Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Copper Roast Segregation Process: A Promise to be Fulfilled and a Challenge for Material Handling TechnologyBy A. del Campo A.
The roast segregation process, which was patented in 1974, makes use of a set of chemical reactions that are different from the traditional sequential oxidation of iron and copper sulfides used by all
Jan 1, 2007
-
Design Of Drilled Pier In Expansive SoilsBy G. T. Hong
A numerical model for use in design is developed to predict the stresses and axial and bending displacements in a drilled pier in expansive soils. The prediction is based on the horizontal swelling p
Jan 1, 2007
-
New Technologies for Measurement of Operator Fatigue Helping to Deliver Improved Operator Health, Safety and Performance at the Mt Keith OperationsThe Mt Keith Mining Alliance operates a fleet of large capacity hydraulic face shovels and more than 40 X 240 t capacity haul trucks to deliver annual production in excess of 40 Mbcm per annum. The Mt
Jan 1, 2007
-
Evaluation of Large Tunnels in Poor Ground—Alternative Tunnel Concepts for the Transbay Downtown Rail Extension ProjectBy David Hopkins, Steve Klein, Bradford Townsend, Ed Sum, Derek Penrice
INTRODUCTION The Transbay-Caltrain Downtown Extension (DTX) Project involves the construction of an approximately 1.5-mile rail line that will extend Caltrain commuter service and the future Calif
Jan 1, 2007
-
Nailed It! The Great Wall of the Chinese Embassy (dbde4e01-35b2-40e7-b641-e07610069e96)By Fred Tarquinio, Giovanni Bonita, Lars Wagner
"A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large
Jan 1, 2007
-
Design And Construction Of The Sutong Bridge FoundationsBy Robert B. Bittner
The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo
Jan 1, 2007
-
A Case Study Examination of Two Blast Rounds at a Nevada Gold MineBy Ed Mchugh
NIOSH researchers collected basic data from two blast rounds at the SSX-Steer Mine as a component of a larger study on controlled blasting, the goal of which is to reduce injuries from falling rocks i
Jan 1, 2007
-
Fingerprint Verification For Control Of Electronic Blast InitiationBy Ron Stewart, Richard Youmaran, Andy Adler
In the current context of heightened concerns with explosives security, there is significant interest in technological controls to improve security. It is important to be able to control what is fired
Jan 1, 2007
-
An Unusual Accident Re-createdBy James Stuart
A man died when the primed charge he was holding against his chest exploded. He was doing legitimate explosive work, and he was following all the safety procedures he had been taught. He and his colle
Jan 1, 2007
-
Modeling An Artificial Screen For Reducing Seismic VibrationBy Lazar Kricak, Vladislav Kecojevic, Dragan Bogunovic
In spite of many advantages explosives have, their usage may cause environmental problem such as seismic vibration. One of the solutions to this particular problem may be application of an artificial
Jan 1, 2007
-
Risk-based Explosives Safety Assessment In Switzerland And EuropeBy Andreas Bienz
The safety of persons from accidental explosions and fires during manufacture, storage, transport etc. of explosives, pyrotechnics, propellants, firework and ammunition is most commonly assessed accor
Jan 1, 2007
-
Factors Driving Continuous Blasting Improvement At The Lafarge Ravena PlantBy David Lilly, Robert Ethier, David Bremer
The Lafarge Ravena Cement Plant in Ravena, New York demonstrated continuous and extraordinary improvement in productivity during the past several years. The factors driving continuous improvement at t
Jan 1, 2007
-
The Eco mining Platform Accomplishment For The Promotion Of Romanian Research And Innovation PotentialBy Gy. Deák Deák
The ECOMINING platform aims to develop a scientific and technical organization in order to promote within the natural resources industry a framework for environment-friendly exploitation technologies
Jan 1, 2007
-
Design considerations for mine waste management at the Meadowbank Gold ProjectBy C. J. Clayton, A. J. Haynes, D. A. Hickson, B. Thiele
The Meadowbank Gold Project, formerly owned by Cumberland Resources Ltd. and currently owned by Agnico Mines Ltd., is currently being developed approximately 70 km north of Baker Lake, Nunavut, in the
Jan 1, 2007
-
Engineering Foundation Support For Las Vegas Strip's Tallest Hotel CasinoBy Nicholas P. Gura
This paper presents the analysis, design, and load test program results for drilled shafts to support a 70-story hotel tower and associated 10 story podium structures located in Las Vegas, Nevada. A
Jan 1, 2007
-
The Implementation of Snowden's Reconciliation Software - A Case Study from TelferBy J Gotte, C Morley, J Froud
Newcrest Mining LimitedÆs Telfer Mine is a world-class gold and copper producer, situated in the Great Sandy Desert, in the north west of Western Australia. The mine has a number of distinctive charac
Jan 1, 2007
-
Integrity Monitoring Of Xstrata Copper's Kidd Metallurgical Division Mitsubishi 3-Line Furnaces Using Multivariate MethodsBy P. Nelson
Extending the campaign life of the Mitsubishi furnaces at Xstrata Copper's Kidd Metallurgical Division Copper Smelter has been a major focus of attention for many years. One aspect of this effort
Jan 1, 2007
-
Improved Flotation Process Control at Newcrest's Telfer OperationBy S Hille, J Karageorgos
With the increased variability of todayÆs large-scale mining operations, consistent flotation performance is important to improving and sustaining overall recovery through the circuit. The Newcrest Te
Jan 1, 2007
-
Drill Monitoring & Navigation Systmes at BHP Billiton's Navajo MineBy John Vynne
BHP’s Navajo coal mine installed drill monitoring and high precision navigation systems on their three overburden drills during 2002 and 2003. Details of the DrillNav system hardware and reporting sys
Jan 1, 2007
-
The Office Of Surface Mining's - Reclaim The Future!? InitiativeBy S. Rideout
The United States Department of the Interior's Office of Surface Mining (OSM) is responsible for regulating active coal mining and reclaiming abandoned coal mines in the United States. In working
Jan 1, 2007