Search Documents

Sort by

  • SME
    Kinetics of Nickel Extraction from Indonesian Saprolitic Ore by Citric Acid Leaching Under Atmospheric Pressure

    By K. Sasaki, W. Astuti, N. Okibe, T. Hirajima

    "The kinetics of leaching of a saprolitic ore from Indonesia by citric acid solution under atmospheric pressure was investigated. An examination of the effects of leaching temperature, citric acid con

    Jan 1, 2015

  • CIM
    Advance Data Handling to Support Modeling and Simulations in Mineral Processing Plant Optimization

    By R. Esteban, D. Runnels, J. Torrealba-Vargas, G. Couture

    "Data handling is an important step in the development of a simulator of a mineral processing circuit. The model requires representative data of the scenario to be modeled. The model development invol

    Jan 1, 2015

  • SAIMM
    Large-scale deformation in underground hard-rock mines

    By P. Turcotte, E. Karampinos, F. Mercier-Langevin

    In some underground hard-rock mines, squeezing compressive ground conditions are influenced by the presence of rock foliation and high stress. In these cases, the orientation of the foliation with res

    Jan 1, 2015

  • DFI
    Design and Quality Control of Soil Mix Walls for Earth and Water Retaining Structures

    By Nicolas Denies, Jeroen de Leeuw, Bart Lameire, Jan Maertens, André Vervoort, Flip Hoefsloot, Noël Huybrechts, Flor De Cock

    "In recent years, the Deep Mixing Method has increasingly been applied for the construction of earth and water retaining structures. From practice, it has been experienced that there is a real need to

    Jan 1, 2015

  • SME
    What a Ride; From the Mining Industry to University

    By S. D. Rosenthal

    "This article will share my ‘shift in career direction’ journey from corporate mine engineer, with 31 years of mining various commodities with a wide range of responsibilities in a variety of countrie

    Jan 1, 2015

  • DFI
    Measurements of CDSM Strengths and Seepage Data Following Seismic Upgrades of San Pablo Dam

    By Atta B. Yiadom, A. David Miller, Robert C. Kirby, Sean M. Todaro

    "San Pablo Dam is a 170-foot (52-meter)-high earthfill embankment, located approximately 10 miles (16 kilometers) north of downtown Oakland, California, that impounds a 38,600 acre-feet (47.6 million

    Jan 1, 2015

  • SME
    Magnesium Oxide Suppression during Nickel Flotation

    By R. Casagrande, L. R. Moore, J. Sessoms, P. Macy

    "A South American nickel mine has been producing a nickel concentrate that also contains copper and iron (15 percent nickel, 5 percent copper, 28 percent iron) for the end use of stainless steel produ

    Jan 1, 2015

  • CIM
    Predicting Thermal Conductivities of Rare-Earth Pyrochlores from First-Principles

    By Guoqiang Lan, Jun Song, Bin Ouyang

    Rare-earth pyrochlores, commonly exhibiting anomalously low lattice thermal conductivities, are considered as promising topcoat materials for thermal barrier coatings. However the structural origin un

    Jan 1, 2015

  • DFI
    Laboratory Mixing and Testing for Controlled Waste Disposal Site

    By Tomohiro Yamasaki

    "At the pre-construction foundations of the controlled waste disposal site built at the Port of Kinuura, the clayey soil account for the most, and with lesser amounts of sand compaction piles and sand

    Jan 1, 2015

  • CIM
    Digital Transformation in Metallurgical Facility Design, Construction and Operations

    By D. Ofstie, B. Kargutkar

    BIM, or Building Information Modeling, is transforming the way metallurgical facilities are built, operated and maintained. BIM provides a digital representation of the facility, complete with all phy

    Jan 1, 2015

  • CIM
    Numerical Simulation of the Stress Field in Wushaoling Tunnel

    By Yang Shuxin, Guo Qiliang, He Ping, Lu Lizhi, Yao Rui

    "We combined stepwise regression and constrained regression statistical method to obtain the best boundary conditions for the calculation of in-situ stress field in Wushaoling tunnel using finite elem

    Jan 1, 2015

  • DFI
    On The Use of Cement Content Determination Tests for Deep Mixing Projects

    By Emilie Lapointe, Fernando Famania

    "A reliable determination of the in-placed cement factor, as defined by mass of cement over volume of final element of treated soil, allows the optimization of cement usage to achieve treated soil req

    Jan 1, 2015

  • CIM
    Development of Power Stabilization Systems for Electric Arc Furnaces

    By D. Shen, J. Cheung

    Variable reactance arc control by the SPLC (Smart Predictive Line Controller) has been installed at many different mining sites and steel processing plants around the world. Since its first installati

    Jan 1, 2015

  • CIM
    Enterprise-Wide Optimization in Steelmaking: A Scoping Study

    By J. Worden, D. Hughes, S. Smart, H. Zughbi

    The enterprise wide optimization (EWO) of steelmaking and manufacturing is a multi-level, hierarchical problem which spans higher level corporate planning and scheduling through to the lower level ope

    Jan 1, 2015

  • SME-ICGCM
    Geotechnical Risk Management to Prevent Coal Outburst in Room and Pillar Mining

    By Peter Zhang, Dan Neilans, Scott Peterson, Scott Wade, Joe Pugh, Ryan Mcgrady

    "A coal outburst is a severe safety hazard in room-and-pillar mining under deep cover. It is more likely to occur during pillar retreating. Multi-seam mining dramatically increases the risk of coal ou

    Jan 1, 2015

  • CIM
    Mechanical Behaviour of an Australian Mudstone Subjected to Heating Treatment at High-Temperatures

    By X. F. Liu, O. Buzzi, Y. Sieffert

    This study falls in the context of underground coal fires (UCF) where burning coal can elevate the temperature of a rock mass in excess of thousand degrees. The objective of the research was to experi

    Jan 1, 2015

  • CIM
    Mining and Sustainable Development: Oxymoron or RX for a Bright Future?

    By Krishna Parameswaran

    In this paper, we attempt to answer an often asked question, how can metal mining be compatible with the principles of sustainable development. Starting with the classic Brundtland Commission definiti

    Jan 1, 2015

  • CIM
    Presentation of a Web-Based Database Design for Documentation and Analysis of Rock Properties

    By K. Thuro, H. Käsling, F. Menschik

    "With increasing data volume, due to enhancing requirements for ground investigation programs for large construction projects, the demand for more efficient filing systems is more and more growing. De

    Jan 1, 2015

  • SME
    Integrating Technology: Learning from Mine Worker Perceptions of Proximity Detection Systems

    By E. J. Haas, K. A. Rost

    "This study sought to identify changes in continuous mining machine (CMM) operators’ risk perception and risk behaviors as a result of adding a proximity detection system (PDS) into their environment.

    Jan 1, 2015

  • SAIMM
    Utilization of the Brazilian test for estimating the uniaxial compressive strength and shear strength parameters

    By F. Cihangir, A. Kesimal, K. Karaman, B. Ercikdi

    Uniaxial compressive strength (UCS) and shear strength parameters(cohesion and angle of internal friction, Cand F) of rocks are important parameters needed for various engineering projects such as tun

    Jan 1, 2015