Search Documents

Sort by

  • SME
    Risk Analysis for Evaluation of Mine Impounded Water (2a71e596-dab6-4ec7-a3a7-5b02069713dd)

    By M. Gobla

    "Since 1994 the Bureau of Reclamation has used risk analysis to evaluate dams. Risk considers both the likelihood of failure and the expected consequences should failure occur. Risk analysis relies on

    Jan 1, 2017

  • SME
    Zinc and Copper Recovery from Smelter Waste Stream Case Study

    By Songlin Ye, Frank Su

    "Recycling valuable metals from waste streams has become increasingly important to the mining and smelting industry in China due to resource depletion and environmental concerns. Predicated on multipl

    Jan 1, 2017

  • SME
    Investigation on the use of Chemical Dust Suppressants on Ash Emissions Due to Fort McMurray Wildfire

    By W. V. Liu, D. Omane, H. Yu, Y. Pourrahimian

    "A large-scale wildfire had broken out at Fort McMurray in Alberta, Canada during May 2016. Many oil sands mining activities were affected due to the wildfire and the associated ash emissions. In part

    Jan 1, 2017

  • IMMS
    The Role of Bimodal Magmatism and its Products in Volcanogenic Massive Sulfide Ore-Forming Systems: A Case Study from the Middle Okinawa Trough, Japan

    By Toru Yamasaki

    "Bimodal lithostratigrafic assemblages are of significance in volcanogenic massive sulfide (VMS)-hosted lithology. The largest deposits are either bimodal-siliciclastic or maficsiliciclastic, and the

    Jan 1, 2017

  • SAIMM
    Reflections on Narrow-Reef Platinum Mining Pillar Design Systems as Applied to a Large Platinum Exploration Feasibility Project

    By J. N. Van der Merwe

    "Platinum is a highly valuable resource, its safe and economic extraction is paramount. The success of platinum mining by the bord and pillar method depends heavily on a comprehensive and dependable p

    Jan 1, 2017

  • DFI
    Jet Grouting for Echo Dam Seismic Rehabilitation

    By Tara Schenk-McFarland, Mark Bliss

    Echo Dam, located near Coalville, Utah, is a facility that provides storage for irrigation and municipal use. Original construction of the dam was completed in 1931. Because of seismic concerns, the s

    Jan 1, 2017

  • CIM
    Incorporation of Geometallurgical Modelling into Long-Term Production Planning

    By K. Waters, A. Navarra, T. Grammatikopoulos

    Strategic decisions to develop a mineral deposit are subject to geological uncertainty, due to the sparsity of drill core samples. The selection of metallurgical equipment is especially critical, sinc

    Jan 1, 2017

  • SME
    A Field Study of Mineral Scale Buildup on Lined and Traditional PE Water Pipes

    By A. Pezzuto

    "Pipes are used on mine sites in a variety of applications including transport of slurry, conveying clean and processing water, and in mine dewatering. Mine waters and slurries can cause pipe wear and

    Jan 1, 2017

  • DFI
    Collaborative Data Sharing During Seepage Barrier Wall Construction at Bolivar Dam – Perspectives from Owner, Contractor and Sub-Contractor

    By Robert Bachus, Jamey Rosen, Fabio Santillan, Georgette Hlepas

    "A seepage barrier of length 4,800 feet and maximum depth 144 feet is being installed at Bolivar Dam in Ohio. This project is owned by the United States Army Corps of Engineers and contracted to Trevi

    Jan 1, 2017

  • SME
    System Dynamics and Discrete Event Simulation of Copper Smelters

    By A. Navarra, F. Mucciardi, H. Marambio, R. Parra, F. Oyarzún

    "Discrete event simulation (DES) is an appropriate framework for the plant-wide analysis of copper smelters. These smelters apply a common set of chemical reactions: copper-iron sulfides are blasted w

    Jan 1, 2017

  • DFI
    Excavation Support by Deep Soil Mixing- Challenges on Depth and Long Term Exposure

