Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimum Management of Truck Tyres in a MineBy S Casas Castellanos
"Tyres consumption is one of the costliest branches of the operation in a truck-based haulage mine. Off-the-road (OTR) tyres working within undesirable conditions have a considerable negative impact o
Nov 15, 2016
-
A 3D Discrete Event Simulation Model of a Truck-shovel Network SystemBy W Zeng, D Walker, D Cai, E Baafi
"The efficiency of the truck-shovel haulage system is significantly influenced by the truck fleet size. A discrete event simulation model with 3D animation has been developed to estimate the productiv
Nov 15, 2016
-
A Case Study on the Assessment, Planning and Extraction of the Crown Pillar at Sunrise Dam Gold MineBy M Brockman, M Cowan, A Robeson
"Sunrise Dam Gold Mine (SDGM) is located 820 km from Perth, 220 km from Kalgoorlie—Boulder and 55 km south of Laverton in Western Australia. The SDGM main pit had successfully operated since 1997 and
Nov 15, 2016
-
Getting Accurate Mine Information to the Right Teams to Drive Production ImprovementBy T Elms, R Beckman, M Sampson
"In today’s mining industry, the pressure of reducing costs and increasing production while maintaining high safety standards is at the forefront of operational endeavours. A combination of specific m
Nov 15, 2016
-
Measuring the Effectiveness of Change through Best Practice ReconciliationBy G Pattenden, R Hargreaves, P Pettit
"Even with the cyclic nature of mining, when it comes down to it, the bottom line is that whatever direction the commodity market is going there is always a desire to improve the economics of an opera
Nov 15, 2016
-
Justifying Slope Design Risks and CostsBy N M. Player, R P. Varden, E Jones
"An effective geotechnical design provides an accurate and appropriate assessment, balanced with a mining company’s risk profile. Justifying the cost of slope assessment requires an understanding of t
Nov 15, 2016
-
In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit ClosureBy D J. Robinson, L L. Kuhar
"Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to
Nov 15, 2016
-
Dragline step change; Safer, greener and lower operating costs are possibleBy R. Adsero
"A high altitude review of the state of the mining industry provided by a study of multifactor productivity shows a continuation of lower output year on year for the capital and labor inputs applied.
Nov 1, 2016
-
Defining hazard from the mine worker’s perspectiveBy C. L. Kosmoski, B. M. Eiter, B. P. Connor
"In the recent past, the mining industry has witnessed a substantial increase in the numbers of fatalities occurring at metal and nonmetal mine sites, but it is unclear why this is occurring. One poss
Nov 1, 2016
-
Using lean six sigma techniques for projects at a Canadian uranium mine, millBy S. G. Britton
"Strategies to improve performance in mining production, maintenance and mineral processing operations have evolved over time from straightforward time studies of individual machine performance in the
Nov 1, 2016
-
KEYNOTE: Using Metallurgical Data to Drive Continuous ImprovementBy R Dunne
"Continuous improvement on metallurgical treatment plants is possible only when good data and analysis of the data are available. Good data implies appropriate and accurate mass measurement coupled wi
Oct 10, 2016
-
Simplified Hybrid Semi-autogenous Grinding Mill Control – Explanation and Practical Results at the Porgera ConcentratorBy E Beltran, S Ngunz, F Orrante, F van Zyl, M Westcott
"The primary control objective of the project is to achieve milling optimisation by ensuring that the energy available for rock breakage is used as efficiently as possible. This is achieved by increas
Oct 10, 2016
-
Metallurgical Performance of Outotec’s e500 TankCell® at the Kevitsa Cu-Ni-PGE ConcentratorBy B Murphy, T Mattsson, R Crosbie, T Maksimainen
"An Outotec e500 TankCell, with 500 m³ of actual flotation volume, was commissioned at the Kevitsa Cu-Ni-PGE concentrator in northern Finland during 2014. This flotation cell was implemented at t
Oct 10, 2016
-
The Simple Facts about Sampling Gold OresBy T Day, I G. Robertson, G J. Lyman
"Various approaches are used in the industry for establishing procedures (sample mass estimation and method of subsampling) for sampling and analysis of gold ores. The key factors that determine the a
Oct 10, 2016
-
Design, Installation, Commissioning and Operation of Fine Grinding Technology at the Kevitsa MineBy B Nielsen, H Lehto, B Musuku
"The demand for fine and ultra-fine grinding associated with the processing of more challenging, finer grained orebodies and the global driver of minimising energy consumption has been an increased fo
Oct 10, 2016
-
Measuring and Utilising Ore Quality Variability Using Real-time On-belt Elemental Analysis to Improve Mill Feed QualityBy H Kurth
"The focus of this paper is on measuring the composition to improve mill feed quality to minimise the processing of waste, optimise process performance, reduce processing costs and minimise the genera
Oct 10, 2016
-
Application of an Integrated Liberation Leach Model for Process OptimisationBy T D. H McGrath, R Byleveld, W P. Staunton, J J. Eksteen
"The Gold Technology Group at Curtin University through the AMIRA P420 series of projects has recently developed the integrated liberation leach model (ILLM) for optimisation of gold plants. The model
Oct 10, 2016
-
Changing Trends in Column Flotation Use – Their Impact for Australian Mill OperatorsBy D Frost, G Harbort, T Lipiec, N Deonarain
"The use of flotation columns has remained a contentious issue among mill operators. There are those who consider them an essential part of any mineral processing operation, while others consider them
Oct 10, 2016
-
Optimisation of Installed Mill Power Post-installation of Secondary Crushing Circuit at Northparkes MinesBy F Kock, Y Sulianto, T Trott, B G. Putland, D Morgan
"Northparkes installed and commissioned a secondary crushing circuit in 2010 to debottleneck the semi-autogenous grinding (SAG) mill constrained grinding circuits. Following further improvements to th
Oct 10, 2016
-
Regular Measurement Defines Upgrades on Scrubber ScreensBy R Wilson, S Luke, R Williams, B Freeburn
"In 2010, two McLanahan RSS14×50 scrubber screens were installed at Fortescue Metals Group’s (Fortescue) Christmas Creek site. By 2015, the trommel (screen) section had effectively reached the e
Oct 10, 2016