Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An integrated approach to mine planning – building the integrated planning model at Tropicana gold mineBy M Kent, D Elder, J Woodward, R Edwards, B Catto
At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine
Sep 20, 2017
-
Application of normative ore mineralogy to geological and metallurgical data sets at the Hera Au-Pb-Zn-Ag mine, New South Wales, AustraliaBy A R. McKinnon
The recently opened Hera Au-Pb-Zn-Ag mine in central New South Wales has provided an ideal opportunity to demonstrate the calculation of sulfide ore mineralogy using normative methods. Normative miner
Sep 20, 2017
-
A new approach to logging and modelling faults at the Dugald River Pb-Zn-Ag deposit, North West QueenslandBy K George
The Dugald River lead-zinc-silver deposit is located approximately 60 km north-west of Cloncurry and 87 km north-east of Mount Isa. The development project is expected to turn operational in 2018. The
Sep 20, 2017
-
Minimum sample mass from reverse circulation grade control drilling at Rocklands copper projectBy M G. Hawtin
The Rocklands copper project is a multilode, iron oxide copper gold (IOCG) + cobalt mineralised system located in the Eastern Fold Belt of the Mt Isa Inlier. Rocklands orebodies cover a range of oxida
Sep 20, 2017
-
Steve and Fred would have been mates – a comminution design evolution storyBy D David
Amongst those whose task it is to design tumbling mills and other comminution machines there is an almost religious divide between devotees of the Bond method and devotees of other methods developed i
Sep 11, 2017
-
Critical process design considerations from test work to operationsBy A Dennis, T Hunter, R Coleman
For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin
Sep 11, 2017
-
Fine grinding circuit process improvement at the Karara mine concentratorBy H Ishikawa, H Zhou, M Spagnolo, R Halomoan, S Palaniandy
The Karara Mine concentrator commenced operation in November 2012 to produce high-grade magnetite concentrate. The circuit consists of three stages of comminution plus magnetic separation at each stag
Sep 11, 2017
-
Concentrator design – standard engineering practice versus geometallurgy and simulationBy G Harbort, K Quan
Traditional engineering practice for concentrator design uses a mixture of risk minimisation options and capital minimisation approaches. Often this is based on the preferences and experiences of the
Sep 11, 2017
-
Pressure filtered tailings – environmental and cost benefitsBy R Williams, P Godwin
In a time of changing rainfall patterns and in the light of recent tailings dam failures, there is closer environmental scrutiny for proposed tailings dam construction or expansion. Therefore the elim
Sep 11, 2017
-
Are there differences in size distribution when comparing conventional crushing and HPGR?By I Ritchie, G Lane, C Morley, D Yataco
Marcobre SAC (Marcobre) is developing the Mina Justa project in Peru. The project has a lower grade oxide orebody overlaying the higher grade sulfide orebody. The oxide ore is treated by acid leaching
Sep 11, 2017
-
Technology change by regulation – a cresting wave?By J D. Pease, J M. I Tuppurainen, P D. Munro
This paper examines how legislation and regulation can be external drivers of technical change in mineral processing and extractive metallurgy and how the industry can respond. Two examples are consid
Sep 11, 2017
-
Mill relining optimisation – a story of collaborationBy P Rubie, B Morgan, J Russell, C Stewart
The relationship between efficient liner exchange, concentrator availability and concentrator profitability is well documented. Russell Mineral Equipment’s (RME) relationship with OZ Minerals’ Promine
Sep 11, 2017
-
Metallurgical QA/QC – who needs it? The Olympic Dam experienceBy K Ehrig, V Liebezeit, E Macmillan
The results from metallurgical test programs are used in feasibility studies for design of new plants and brownfield expansions, in long term mine plans, and to make decisions in an operating plant. T
Sep 11, 2017
-
Introducing HPGR quaternary crushers in a Russian magnetite operation – challenges and solutionsBy B C. Povey, K Lagutin, M Mryasov, V Noll
The current Stoilensky magnetite concentrator comprises a three-stage crushing circuit followed by three stages of ball milling, grinding and concentration to produce a magnetite concentrate with 66.5
Sep 11, 2017
-
Implementation of the BIOX® process at the Runruno Gold projectBy J A. van Niekerk, J G. Jardine, J W. Olivier
The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-
Sep 11, 2017
-
Sensor-based ore sorting to maximise profit in a gold operationBy B Nielsen, H Lehto, J Rohleder, C Robben
Sensor-based ore sorting is being increasingly used to reduce the amount of low-grade and waste material processed in mineral concentrators. This type of preconcentration provides bottom-line benefits
Sep 11, 2017
-
Recent improvements in the milling circuit at Tropicana mineBy G R. Ballantyne, B Putland, I Lovatt, M Di Trento
The Tropicana Gold Mine, owned by AngloGold Ashanti Australia Ltd (70% owned and managed) and Independence Group NL (30%) is located 330 kilometres east-northeast of Kalgoorlie, Australia, in the newl
Sep 11, 2017
-
Dense media separation – a valuable process for preconcentrationBy I Grewal, M Lundt
Dense medium separation (DMS) is one of several preconcentration methods used for early waste rejection from run-of-mine ores at relatively coarse particle sizes prior to additional milling and benefi
Sep 11, 2017
-
Assessing bulk sorting suitability at the New Afton mineBy H Kurth, L Balzan
On-belt analysers have been used since the early 1980s in the coal sector to measure ash content in real time for diverting material on conveyors to remove waste, bypass beneficiation and allow suitab
Sep 11, 2017
-
Process development for the Mina Justa projectBy I Ritchie, A Johnston, D Yataco
Marcobre SAC (Marcobre) is developing the Mina Justa copper mine project, located in the Ica region of Peru. The Mina Justa IOCG orebody comprises of a sulfide mass overlain by an oxide cap with a sha
Sep 11, 2017