Search Documents

Sort by

  • AUSIMM
    Preliminary Design for the Rockwater Power Project, South Island, New Zealand

    By H Asche

    The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak

    Mar 8, 2011

  • AUSIMM
    Concept Design of the Central Business District Rail Link, Auckland

    By J Q. Cooper

    The New Zealand rail authority, Kiwi Rail and Auckland Regional Transport Authority (ARTA), are jointly planning a new mainline rail link between Auckland’s downtown Britomart Station and the existing

    Mar 8, 2011

  • AUSIMM
    Influence of Vertical Pile Loading on Existing Tunnel Lining in Soft Clay

    By R Ayothiraman

    Tunnel excavation may induce adverse effects on nearby existing structures/foundations in urban areas. Accurate prediction of tunnelling effects on pile foundations of nearby structures in the urban e

    Mar 8, 2011

  • AUSIMM
    Reinstating a One Hundred Year Old Tunnel in the Southern Alps Through Highly Fractured Schist for Hydro Generation

    By R Shelton

    The Big Wainihinihi River and tunnel are located on the western side of the Southern Alps of New Zealand within the active Alpine Fault zone, which marks the boundary between the Pacific and Australia

    Mar 8, 2011

  • AUSIMM
    Durability Planning for Underground Infrastructure

    By D Wimpenny

    Underground infrastructure is often a critical component of transportation and utility schemes. It is characterised by long design lives with limited access for inspection and maintenance. The exposur

    Mar 8, 2011

  • AUSIMM
    Marine Recovery of Tunnel Boring Machine from Botany Bay

    By S Norman

    The Water Delivery Alliance (WDA) was established to design, construct and commission the pump station and desalinated water delivery pipeline to link the desalination plant on the Kurnell Peninsula (

    Mar 8, 2011

  • AUSIMM
    Jacked Box Versus Cut and Cover Technique for the Pedestrian Underpass Construction in Brisbane

    By A Purwodihardjo

    Evaluation of the construction method used for the pedestrian underpass construction at Ipswich Road, Brisbane, Australia is presented in this paper. The pedestrian underpass was constructed through t

    Mar 8, 2011

  • AUSIMM
    Melbourne Main Sewer Project – Construction Phase – Soft Ground Tunnelling in the Yarra Delta

    By P Clark

    This paper discusses the challenges, solutions and lessons learnt as tunnelling work continues on the Melbourne Main Sewer Replacement (MMSR) project.The MMSR project is a $220 million dollar project

    Mar 8, 2011

  • AUSIMM
    Innovative Victoria Park Tunnel design is Communicated Effectively to Stakeholders with the Aid of Three-Dimensional Visualisation Medi

    By M Sparrow

    The Victoria Park Tunnel project is an inner-city alliance project in central Auckland, New Zealand. The existing two-directional viaduct will be modified to single-direction flow, and a new northboun

    Mar 8, 2011

  • AUSIMM
    New Methods for Quantifying Geology and Geological Engineering Risk in Large-Scale Deep Tunnelling – Both in Design and in the Build Phase

    By D FitzGerald

    A critical component of any new tunnel design in a complex geological setting is the development of an integrated three-dimensional (3D) geology model with a full set of geotechnical properties of the

    Mar 8, 2011

  • AUSIMM
    Western Ring Route – Waterview Connection: Calculation of Ground Settlements and their Effects

    By J P. Burr

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will include 2.1 km of ‘undrained’ driven tunnels, 500 m of drained cut-and-co

    Mar 8, 2011

  • AUSIMM
    Rock Bolts for Permanent Tunnel Lining

    By J de Witte

    When used in suitable ground conditions, rock bolts can have advantages over other permanent tunnel lining solutions. Permanent rock bolts offer flexibility in tunnelling profile and rapid rock bolt i

    Mar 8, 2011

  • AUSIMM
    Segmental Tunnel Lining Breakouts and Cross Connection Tunnels – Adelaide Desalination Plant, Australia

    By L Drowley

    The Adelaide Desalination Plant (ADP) draws raw sea water into the facility and returns saline concentrate to the Gulf St Vincent via subsea conduits. This paper describes the detailed design and cons

    Mar 8, 2011

  • AUSIMM
    Waterproof Detailing in Drained and Undrained Tunnels

    By J Palise

    As cities become more populated and the need for tunnelling increases, we continue to dig deeper urban tunnels in more challenging ground conditions. At the same time our expectations for durability a

    Mar 8, 2011

  • AUSIMM
    Strength and Stiffness Parameters for Tunnels in Weak Sedimentary Rocks – A Case Study of the East Coast Bays Formation in Auckland, New Zealand

    By W Newns

    This paper describes laboratory and in situ tests and determines a set of parameters for stiffness and strength properties for a weak sedimentary rock mass, the East Coast Bays Formation of Auckland.

    Mar 8, 2011

  • AUSIMM
    Sandgate Avenue Flood Alleviation Project, Stage 1 –Slurry Treatment Plant – Lessons Learnt

    By M Weeks

    Melbourne Water Corporation, through the Pipelines Alliance, has commenced construction of a new drainage pipeline to provide additional flood protection within the Sandgate Avenue Main Drain catchmen

    Mar 8, 2011

  • AUSIMM
    Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement Project

    By M Behrens

    The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th

    Mar 8, 2011

  • AUSIMM
    Rosedale Outfall Project – Overcoming Extreme Conditions

    By T Ireland

    The Rosedale Outfall Project utilised an earth pressure balance (EPB) tunnel boring machine (TBM) for only the second time in Auckland. Although the tunnel was excavated fully through East Coast Bays

    Mar 8, 2011

  • AUSIMM
    The Use of Glass-Fibre Reinforced Plastic on the Northern Sewerage Project Stage 1 – Design and Construction Considerations

    By S Goff

    The Northern Sewerage Project (NSP) is a $650 M infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs while also helping to protect the

    Mar 8, 2011

  • CIM
    Characterization of AZ91 Type Alloy with Silicon Addition

    By S. Lun Sin

    In this study, the effect of silicon on the microstructure, mechanical properties and hot tearing susceptibility of permanent mould cast AZ91E magnesium alloy was investigated. Varying amounts of sili

    Jan 1, 2011