Development of the Ernest Henry Underground Mine – The Challenges and the SolutionsBy T Purvis
Xstrata Copper is extending the Ernest Henry Mine with a 6 Mtpa sub-level cave (SLC) mine being constructed under the pit. The SLC mine will maintain the EHM operation until 2024 after the pit is comp
Mar 21, 2011
-
Construction of the Seven Thousand Tonne per Day – Big Gossan Production ShaftBy N Herault
PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro
Mar 21, 2011
-
Bored Reinforced Piles for Raise Bore Support – Four Case Studies and Guidelines Developed from Lessons LearntBy P Marlow
Raiseboring is an attractive method of constructing shafts, being safe, fast and comparatively cheap. But this means back-reaming through weathered ground. However in the gravels and weathered near-su
Mar 21, 2011
-
Starting-Up the Ernest Henry Underground Mine – Thermal and Occupational Hygiene ChallengesBy O van Baalen
The Ernest Henry Mine is a copper-gold open pit operation situated in northwest Queensland, Australia. It is owned and operated by Xstrata Copper, with a current throughput of 11 Mtpa, however, open p
Mar 21, 2011
-
Fine-Tuning Raise Bore Stability Assessments and RiskBy W A. Peck
Raise boring is the preferred option for constructing ventilation shafts in Australia. The trend has been towards larger diameters and longer single-pass shafts, and if at all possible, reaming throug
Mar 21, 2011
-
How Leadership Can Create an Enduring Safety CultureBy J Ross
The foundation of effective leadership is communication. You can have all the leadership theories, models and training you want, but in the end it is all about leaders talking to, listening to and und
Mar 21, 2011
-
Mine Shafts – Planning, Optimising and ConstructingBy D J. Kilkenny
Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq
Mar 21, 2011
-
Improved Technology – Selection of a Suitable Underground Concrete Transport VehicleBy S Mitchell
Jetcrete Australia Pty Ltd, shotcrete contractor took the initiative in 2008 to discontinue the use of ‘road registerable’ concrete trucks for all underground works in Australia and internationally.Th
Mar 21, 2011
-
Fast, Safe and Fully Mechanised Installation of High-Tensile Chain-Link Mesh for Underground SupportBy V Louchnikov
Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in situ stresses and associated seismicity with potential rock burst hazards are th
Mar 21, 2011
-
Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper OperationsBy G Chitumbura
Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu
Mar 21, 2011
-
Developing the Ridgeway Deeps Project with an Operations AttitudeBy C Jones
Ridgeway Deeps is a block cave (BC) located down dip of the operating Ridgeway sublevel cave (SLC) mine. The BC is located approximately 210 m vertically below the lowest SLC level and approximately 1
Mar 21, 2011
-
Perimeter Control Utilising Electronic Detonators at Mount Wright MineBy J Wall
The use of electronic detonators in civil tunnelling applications, to reduce vibration in small firings has been successfully utilised for a number of years. As part of the mining industry’s commitmen
Mar 21, 2011
-
Simulation Aided Engineering – Integration of Monitoring, Modelling and PlanningBy D Beck
Open access to forecasts of mine geotechnical performance in the form of open databases of model results has been considered risky in the past, with a concern that the results will not be understood o
Mar 21, 2011
-
What Have we Learnt About Managing Rock Burst Risks?By Y Potvin
Underground mines in Australia are progressively operating at greater depth, sometimes in conditions where mine induced stresses are very high. In such conditions, the seismic activity often becomes i
Mar 21, 2011
-
Sustainable Minerals Education – We Care, But do You?By D Laurence
Mining cycles have come and gone and with them there have been dramatic swings in the levels of interest and student entry into minerals-related education programs, hence graduate supply to the indust
Mar 21, 2011
-
Use of a Crane Mounted Auger for Presink Construction at Fosterville Gold MineBy P Jones
Fosterville Gold Mine is an underground operation located approximately 20 km northeast of Bendigo and 170 km north of Melbourne. Fosterville is the most productive gold mine in Victoria, producing ov
Mar 21, 2011
-
Quality Control Aspects of Shotcrete in Mining – The Round Determinate Panel TestBy P M. Dight
Shotcrete usage in declines and developments has become pervasive as operators strive to achieve production improvements. Issues of mix control, fibreload, thickness control, temperature and curing co
Mar 21, 2011
-
Advantages and Specifications for Pipe Umbrella Support SystemsBy G M. Volkmann
Pipe umbrella systems have effectively been used as an additional support system in the working area in weak ground conditions during the last decades. Thus, a considerable number of applications acco
Mar 8, 2011
-
Brisbane Airport Link Earth Pressure Balance Machine Two Component Tailskin Grouting – A New Australian RecordBy A Reschke
The Thiess John Holland Group is undertaking the design and construction of Brisbane’s Airport Link Project, the largest single investment in transportation infrastructure in Australian history. Twin
Mar 8, 2011
-
Western Ring Route – Waterview Connection Driven Tunnel: Assessment of Groundwater EffectsBy S France
The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will comprise 2.5 km of ‘undrained’ driven tunnels and 900 m of drained cut-an
Mar 8, 2011