Search Documents

Sort by

  • ISEE
    Applying up-to-date Blasting Technology and Mine to Mill Concept in Quarries

    By Robert McClure, Frederic Leclercq, Ricardo Chavez

    With significant vibration control and fragmentation challenges facing them, the CBS quarry (department of the Nord) successfully integrated a technical partner and mine to mill optimisation to deal w

    Jan 1, 2007

  • CIM
    Implementation of Air Liquide Shrouded Injector (ALSI) Technology at the Thai Copper Industries Smelter

    By N. Wachgama, J. P. T. Kapusta, R. U. Pagador

    The Thai Copper Industries smelter (Thai Copper) is located some 200 km southeast of Bangkok near the MapTaPhut deep sea port in one of the industrial centres of Thailand. Although construction of the

    Jan 1, 2007

  • CIM
    Transforming Flash Furnace Feed and Burner Stability: Optimizing Furnace Performance and Productivity

    By P. E. Walker, M. E. Reed, R. C. Sims, B. Snowdon, D. E. Fallas

    An advanced Flash Furnace feed system is the key to improving furnace performance. Clyde-WorleyParsons has developed a revolutionary pulseless pneumatic injection feed system technology, capable of de

    Jan 1, 2007

  • AUSIMM
    Increasing Throughput via Improved Automation - More Tonnes, More Quickly, from Existing Assets

    Existing production facilities are constantly looking at ways to increase capacity. Many recent solutions have focused on the implementation of capital and infrastructure projects. It is accepted that

    Jan 1, 2007

  • CIM
    Using Lca To Support Decision-Making And Sustainable Plant Design In Primary Copper Production

    By M. H. Ali

    Codelco, a multi-process primary copper producer, is undertaking a full life cycle inventory (LCI) of all its commercial products based on copper and molybdenum. During this work, many questions have

    Jan 1, 2007

  • SME
    Measuring What Matters: Monitoring The Contribution Of A New Mining Project To Community Sustainability

    Ravensthorpe Nickel Operation (RNO) is a major new mine and processing plant currently being constructed by BHP Billiton in a ?green field? site near the small town of Ravensthorpe, about 150 km west

    Jan 1, 2007

  • AUSIMM
    Flyrock Risk

    The issue of flyrock is critical to the operation of all mineral extraction sites that use blasting. This paper takes a risk-based approach to identifying, analysing and managing the flyrock hazard. T

    Jan 1, 2007

  • CIM
    Environmental and ventilation benefits for underground mining operations using fuel cell powered production equipment (0d6b8fbf-8199-4422-8088-a542f4b15d8b)

    By D. Eastick, S. Hardcastle

    "Over the last few years, a multi-faceted feasibility study has been evaluating the introduction of hydrogen fuel cell-powered equipment into underground mines to replaced diesel engine-powered equipm

    Jan 1, 2007

  • CIM
    Impact of Frother on Bubble Production and Behaviour in the Pulp Zone

    By C. Acuña

    The case is presented that the key role of frother is control of bubble size in the pulp zone. Compared to water alone, the addition of frother produces a narrower distribution and finer bubble size.

    Jan 1, 2007

  • CIM
    Adding Value To Lix / Sx / Ew Operations By Recovering Copper From Bleed, Raffinate And Other Plant Streams

    By E. R. Dixon

    Copper SX/EW plants often bleed part of their electrowinning electrolyte to control impurities and maintain consistent cathode quality. Depending on the specific situation at each site, the bleed is e

    Jan 1, 2007

  • SME
    Analysis Of Airborne And Waterborne Particles Around A Taconite Ore Processing Facility

    By Charles W. Axten

    Since the mid-1970s, samples of airborne and waterborne fibrous particulates have been collected in the area of the Northshore Taconite Ore Processing Facility by the Minnesota Department of Health (M

    Jan 1, 2007

  • CIM
    Structural Controls on Massive Sulfide Deposition and Hydrothermal Alteration in the South Sturgeon Lake Caldera, Northwestern Ontario

    By A. H. Mumin, A. K. Somarin, K. S. Oran

    "Synvolcanic structures played a fundamental role in the genesis, morphology, and siting of volcanogenic massive sulfide ores and associated hydrothermal alteration in the Archean South Sturgeon Lake

    Jan 1, 2007

  • CIM
    Collectorless and Collector-Induced Flotation of Chalcopyrite in Stockpiled Ni-Cu Ores

    By B. Nanthakumar

    The impact of stockpile oxidation on chalcopyrite was studied through collectorless and collector-induced flotation conditions. In both cases, the Cu grade-recovery performance of stockpiled ore showe

    Jan 1, 2007

  • SME
    From The Micro To The Macro Scale: A Textural And Chemical Perspective Of Characterizing Waste-Rock Material

    By H. Lowers, P. Hageman, S. Diehl, D. Fey

    Understanding relationships between mineralogy, texture, microstructural features, and element distribution and residence in minerals, is critical for accurate modeling of mineral weathering in waste-

    Jan 1, 2007

  • CIM
    The Copper-Cobre Series of Conferences: A Prime Forum for Active Discussion of Copper Smelting Technology Practice and Innovation

    By C. M. Diaz, P. J. Mackey

    Since its inception, in 1987, the Copper-Cobre series of conferences has established itself as the prime world forum for discussing advances in copper process metallurgy, in particular copper sulfide

    Jan 1, 2007

  • SME
    Drop Shafts for Narragansett Bay Commission CSO Abatement Program, Providence, Rhode Island

    By Rafael C. Castro, Geoffrey Hughes, Fredrick (Rick) Vincent, Philip H. Albert

    Seven pairs of drop and ventilation shafts, between two and nine feet in diameter, will convey combined sewer flow to a 230-foot-deep, 26-foot diameter storage tunnel. This paper will present case his

    Jan 1, 2007

  • DFI
    Geotechnical Challenges of Pile Driving in a Marginally Stable Slope Terminal 46 Apron Upgrade, Port Of Seattle, WA (18615664-0169-4e91-aa2b-8ec5994bb0a0)

    By Monique Nykamp

    "INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the

    Jan 1, 2007

  • CIM
    Determination of Strain during Hot Tearing in Aluminium Alloys by Digital Image Correlation

    By J. B. Mitchell

    Using digital image correlation the evolution of strain and strain at the onset of localisation resulting in a hot tear has been determined for alloys AA6111 and Al¬0.5wt% Cu during solidification. Hi

    Jan 1, 2007

  • DFI
    Optimization of Deep Foundation Design in a Sand, Gravel and Cobble Formation - Using Pressuremeter Testing In Slotted Sleeve Casing (8ff70823-b892-4925-865f-fae636443d0f)

    By Emad Farouz, Roger Failmezger

    "The proposed reconstruction of I-75 downtown consists of widening an approximately 2.46 Km section of IR-75 through the northern section of downtown Dayton, OH, USA. Bridge B-13 is a 9-span continuos

    Jan 1, 2007

  • AUSIMM
    Project-Finance Risks ù Due Diligence Matters

    Project-finance risk assessment is mature and approached systematically. Mining industry due diligence remains fragmented with specialists addressing different aspects of the project such as reserves/

    Jan 1, 2007