Search Documents

Sort by

  • CIM
    Developing an Interactive, Collaborative Virtual Underground Mine to Support Mine Emergency Response Excercises

    By Tony Szwilski

    Using Unity 3D as a collaborative multi-user virtual on-line environment, an interactive virtual underground mine platform (IVUMP) is being developed to provide on-line access to mine safety preparedn

    Aug 1, 2013

  • CIM
    Coordination Guidelines for Virtual Design and Construction

    By Anoop Sattineni

    Over the past decade the use of BIM in the AEC industry has grown several fold and with it the number of standards available for implementing BIM. The ?National BIM Standard? by buildSmart Alliance, t

    Aug 1, 2013

  • CIM
    Automated Development of Construction Schedules Using Onsite Data Acquisition

    By Magdy Ibrahim

    Detailed as-built project schedules are necessary to close out construction projects, benchmarking, forecasting, dispute resolution, and improving cost estimates of future projects. Manual procedures

    Aug 1, 2013

  • CIM
    Research on the Comparison of Operator Viewpoints Between Manned and Remote Control Operation in Unmanned Construction Systems

    By Akihiko Nishiyama

    Unmanned construction technology used for remote control operation of construction machines has some problems to solve compared with manned operation of construction machines, such as fatigue due to l

    Aug 1, 2013

  • CIM
    Multi-Point Concurrent Tracking and Surveying in Construction Field

    By S. Mao

    Total station has been predominantly applied in stationary survey scenarios in construction. With the moving target tracking and point survey automation functions, a robotic total station (RTS) lends

    Aug 1, 2013

  • CIM
    The Application Of IPCC at the Moatize Coal Project

    By R. J. McCarthy

    In-pit Crushing and Conveying (IPCC) is increasingly being considered by mining companies as a means to reduce their dependence on trucks and thus, fuel, tires, labour, etc. There is potential for gre

    Aug 1, 2013

  • CIM
    Strength, Deformation and Thermal Parameters of Rocks Heated to High Temperatures

    By Piotr Malkowski

    Studies on the properties of rocks heated to high temperatures are rather rare. Such research is occasionally conducted for example; in areas around nuclear power plants. The national Polish coal gasi

    Aug 1, 2013

  • CIM
    Experimental Study on Typical Coal Mine Fire Gas Indices

    By Jun Deng

    The aim of this paper is to study the scientificity and reliability of three coal gas indices used to predict coal fire disasters, namely Graham?s ratio, CO/CO2 ratio, Litton ratio and their different

    Aug 1, 2013

  • CIM
    The 7 Delusions of Disaster-Prone Organizations

    By Corrie Pitzer

    Safety performance in many companies and even industries has stalled in the last decade. Accidents rates are improving but more slowly and yet, serious accidents and fatality rates are not: in fact, t

    Aug 1, 2013

  • CIM
    Improving Site and Materials Handling Operations Through Autonomous Vehicle-Related Technologies

    By Ashley Tews

    In 2005, we automated a forklift-based Hot Metal Carrier to be capable of typical metal transfer operations around a smelter. The project was highly successful and the vehicle has demonstrated hundred

    Aug 1, 2013

  • CIM
    Autonomous Robotic Dozing for Rapid Material Removal

    By Gary M. Bone

    The autonomous control of vehicles interacting forcibly with their environment, such as dozers and tractors, is an unsolved and challenging problem. Forces and motions are inherently coupled between t

    Aug 1, 2013

  • CIM
    The Earth Moving Equipment Safety Round Table Design Evaluation for Equipment Procurement Process

    Diverse and considerable energies are associated with mobile equipment operated and maintained on mine sites. Loss of control of these energies is a common cause of injury on mine sites and this is we

    Aug 1, 2013

  • CIM
    Leveraging Bim for Automated Fault Detection in Operational Buildings

    By A. Golabchi

    Building Information Modeling (BIM) is an increasingly popular method for generating and managing facility information during the life cycle of a building, ranging from facility conceptualization, thr

    Aug 1, 2013

  • SME
    Five mining greats to be inducted into the National Mining Hall of Fame

    The National Mining Hall of Fame and Museum (NMHF&M) will induct the 2013 National Mining Hall of Fame class on Sept. 14, 2013. The ceremony will take place at the Brown Palace Hotel in Denver, CO.

    Aug 1, 2013

  • CIM
    Data Communication Manager for an Intelligent Excavation System

    By Jeonghwan Kim

    Intelligent Excavation System (IES) has been considered to be one of the desirable solutions to improve the productivity, quality and safety of the current earthwork processes. IES is composed of vari

    Aug 1, 2013

  • CIM
    Design and Construction of Hydrostatic Mine Shaft Liners Using Cast Iron Tubbing Technology

    By J. Ouellet

    The design of hydrostatic liner for a deep potash mine shaft in Saskatchewan poses tremendous technological challenges. Technology has evolved to a point where one could consider a new innovative appr

    Aug 1, 2013

  • CIM
    Design of a Slurry Loop for Cuttings Transport Studies in Hard Rock Drilling Applications

    By M. Kamyab

    Transportation of fluid and slurry (fluid and solid particle mixtures) in a pipe and annulus space has been the focus of numerous studies. There are different parameters to be considered when studying

    Aug 1, 2013

  • CIM
    Model Verification of Carbon Dioxide Sequestration in Unminable Coal Seams with Enhanced Coalbed Methane Recovery

    By F. Vasilikou

    Commercial deployment of Carbon Capture Utilization and Storage (CCUS) requires field testing of a scale that can stress the geologic reservoirs. One such reservoir of interest consists of unminable c

    Aug 1, 2013

  • CIM
    Determination of Optimal Aggregate Blending with Linear Programming in Concrete Production

    By D. Adiguzel

    In this research, providing the sustainability of production quality was aimed for a quarry which is located in Istanbul western part of Turkey and producing concrete aggregates with different types o

    Aug 1, 2013

  • CIM
    A Model for Implementing & Continuously Improving the Automated Change Management Process for Construction Mega Projects

    By Sh. Karimidorabati

    In the construction industry, project changes constitute a major cause of delay, disruption, cost increases, poor quality and unsatisfying performance. They are also known as a main factor of litigati

    Aug 1, 2013