Search Documents

Sort by

  • SME
    Water is Key Issue at Elko Roundtable 2007

    By Rick Frechette, Bryan Ulrich

    Representatives from several mining operations in three western states left their mines behind for a day in February to discuss with their peers the issue of water. The event was Knight Piésold a

    Jan 1, 2007

  • AUSIMM
    Low Density Explosives - A Product that Requires Some Rule Changes

    The basic make-up of the majority of currently produced bulk explosives has changed little in the last 20 years. These explosives would be described as mature in a life cycle analysis. Therefore these

    Jan 1, 2007

  • CIM
    Mechanical properties and fatigue resistance of rails welded with the aluminothermic method

    By J. P. Sancho, J. M. Duart, J. I. Verdeja, J. O. García

    Following a short review of the history of rails used in the transport of passengers and goods, this paper describes the process for rail fabrication, rail structure, and properties, and summarizes th

    Jan 1, 2007

  • AUSIMM
    Can Mine to Mill Optimisation Succeed Under Complex Constraints?

    By D Thornton, B Smith, S Demey

    Mine to Mill (MTM) optimisation, a total systems approach to the reduction of energy and cost in mining and mineral processing operations, is well-established technology. However, successful applicati

    Jan 1, 2007

  • DFI
    Experiences From A Large Scale Driven Precast Piling Project In India

    By Rajesh A. Vaidya

    A large scale piling work is undertaken in India for an important fast track industrial project. Thousands of solid square precast concrete piles are driven to depths of around 50m. Soils encountere

    Jan 1, 2007

  • CIM
    Mining engineering education in developing countries: The case of Iran

    By H. Memarian

    In the last few decades, many developing countries have tried to expand and improve upon higher education, which is acknowledged to be the leading factor for development. In this respect, develiping c

    Jan 1, 2007

  • DFI
    Ground Improvement Resulting From Installation Of Drilled Displacement Piles

    By Timothy C. Siegel

    Drilled displacement piles (also known as augered cast-in-place displacement piles or augured, pressure grouted displacement piles) are installed by the displacement of soil and subsequent placement o

    Jan 1, 2007

  • AUSIMM
    Computer Simulation of Vibrating Screen in a Dry Classification Circuit Case Study - Gol-e-Gohar Iron Ore Processing Plant

    By A Mehrani, F Zamani, A Dehghani

    Vibrating screens play an important role in the dry classification circuit of Gol-e-Gohar iron ore processing plant. This circuit was designed to classify the autogenous mill discharge and produce a s

    Jan 1, 2007

  • AUSIMM
    BHP Billiton Iron Ore Car Dumper 4 - Temporary Works

    By D Ford

    BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow

    Jan 1, 2007

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007

  • NIOSH
    Portable XRF analysis of occupational air filter samples from different workplaces using different samplers: final results, summary and conclusions

    By Martin Harper

    This paper concludes a five year program on research into the use of a portable X ray fluorescence (XRF) analyzer for analyzing lead in air sampling filters from different industrial environments, inc

    Jan 1, 2007

  • SME
    Pan-European Underground Drainage Water Management Research Centre - A Contribution To Sustainable Water Management In Europe

    By H. Hejny

    The objective of the project is to construct and operate a pan-European underground drainage and minewater management research centre, which would be the hub for data gathering and dissemination in re

    Jan 1, 2007

  • SAIMM
    Feasibility Study Of A 180 Km Nickel Ore Pipeline - Rheological Factors Influencing Slurry Pipeline Design

    By L. J. Park, A. D. Thomas

    Gladstone Pacific Nickel Limited (GPNL) is proposing to develop the Marlborough nickel deposit in central Queensland and the Yarwun Refinery in Gladstone, Australia. The project proposes to connect th

    Jan 1, 2007

  • SAIMM
    The Antamina Copper And Zinc Concentrate Pipeline

    By C. Dechert, J. Norwood

    Compañia Minera Antamina, Peru has recently completed a fifth year of operation of their 301-km concentrate pipeline. The pipeline was commissioned by PSI in May of 2001. The Antamina pipeline is gene

    Jan 1, 2007

  • DFI
    Load Test Analysis On Augered Pressure Grouted Displacement Piles

    By Wei Zheng

    A pulverized coal fired power plant is being built in Osceola, Arkansas, along the Mississippi River. The subsurface soil conditions consist of a certain amount of very soft clayey silt and clay under

    Jan 1, 2007

  • DFI
    Design Of Drilled Shafts Supporting Sound Walls

    By Ke Yang

    Drilled shafts are widely adopted as the foundation for sound walls. However, there has been a lack of uniformity in design and analysis methods and design criteria, in terms of factor of safety again

    Jan 1, 2007

  • SME
    Beacon Hill Station Dewatering Wells and Jet Grouting Program

    By Zephaniah Varley, Dominic Parmantier, Paul Schmall, Richard Martin, Red Robinson

    Sequential excavation of the Beacon Hill Station has been accomplished in highly complex and inter-layered sand, silt, and clay soils with multiple perched groundwater tables. Successful excavation ha

    Jan 1, 2007

  • AUSIMM
    Potential for the Utilisation of Micro-Organisms in Gold Processing

    By D C. McPhail, S L. Rogers, J Brugger

    Using iron- and sulfur-oxidising bacteria to catalyse the breakdown of sulfides that host the gold is an important biological method for the pretreatment of refractory gold ores. Following this biolog

    Jan 1, 2007

  • AUSIMM
    Case Study - Total Life Cycle Planning for a Greenfield Site

    Central to any business is its Asset Management Plan which encapsulates the business context and key organisational objectives such as profitability, safety and environmental standards. Life Cycle Pl

    Jan 1, 2007

  • CIM
    Management Of Contaminated Soil And Groundwater: A Perspective For The Chilean Copper Industry

    By A. Bezama

    For over a decade European countries have addressed contaminated sites by developing technologies for managing both polluted soil and groundwater. This development has not only been driven by health a

    Jan 1, 2007