Search Documents

Sort by

  • AUSIMM
    Rock Fall Protection Barrier at Mill Area of PT Freeport Indonesia - ABSTRACT ONLY

    The mill area of PT Freeport Indonesia is located in a valley surrounded by steep natural slope, characterised by extreme topography with mountains rising to above 4500 m within 100 km from the seasho

    Nov 25, 2010

  • AUSIMM
    Changing the Ground Support in Cemented Hydraulic Backfill at CSA Mine

    CSA mine, which is a deep level copper operation, located 12 km north of Cobar, NSW, currently uses a top down stoping method, utilising cemented hydraulic backfill (CHF) to fill and stabilise the sto

    Nov 25, 2010

  • AUSIMM
    Development of a Corrosivity Classification for Weld Mesh Support at Cannington Mine

    Cannington Mine is an underground, hard rock, metalliferous mine located in North-Western Queensland, Australia. Weld mesh is installed to prevent the failure of rock from between the installed reinfo

    Nov 25, 2010

  • AUSIMM
    Design of Air-Blast Plugs for a Sublevel Caving Operation

    The Telfer Underground sublevel cave (SLC) Operation is located approximately 850 m below surface. The cave was designed to propagate through an old decline which was initially used to monitor the cav

    Nov 25, 2010

  • AUSIMM
    Pillar Design Procedures and Research Methodologies - Can There or Should There be a Unified Approach?

    After some 50 years of worldwide research in relation to coal pillar mechanics and design as well as numerous workshops and technical papers related to these issues there is still some significant dis

    Nov 25, 2010

  • AUSIMM
    Pastefill - A Multi-Disciplined Review of Barrick Gold Corporation's Pastefill Operations in Australia

    During 2009 the technical services staff at Barrick Gold Corporation's Australian Business Unit conducted a review of their five underground mines that utilise pastefill as the backfill component

    Nov 25, 2010

  • CIM
    New Miner Training Program

    By Denis Beaudoin

    Program Basics: Goals, Course Content & Training Process Sudbury: History of the Program & Lessons Learned Diavik: History of the Program & Lessons Learned Most Recent Program: Totten Mine in partn

    Oct 1, 2010

  • CIM
    An Economical Vertical Transport System to Hoist 3 Mt of Ore per Annum from 1640 m

    By Wendy L. Naysmith

    This paper deals with the various options considered and factors that influenced the final selection of the headframe, shaft layout and hoisting systems required at the Impala No 16 Shaft in order to

    Oct 1, 2010

  • CIM
    Transportation of Paste Backfill: Mouska Mine Case Study

    By Emilie Williams

    Introduction Mouska Mine, Doyon Division site Background and timeline Obstacles to standard paste delivery system Components of Mouska paste system Technical considerations Operational considera

    Oct 1, 2010

  • CIM
    Maintenance Engineering ? Mine Operators Conference

    Presentation Topics ? Low and Intermediate Level Waste ? Project Location and Site ? Geological Setting ? Key Features ? Project Overview ? Licensing and EIS ? Next Steps DGR Waste Package Inv

    Oct 1, 2010

  • CIM
    Microseismic System Blast Identification Techniques

    By Pavel Vasak

    Microseismic monitoring is becoming standard practice in the Canadian mining industry, particularly as mines get deeper. Full-waveform microseismic systems allow the operator to distinguish the event

    Oct 1, 2010

  • CIM
    Sudbury Regional Seismic Network

    By Marty Hudyma

    Large seismic events have been reported in mines in the Sudbury mining camp for more than 70 years. Nevertheless, no detailed record of the events has been compiled. In 2008, the Sudbury Regional Seis

    Oct 1, 2010

  • CIM
    MEMO 2010 Canadian Mining Credentials Program

    By Barbara Kirby

    Mining Industry Human Resource Council Who we are: National Sector Council for the Minerals and Metals Sector 18-person Board of Directors Over 100 Industry Volunteers PPP - Funded by HRSDC and i

    Oct 1, 2010

  • CIM
    Evaluation of Ventilation On Demand (VOD) in Sudbury Mines

    By G. Lyle

    Since its inception CEMI (Centre for Excellence in Mining Innovation) has focused on facilitating innovative solutions to the mining industry in six strategic research areas; GeoRisk, ConstructMine, V

    Oct 1, 2010

  • CIM
    Increased Productivity by Condition-Based Maintenance Using Wireless Strain Measurement System

    By Chris V. Sellathamby

    Condition-based maintenance is replacing preventive maintenance in many industrial operations as a result of gains in productivity. Preventive maintenance is strictly time-based which means that as lo

    Oct 1, 2010

  • CIM
    New Technology Provides Expanded Mine Design Options

    By Michael J. Kelly

    IAMGOLD?s Westwood project is the site for the largest, by volume, bored vent raise in North America. When completed, it will be the fifth largest bored worldwide in a single pass. This paper will re

    Oct 1, 2010

  • CIM
    Implementation of mining-induced seismic hazard maps at Creighton Mine for risk assessment of rockmass damage due to mining at depth

    By Pavel Vasak

    The Laurentian University Virtual Reality Laboratory (VRL) has provided a unique platform for the development and testing of novel seismic and microseismic data processing and visualization technology

    Oct 1, 2010

  • CIM
    Applications and use of roadheaders in rock environment beyond 100 MPa hardness

    By C. Greimel

    Modern roadheaders provide a safe and cost-effective, yet very flexible way of mechanical tunnel and roadway excavation. In the last years, SANDVIK Mining and Construction has developed a NEW ROADHEAD

    Oct 1, 2010

  • CIM
    Laser Scanning (HDS) More Accurate Information + Tighter Designs = Less Field Work and Re-Work

    By Rod Abbott

    High Definition Scanning (laser scanning) is a proven technology that is accurate to within 6mm in 50m (¼? in 150?). It can capture in excess of one million 3D point measurements in an average 2 hour

    Oct 1, 2010

  • CIM
    Strategy for Reducing Ammonium Nitrate Loss to Mine Discharge Water

    By Daniel J. Corkery

    Mines in Canada and the United States are subject to regulations limiting ammonia, nitrate and nitrite levels in mine effluents released into the environment. The primary source of these nitrogen comp

    Oct 1, 2010