Search Documents

Sort by

  • AUSIMM
    Raising Sangdong – A Staged Approach to the Redevelopment of an Old Operation

    By C Lutherborrow

    The Sangdong Tungsten/Molybdenum Deposit is located in the Republic of Korea and was discovered in 1916. At this time Korea was a colony of Japan. It was mined for two years after discovery closing in

    Aug 22, 2011

  • AUSIMM
    Role of Environmental Ore Deposit Models in Resources Development

    By Y T. J Kwong

    With the recent emphasis worldwide on environmental protection and sustainable development, finding an enriched mineral deposit no longer guarantees mining development. Only if the identified resource

    Aug 22, 2011

  • AUSIMM
    Re-Invigorating Unloved Projects

    By D Price

    Mining at the Tuckabianna Mining Centre in the Murchison district of Western Australia ceased in 1997, after the production of 550 000 ounces of gold at an average grade of 2.5 g/t from 22 separate op

    Aug 22, 2011

  • AUSIMM
    The Merlin Molybdenum Rhenium Deposit, Mt Isa Inlier – Two Years from Discovery to Development

    By G Phillips

    The Merlin project is situated 130 km south of Cloncurry in North West Queensland, Australia. It is located within the Pre-Cambrian Mt Isa Inlier and is grouped within the Eastern Fold Belt. The host

    Aug 22, 2011

  • AUSIMM
    The Challenges of Selective Mining within the Globe Progress Gold Mine, Reefton, South Island, New Zealand

    By R Cooksey

    The Globe-Progress Mine is an open pit gold mine that is part of the larger Reefton Goldfields deposit located on the West Coast of New Zealand. The regional geology comprises a series of north to sou

    Aug 22, 2011

  • AUSIMM
    The Influence of Geology on Blasting Hazards and Results

    By T N. Little

    The aim of any rock breaking activity is to achieve success by developing designs that are blasting objective-specific and geology-specific, and then implementing such designs. This paper targets mini

    Aug 22, 2011

  • AUSIMM
    Training our New Starters – Between a Rock and a Hard Place

    By M Davis

    Increasing growth in the minerals industry over the past decade has raised the question of whether the standard of training for new geologists has been negatively impacted. This hypothesis was tested

    Aug 22, 2011

  • AUSIMM
    Professional Development for Metallurgists – Improving Technical Skills

    By D Drinkwater

    In 2009, Peter Munro and Peter Tilyard examined the “human capital” in the mineral processing sector in a paper entitled Back to the Future (Munro and Tilyard, 2009). One of their major concerns was

    Aug 8, 2011

  • AUSIMM
    The Integration of Geometallurgy with Plant Design

    By G Harbort

    Traditional engineering design for flotation circuits use the “Rule of Thumb” approach. Typically this uses a nominated maximum head grade for design. A scale-up factor is applied to laboratory flotat

    Aug 8, 2011

  • AUSIMM
    Sensible Cost Cutting for Resource Projects

    By D Connelly

    As the resources sector becomes tougher with rising costs and cyclical metal prices, mining companies need to continue to reduce their costs and do more with less. Many new resource projects fail to c

    Aug 8, 2011

  • AUSIMM
    Reducing Mining and Mineral Processing Plant Fatality Rates

    By N Cann

    In the 10 years from 1998 to 2008 the annual number of fatalities in the Australian mining industry has plateaued (MCA, 2007-08 and abc.net.au website). Despite significant efforts to eliminate fatali

    Aug 8, 2011

  • AUSIMM
    ‘We’re Metallurgists, not Magicians!’

    By E McLean

    The decision making check-list and hierarchy of information for process and plant design is generally wide-ranging and complex. The nature of grades, mineralisation and ore types in an ore body, its

    Aug 8, 2011

  • AUSIMM
    Integrating Sustainability Principles into Mineral Processing Plant Design

    By G Corder

    Even though most major operating companies in the minerals industry have Board-level endorsed sustainability principles and objectives, design engineers typically have no mechanism that allows them to

    Aug 8, 2011

  • AUSIMM
    Flotation Mechanism Design for Improved Metallurgical and Energy Performance

    By R Coleman

    The flotation mechanism plays a key role in the flotation process. It is used to provide the contact between solid particles and bubbles and also the energy for these particles and bubbles to attach.

    Aug 8, 2011

  • AUSIMM
    Keeping Projects on the Rails

    By J Canterford

    Although we have access to a wide range of sophisticated process design and improvement tools in combination with a significant range of case studies, the mineral resource industry still manages to be

    Aug 8, 2011

  • AUSIMM
    Leach Residue and Pregnant Liquor Separation – Process and Capital Comparison of Counter-Current Decantation and Counter-Current Washing with Vacuum Filtration

    By R Klepper

    Separation of leach residue suspended solids from pregnant liquor solution is an important step in hydrometallurgy flowsheets. Alternative flowsheet options are counter-current decantation (CCD) thick

    Aug 8, 2011

  • AUSIMM
    Chirano Gold Mine Expansion – A Case Study

    By S Ellis

    In January 2008 Chirano Gold Mines Limited committed to expansion of the Chirano Gold Project from its existing design capacity of 2 Mtpa ROM ore to a new design value of 3.5 Mtpa. In addition to incr

    Aug 8, 2011

  • AUSIMM
    An Approach to High Solids Slurry Pipeline Design

    By M Griffiths

    This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she

    Aug 8, 2011

  • AUSIMM
    Differences between the Engineering Cultures of Australia and Brazil

    By C Fountain

    Australian mining and engineering companies have increasingly been investing in the mining industry in Brazil. It is a country of enormous mineral and agricultural wealth, with a well-established mini

    Aug 8, 2011

  • AUSIMM
    Energy Efficiency Assessments in Design – Seminal Decisions and Effective Processes

    By M Allen

    Energetics has been in the business of climate change for more than twenty years. This experience has only served to cement the understanding that decisions taken during design define the environmenta

    Aug 8, 2011