Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Reconciliation – Outcomes and ExpectationsBy W J. Shaw
Mining operations must become more predictable to overcome the volatility that has characterised the mining industry. Comparisons of production against predictions will become more consistent as minin
Aug 18, 2014
-
Exploration and Innovation – The Discovery and Evolution of the 2 Moz Vogue Gold Resource, Sunrise Dam Gold Mine, Western AustraliaBy T Blenkinsop, A Jenkins, H Moore, L Fisher, N Oliver, J Cleverley, M Nugus, J McLellan, J Hill, N Brunacci
The 2 Moz Vogue mineral resource is a recent discovery at the Sunrise Dam gold mine (SDGM), lying approximately 600 m vertically below the Sunrise Dam open pit. Unlike most other lodes, which are domi
Aug 18, 2014
-
Determination of Bulk Density in Anglo American plc, Methods and Impacts, with a Case Study from Los Bronces MineBy R M. Arellano, D M. W Harney, M Makhuvha
Mineral resource and ore reserve estimates are founded on two sources of data: tonnage and grade. The tonnage is a product of volume and density; both of which are estimates. Density impacts numerous
Aug 18, 2014
-
Using Ground Penetrating Radar to Enhance the Exploration-to-mining Value ChainBy D Smith, A Ramdhani, J Francke
Ground penetrating radar (GPR), a well-established geophysical technique generally used for shallow civil engineering applications, has, in the last decade, found increasing acceptance as a complement
Aug 18, 2014
-
Automating Communications between Laboratories and Mines – A Case from the Coal IndustryBy S Mundell, J Armstrong, M Evans
"Automation is a common goal within the coal industry for reasons such as efficiency, reliability and sustainability. However, it requires standards and frameworks so business systems can communicate
Aug 18, 2014
-
Managing the Giant – A Mine Geologist’s Perspective to the Mining of the Olympic Dam DepositBy M K. Kapo, S C. Nzama
The success of a mining operation depends on the quality of data used in decision-making processes and the people involved in making operational decisions. At Olympic Dam, mine geologists form an inte
Aug 18, 2014
-
Resources versus Reserves – Towards a Systems-based Understanding of Exploration and Mine Project Development and the Role of the Mining GeologistBy J P. Sykes, A Trench
"World-class mine projects are increasingly failing to become world-class mines. Non-technical, socio-political and environmental problems seem, in part, to be the cause. However, the intangible and q
Aug 18, 2014
-
A Mapping-based Approach to Geological Continuity Prediction Using Examples from the Balmat-Edwards-Pierrepont Zinc District, St Lawrence County, New York, USABy R H. Knight
Uncertainty in prediction and modelling of geological (physical) ore continuity in geometrically complex ore deposits is a key risk factor in mining. Reducing geometric uncertainty of hard-boundary or
Aug 18, 2014
-
Remodelling the Purnama Deposit – An Interpretation Case Study from G-Resources Martabe Project, IndonesiaBy A N. Kusnanto, D Sims, L Henim, S Crispin, J Hertrijana
The high sulfidation Purnama Au-Ag deposit located on the Indonesian island of Sumatra entered production in mid-2012 following a two-year program of construction and development. Discovered in 1997 f
Aug 18, 2014
-
A Cost Benefit Analysis to Explore the Optimal Number of Blast Movement Monitoring LocationsBy J Loeb, D Thornton
Blast movement measurement is a key component of grade control, enabling mines to carry all of the precision involved in locating ore blocks, through a chaotic blast, to production. A monitoring syste
Aug 18, 2014
-
Modelling Blast Movement for Grade Control at an Open Cut Gold MineBy E J. Sellers, A Cocker
Movement of the fragmented rock mass is an inevitable consequence of open cut blasting. Uncontrolled, unaccounted movement from blasting commonly causes ore loss and dilution from waste mixing. Theref
Aug 18, 2014
-
Ore Block Design in Narrow Vein Gold Deposits – Estimate or Simulate?By G D. Matthews, M E. Haylett, S Khosrowshahi, A Weeks
In narrow orebodies the use of ordinary kriging (OK) may pose certain limitations when used for grade control modelling. The smoothing effect of kriging, by its very nature, cannot retain or accuratel
Aug 18, 2014
-
Cook Open Pit Model – The Hurdles: How We Leapt, Lunged, Stumbled and Overcame ThemBy J Paradis, K Dudgeon, M Topping
At Newmont’s Jundee Operation, exploration and resource geologists collaborated to produce an open pit resource model. Using a variety of modelling and estimation techniques but no new data, an unecon
Aug 18, 2014
-
Grade Estimation from Radial Basis Functions – How Does it Compare with Conventional Geostatistical Estimation?By P F. Hodkiewicz, J de Lacey, M Stewart, R Lane
"Implicit modelling is an approach to spatial modelling in which the distribution of a target variable is described by a unique mathematical function that is derived directly from the underlying data
Aug 18, 2014
-
Geologists and the Value Chain – How Material Characterisation by Modern Mineralogy can Optimise Design and Operation of Processing FacilitiesBy K Ehrig, C Lower, V Liebezeit, M Smith, E Macmillan
"Minerals, minerals, minerals. Elements occur in the earth as minerals. If local physical, chemical and structural conditions are conducive to concentrating these minerals to sufficiently high abundan
Aug 18, 2014
-
Matching Brown Coal to the Next Generation of Latrobe Valley ProjectsBy G Love, S Maher
In Victoria’s onshore Gippsland Basin, geology is driving brown coal developments, and geologists are key decision-makers. Prompted by volatile energy prices and the likelihood of a carbon constrained
Aug 18, 2014
-
Universal Reconciliation – A Multidisciplinary Approach across the Entire Mining Value Chain to Identify Loss of Value and Maximise Operational PerformanceBy R Hargreaves, C Morley
The authors often see problems on mine sites that are due to insufficient feedback between technical discipline silos as the realities on the ground fail to inform the models and plans used to drive r
Aug 18, 2014
-
The Superpit Schedule Model – A Time-efficient Data-driven Estimation for Short- and Medium-term PlanningBy T Berryman, C Adams, L Griesel, C Buxton
The Kalgoorlie Consolidated Gold Mines (KCGM) schedule model is used for short- to medium-term planning and scheduling at the Fimiston Open Pit Mine (the Superpit). The model bridges the gap between g
Aug 18, 2014
-
The Evolution of Diamond Drilling Practices at Olympic DamBy J Taylor, A Dubowik
To increase the efficiency and improve the quality of diamond drilling at Olympic Dam, mine geologists have adapted and modified common practices in order to overcome the challenges imposed by such a
Aug 18, 2014
-
Understanding Mineralisation Controls – A Case Study of the Chesney DepositBy J Channell, G Phillips
"The Chesney deposit, located 4 km south-east of Cobar consists of three copper-gold rich shoots that lie within a larger, copper dominant lode. A fourth gold rich shoot is located adjacent to the mai
Aug 18, 2014