilises an autoclave to oxidize a flotation concentrate containing pyrite, residual copper minerals, and sulphur. The concentrate is produced from the residue of a preceding a

    Jan 1, 2004

  • ISEE
    A New Digital Centralized Blasting System

    By Peter Reinders, Dirk Hummel

    This paper describes a new digital Centralized Blasting System (CBS), which is currently being introduced into underground applications. The CBS makes use of the field-proven detonator and equipment t

    Jan 1, 2004

  • SME
    Mining Company Performance Improvement Programs and Results-Summary of Benchmarking Study

    By Peter Fordham

    A Norbridge review of 25 top mining companies highlighted financial problems for many firms. To better understand these results, Norbridge benchmarked 17 mining companies to understand the problems th

    Jan 1, 2004

  • CIM
    Improving Sulphide Recoveries in Complex Gold Ore Bodies Using Cost Effective Pre-Concentration by Gravity

    By Yaw Boadi, Andrew McCallum, Sandy Gray, Yavuz Atasoy, Peter Wemyss

    "Various full-scale test programs and installations of the InLine Pressure Jig (IPJ) have provided evidence that pre-concentration of the difficult to leach sulphide mineral through gravity can provid

    Jan 1, 2004

  • CIM
    Potential Use of Treated Acid Mine Drainage at Kingsmill Tunnel, Peru -Technical and Economic Feasibility Studies

    By J. R. del Castillo, J. Ruiz, N. Kuyucak, J. Chavez

    Environmental Impact Assessment (EIA) and Feasibility Studies (FS) were carried out to evaluate the potential use of treated acid mine drainage (AMD) occurring at the Kingsmill Tunnel in the Central A

    Jan 1, 2004

  • AUSIMM
    Value in Use ù Developing an Improvement Program for Success

    By M Gill, A Mathias

    The mining industry has always been cost-focussed but in recent times mining companies have moved towards obtaining a competitive advantage through the implementation and sustainability of best practi

    Jan 1, 2004

  • CIM
    Geology of the Izok Massive Sulfide Deposit, Nunavut Territory, Canada

    By Ian R. Morrison

    "Abstract - The Izok Zn-Cu-Pb-Ag volcanogenic massive sulfide deposit is located 265 km south of Kugluktuk (Coppermine), Nunavut Territory, Canada, in the west-central Slave structural province. The I

    Jan 1, 2004

  • TMS
    Niquel do Vermhelo Project - Prefeasibility Study

    By Vanessa M. Torres

    Cia. Vale do Rio Doce is currently developing Niquel do Vermelho Project. The laterite deposit is located at Carajas Mineral Province at less than 15 km from Sossego Copper Project, scheduled for star

    Jan 1, 2004

  • NIOSH
    Coal Contractor Mining Facts - 2002

    1. In 2002, a total of 2,820 contracting companies reported employment at coal mines to MSHA.

    Jan 1, 2004

  • ISEE
    Anfo Truck Burn Trials

    By E. Contestabile, B. von Rosen

    Recently, the Canadian Explosives Research Laboratory (CERL) completed its investigation of a truck accident, which involved 18,000 kg of commercial explosives, 13,000 kg of which was ANFO. Over the t

    Jan 1, 2004

  • AUSIMM
    Whole-of-System Analysis Using CFD to Reduce Emissions of Fugitives Gases Inside a Copper Smelter Building

    By E Nik, A Manzoori, H Namavari, P Witt

    The smelter building at Sarcheshmeh Copper Complex, Iran, houses two reverberatory furnaces and five Pierce-Smith converters. Under normal operating conditions SO2 emissions fill the building, posing

    Jan 1, 2004

  • SAIMM
    New Trends In Submerged Arc Furnace Technology

    By J. Kunze, R. Degal

    During the last 100 years, the submerged arc furnace has been one of the most amazing diversified melting units. These furnaces have found their application in more than 20 different main industrial a

    Jan 1, 2004

  • AUSIMM
    Blast Fragmentation Modelling for a Green Field Open Cut Gold Deposit

    By G Chitombo, G Lewis

    The knowledge of the expected run of mine (ROM) fragmentation during the feasibility study of a green field site is essential for the design of downstream crushing and milling processes. However,the p

    Jan 1, 2004

  • CIM
    Ultra-Fine Grained High Carbon Steel by Innovative Deformation

    By A. W. F. Smith, P. B. Prangnell, D. N. Crowther, P. J. Apps

    It is well known that the refinement of grain size in metals leads to a significant improvement in important mechanical properties. As part of a European collaborative project, processing schedules ha

    Jan 1, 2004

  • SME
    Sustainability: More Than Just Reclamation

    By D. Wright, J. Samborski

    DuPont’s Florida Plant has been mining in northeast Florida and supplying titanium-bearing minerals, zircon and staurolite for over 50years.The site has successfully implemented and “sustained” a land

    Jan 1, 2004