    By D. Barber, A. D. Miller, P. A. Bray

    The project was to develop an area within the existing West County Wastewater Treatment Plant which would enable the construction of a new Raw Wastewater Pump Station (RWPS) with a footprint of approx

    Jan 1, 2017

  • DFI
    Screening Tool for Impact Hammer Selection

    By Gerald Verbeek, David Tara

    "When selecting an impact hammer to drive a particular pile, the decision is often based on local experience. In those cases, the contractor falls back on previous experience or draws on the experienc

    Jan 1, 2017

  • DFI
    Design Mix Specifications of Plastic Concrete for Dam Cut-Off Diaphragm Walls

    By B. Sivarama Sarma, Biswabikash Rout

    "Seepage control has to be achieved with plastic concrete cut-off diaphragm walls in dam structures. Materials selected for construction of cut-off walls must be durable, impermeable and have stiffnes

    Jan 1, 2017

  • SME
    Numerical Modeling of Main and Tail Gate of a Modified Long Wall Mining Operation

    By M. Z. Emad, M. U. Khan

    "Coal mines opting for longwall mining or its variations rely on the main and tail gates for production. Stability of these entries or crosscuts is crucial in coal mining operations. Roof or strata fa

    Jan 1, 2017

  • SME
    Mining Faculty across the Globe: A Snapshot Today Offers a Glimpse into Tomorrow’s Opportunities and Challenges

    By Z. Scopa, E. Tarshizi, R. Setterlind, L. Frost, R. Livernois

    "THE MINES OF THE FUTURE The mines of the future present a host of challenges, which may appear exciting or daunting depending on one’s perspective. Whether some sectors of the public recognize it or

    Jan 1, 2017

  • DFI
    San Francisco International Airport Air Traffic Control Tower Pile Foundations

    By Camilo A. Alvarez, Stephen K. Harris, Brian R. Zuckerman, Philip J. Meymand, Danielle M. Steinmetz

    "The sleek new air traffic control tower at the San Francisco International Airport stands at 221 feet tall and is set to replace the existing air traffic control tower by 2016. This aluminum-clad, to

    Jan 1, 2017

  • DFI
    AUT-CPT & Pile Database for Piling Performance Using CPT and CPTU Records

    By Sara Moshfeghi, Seyyed Majdeddin Mir Mohammad Hosseini, Abolfazl Eslami

    "Due to variety of current pile bearing capacity methods based on the cone penetration test (CPT), for optimum design, it is necessary to evaluate the performance of such methods in different geotechn

    Jan 1, 2017

  • SME
    A New Cast Hard Iron Elevated 250% the Service Life of Centrifugal Pumps in Multiple Wear Applications

    By L. Wilfley, G. A. Calboreanu

    "Wear resistant 25% Cr hard cast iron is a heterogeneous material containing 1,600 HV hard chromium carbides embedded into martensitic matrix. It is the most used cast alloy in wear operations of mini

    Jan 1, 2017

  • SME-ICGCM
    Geotechnical Challenges and Experiences of Working a Deep and Wide Longwall Face: A Case Study of Adriyala Longwall Project, SCCL

    By Gautam Benerjee, Veera Reddy Boothukuri, Bhattacharjee Ram Madhav, Panigrahi Durga Charan

    "India’s tryst with mechanized longwall coal mining started with the introduction of the first self-advancing powered support longwall (PSLW) face at Moonidih Colliery of Jharia Coalfield in 1978 and

    Jan 1, 2017

  • SME
    Adapting to a Cyclical Market – Intrepid Potash’s Carlsbad, NM East Facility Transition

    By B. Berg, J. Stephenson, J. Mansanti, C. Nyikos

    "Intrepid Potash, Inc.’s Carlsbad East facility has refined sylvite and produced muriate of potash (MOP) since 1965. In addition to MOP, Intrepid Potash began recovering the mineral langbeinite from a

    Jan 1, 2017