Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Sensible Cost Cutting for Resource ProjectsBy D Connelly
As the resources sector becomes tougher with rising costs and cyclical metal prices, mining companies need to continue to reduce their costs and do more with less. Many new resource projects fail to c
Aug 8, 2011
-
Reducing Mining and Mineral Processing Plant Fatality RatesBy N Cann
In the 10 years from 1998 to 2008 the annual number of fatalities in the Australian mining industry has plateaued (MCA, 2007-08 and abc.net.au website). Despite significant efforts to eliminate fatali
Aug 8, 2011
-
‘We’re Metallurgists, not Magicians!’By E McLean
The decision making check-list and hierarchy of information for process and plant design is generally wide-ranging and complex. The nature of grades, mineralisation and ore types in an ore body, its
Aug 8, 2011
-
Integrating Sustainability Principles into Mineral Processing Plant DesignBy G Corder
Even though most major operating companies in the minerals industry have Board-level endorsed sustainability principles and objectives, design engineers typically have no mechanism that allows them to
Aug 8, 2011
-
Flotation Mechanism Design for Improved Metallurgical and Energy PerformanceBy R Coleman
The flotation mechanism plays a key role in the flotation process. It is used to provide the contact between solid particles and bubbles and also the energy for these particles and bubbles to attach.
Aug 8, 2011
-
Keeping Projects on the RailsBy J Canterford
Although we have access to a wide range of sophisticated process design and improvement tools in combination with a significant range of case studies, the mineral resource industry still manages to be
Aug 8, 2011
-
Leach Residue and Pregnant Liquor Separation – Process and Capital Comparison of Counter-Current Decantation and Counter-Current Washing with Vacuum FiltrationBy R Klepper
Separation of leach residue suspended solids from pregnant liquor solution is an important step in hydrometallurgy flowsheets. Alternative flowsheet options are counter-current decantation (CCD) thick
Aug 8, 2011
-
Chirano Gold Mine Expansion – A Case StudyBy S Ellis
In January 2008 Chirano Gold Mines Limited committed to expansion of the Chirano Gold Project from its existing design capacity of 2 Mtpa ROM ore to a new design value of 3.5 Mtpa. In addition to incr
Aug 8, 2011
-
An Approach to High Solids Slurry Pipeline DesignBy M Griffiths
This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she
Aug 8, 2011
-
Differences between the Engineering Cultures of Australia and BrazilBy C Fountain
Australian mining and engineering companies have increasingly been investing in the mining industry in Brazil. It is a country of enormous mineral and agricultural wealth, with a well-established mini
Aug 8, 2011
-
Energy Efficiency Assessments in Design – Seminal Decisions and Effective ProcessesBy M Allen
Energetics has been in the business of climate change for more than twenty years. This experience has only served to cement the understanding that decisions taken during design define the environmenta
Aug 8, 2011
-
Recent Improvements to the Gravity Gold Circuit at Marvel LochBy A Bird
Gravity gold circuits have an important part in reducing operating costs and maximising recovery in modern gold plants where coarse gold is present in the ore body. The design and selection of equipme
Aug 8, 2011
-
On-Belt Analysis at Sepon Copper OperationBy T Arena
To maintain copper recoveries and maximise production at the Sepon Copper Operation it is crucial to control the amount of copper entering the leaching circuit. This requires close control of blending
Aug 8, 2011
-
Flotation Process Control Optimisation at Prominent HillBy J Lombardi
OZ Minerals' Prominent Hill copper-gold concentrator is located 130 kilometres south east of the town of Coober Pedy in the Gawler Craton of South Australia. The concentrator was built in 2008 an
Aug 8, 2011
-
Cost Effective Concentrator DesignBy G Lane
This paper discusses the factors that contribute to the cost effective design of a concentrator. Concentrator design and layout outcomes are functions of the team (engineer’s and owner’s) participati
Aug 8, 2011
-
Fosterville Gold Mine Heated Leach ProcessBy M Binks
The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo
Aug 8, 2011
-
In-Pit Tailings – World’s Best Practice for Long-Term Management of TailingsBy G M. Mudd
Mine tailings represent one of the two largest sources of mine waste from the minerals industries (the other being waste rock). Given the problems of declining ore grades and growing production, taili
Aug 8, 2011
-
Contract Commissioning and Operation of Western Areas’ Cosmic Boy ConcentratorBy C Dick
Over the past three decades, mining operations have seen a significant increase in the use of contractors for mining, camp management and catering, recruitment, maintenance, power management, and comm
Aug 8, 2011
-
Energy Efficiency Opportunities in Milling – Improving Comminution Circuit EfficiencyBy F Musa
One of the main energy efficiency opportunities identified from the majority of mine site energy audits is to optimize the comminution circuit to reduce energy consumption through improved throughput
Aug 8, 2011
-
Float it, Clean it, Depress it – Consolidating the Separation Stages at Clarabelle MillBy V Lawson
Vale’s Sudbury Clarabelle Mill processes Cu/Ni ores from a number of mines in the Sudbury basin in Ontario, Canada. Bulk sulphide flotation produces a copper-nickel concentrate with pyrrhotite as the
Aug 8, 2011