Search Documents

Sort by

  • AUSIMM
    Sensible Cost Cutting for Resource Projects

    By D Connelly

    As the resources sector becomes tougher with rising costs and cyclical metal prices, mining companies need to continue to reduce their costs and do more with less. Many new resource projects fail to c

    Aug 8, 2011

  • AUSIMM
    Reducing Mining and Mineral Processing Plant Fatality Rates

    By N Cann

    In the 10 years from 1998 to 2008 the annual number of fatalities in the Australian mining industry has plateaued (MCA, 2007-08 and abc.net.au website). Despite significant efforts to eliminate fatali

    Aug 8, 2011

  • AUSIMM
    ‘We’re Metallurgists, not Magicians!’

    By E McLean

    The decision making check-list and hierarchy of information for process and plant design is generally wide-ranging and complex. The nature of grades, mineralisation and ore types in an ore body, its

    Aug 8, 2011

  • AUSIMM
    Integrating Sustainability Principles into Mineral Processing Plant Design

    By G Corder

    Even though most major operating companies in the minerals industry have Board-level endorsed sustainability principles and objectives, design engineers typically have no mechanism that allows them to

    Aug 8, 2011

  • AUSIMM
    Flotation Mechanism Design for Improved Metallurgical and Energy Performance

    By R Coleman

    The flotation mechanism plays a key role in the flotation process. It is used to provide the contact between solid particles and bubbles and also the energy for these particles and bubbles to attach.

    Aug 8, 2011

  • AUSIMM
    Keeping Projects on the Rails

    By J Canterford

    Although we have access to a wide range of sophisticated process design and improvement tools in combination with a significant range of case studies, the mineral resource industry still manages to be

    Aug 8, 2011

  • AUSIMM
    Leach Residue and Pregnant Liquor Separation – Process and Capital Comparison of Counter-Current Decantation and Counter-Current Washing with Vacuum Filtration

    By R Klepper

    Separation of leach residue suspended solids from pregnant liquor solution is an important step in hydrometallurgy flowsheets. Alternative flowsheet options are counter-current decantation (CCD) thick

    Aug 8, 2011

  • AUSIMM
    Chirano Gold Mine Expansion – A Case Study

    By S Ellis

    In January 2008 Chirano Gold Mines Limited committed to expansion of the Chirano Gold Project from its existing design capacity of 2 Mtpa ROM ore to a new design value of 3.5 Mtpa. In addition to incr

    Aug 8, 2011

  • AUSIMM
    An Approach to High Solids Slurry Pipeline Design

    By M Griffiths

    This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she

    Aug 8, 2011

  • AUSIMM
    Differences between the Engineering Cultures of Australia and Brazil

    By C Fountain

    Australian mining and engineering companies have increasingly been investing in the mining industry in Brazil. It is a country of enormous mineral and agricultural wealth, with a well-established mini

    Aug 8, 2011

  • AUSIMM
    Energy Efficiency Assessments in Design – Seminal Decisions and Effective Processes

    By M Allen

    Energetics has been in the business of climate change for more than twenty years. This experience has only served to cement the understanding that decisions taken during design define the environmenta

    Aug 8, 2011

  • AUSIMM
    Recent Improvements to the Gravity Gold Circuit at Marvel Loch

    By A Bird

    Gravity gold circuits have an important part in reducing operating costs and maximising recovery in modern gold plants where coarse gold is present in the ore body. The design and selection of equipme

    Aug 8, 2011

  • AUSIMM
    On-Belt Analysis at Sepon Copper Operation

    By T Arena

    To maintain copper recoveries and maximise production at the Sepon Copper Operation it is crucial to control the amount of copper entering the leaching circuit. This requires close control of blending

    Aug 8, 2011

  • AUSIMM
    Flotation Process Control Optimisation at Prominent Hill

    By J Lombardi

    OZ Minerals' Prominent Hill copper-gold concentrator is located 130 kilometres south east of the town of Coober Pedy in the Gawler Craton of South Australia. The concentrator was built in 2008 an

    Aug 8, 2011

  • AUSIMM
    Cost Effective Concentrator Design

    By G Lane

    This paper discusses the factors that contribute to the cost effective design of a concentrator. Concentrator design and layout outcomes are functions of the team (engineer’s and owner’s) participati

    Aug 8, 2011

  • AUSIMM
    Fosterville Gold Mine Heated Leach Process

    By M Binks

    The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo

    Aug 8, 2011

  • AUSIMM
    In-Pit Tailings – World’s Best Practice for Long-Term Management of Tailings

    By G M. Mudd

    Mine tailings represent one of the two largest sources of mine waste from the minerals industries (the other being waste rock). Given the problems of declining ore grades and growing production, taili

    Aug 8, 2011

  • AUSIMM
    Contract Commissioning and Operation of Western Areas’ Cosmic Boy Concentrator

    By C Dick

    Over the past three decades, mining operations have seen a significant increase in the use of contractors for mining, camp management and catering, recruitment, maintenance, power management, and comm

    Aug 8, 2011

  • AUSIMM
    Energy Efficiency Opportunities in Milling – Improving Comminution Circuit Efficiency

    By F Musa

    One of the main energy efficiency opportunities identified from the majority of mine site energy audits is to optimize the comminution circuit to reduce energy consumption through improved throughput

    Aug 8, 2011

  • AUSIMM
    Float it, Clean it, Depress it – Consolidating the Separation Stages at Clarabelle Mill

    By V Lawson

    Vale’s Sudbury Clarabelle Mill processes Cu/Ni ores from a number of mines in the Sudbury basin in Ontario, Canada. Bulk sulphide flotation produces a copper-nickel concentrate with pyrrhotite as the

    Aug 8, 2011