Search Documents

Sort by

  • AUSIMM
    Getting underground: design and construction of a portal in a pit with moving walls

    By J Player, P Evans, G Sweby

    Achieving quick underground access after the completion of an open pit mine can be critical to maintaining project value and ensuring regular ore feed to the mill. This paper outlines the design and c

    Mar 15, 2021

  • AUSIMM
    Unlocking value in drill and blast at Olympic Dam – Lime 390 case study

    By P Vaikkattil, K Li, J Bullock

    Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout

    Mar 15, 2021

  • AUSIMM
    On the flipside: why cost cutting is out; revenue maximization is in and value is always king

    By H Allday

    The mining industry’s attention has shifted over the last decade with the recovery from the downturn resulting in greater development of innovation and new work methods in a bid to remain competitive

    Mar 15, 2021

  • AUSIMM
    A case study: how being ‘aware of now’ is making work safer at Telfer underground

    By S B. Fitch, S A. Wilson, A J. R Barr, P R. Searle

    Improving the safety culture and performance of any operation is a fundamental goal of every mine operator. Methods of implementing, or changing a culture have developed from the early methods of oper

    Mar 15, 2021

  • AUSIMM
    Reduced Development through improved Rise and Widening Firings using Orica WebGen™ at Ernest Henry Mine

    By J Say, M Hawtin, L Carlon, P Cann

    Historically, production from sublevels of the Ernest Henry Mine (EHM) started from blind uphole rises at the end of slot drives. Where previous investigations considered removing these slot drives an

    Mar 15, 2021

  • AUSIMM
    Collaborative development of mine ready electric vehicle

    By H Guthrie, J Hodder, J Bain, S Durkin

    Australian mines have traditionally relied on diesel powered vehicles to fulfil their light vehicle needs. There are many reasons for the resources industry to review its use of diesel-powered vehicle

    Mar 15, 2021

  • AUSIMM
    Dilution rating system (DRS)

    By C Nyoni, T Nguyen, C R. W Seymour, G D. Dempers

    Unplanned dilution directly adds cost to production from mining, milling, tailings disposal and administration. Additionally, unplanned dilution decreases the productivity, profitability and may affec

    Mar 15, 2021

  • AUSIMM
    Understanding the causes of dilution in narrow vein stopes

    By S Thomas, S Ricketts, R Hassell

    Northern Star Resources (NSR) operates several operations utilising narrow vein stoping operations in the Kundana area. Stope dilution performance is variable across these operations, with unplanned d

    Mar 15, 2021

  • AUSIMM
    Implementation of a management operating system at the Telfer Underground Gold Mine

    By M Franklin, C Puglisi, S Fitch

    Implementation of a well planned and executed Management Operating System (MOS) can result in widespread improvements to operational performance but its success relies heavily on the investment by and

    Mar 15, 2021

  • AUSIMM
    Development and permitting of an underground mine at Cowal Gold Operations

    By J Northfield, L Neesham

    The GRE46 Underground Project lies beneath the environmentally unique and culturally endowed shore of Lake Cowal. The ore body is open both along strike and at depth and is currently defined to a stri

    Mar 15, 2021

  • AUSIMM
    Considerations for the design and support of underground portals

    By M P. Sandy, R M. Stephenson

    Portals to access underground mines are important infrastructure and their design requires careful consideration. Portals are generally expected to last for the life of the mine. Typically, the exposu

    Mar 15, 2021

  • AUSIMM
    Real time LHD dispatch optimisation with ratio targets at Newcrest’s Cadia Valley Operations

    By S N. Donaldson, B L. Hollis, K Wynn, L Potts, M Evans

    A real-time load-haul-dump (LHD) dispatch optimisation tool has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrest’s Cadia Valley Operations. The tool, known as ORB, is the first known success

    Mar 15, 2021

  • AUSIMM
    Challenging the Norms Time Usage Model – Mobile Underground Mining Equipment

    By R Ballantyne, M Adams

    Time Usage Models, used as a basis for calculating performance indicators for mobile mining equipment, have developed from very simple to very sophisticated models. This development has paralleled the

    Mar 15, 2021

  • AUSIMM
    Has there been progress on nano Diesel Particulate Matter in the Australian underground hard rock industry?

    By C W. Davis

    Every diesel engine emits approximately 100 million nano diesel particles (nDP) per cubic centimetre of raw exhaust. Each nDP has a diameter of between 50 and 70 nano metres or 1/100th the size of red

    Mar 15, 2021

  • AUSIMM
    The Nova Operation: mining, technology and a look into the EV future

    By P Ring, B Cooper, C Carr, G Laing

    The Nova Ni-Cu-Co Operation, located in the Fraser Range of Western Australia, commenced commercial production in July 2017 only five years after discovery. Owned by Independence Group NL (IGO), the o

    Mar 15, 2021

  • AUSIMM
    Open stope design; beyond the Stability Graph

    By B McFadyen, Y Potvin, K Woodward

    The Australian Centre for Geomechanics (ACG) held two workshops in 2019—one in Australia and one in Canada—to discuss processes and methods currently used in the mining industry for stope design and r

    Mar 15, 2021

  • SME
    Sustainable Utilization of GCP Sludge as a Reductant in the Reduction Roasting of Low-Grade Manganese Ore to Recover Mn and Fe Values - Mining, Metallurgy & Exploration (2021)

    By Adeyemi Adesina, Subhabrata Mishra, Syed Mohammed Mustakim, Malaya Kumar Jena, Shaswat Kumar Das

    Utilization of low-grade manganese ore adopting the carbothermic reduction roasting process is a proven method to produce high-grade manganese ore. To minimize industrial waste and protect the environ

    Mar 5, 2021

  • SAIMM
    Prediction of rock fragmentation using the Kuznetsov-Cunningham-Ouchterlony model

    By E. K. Mutinda, D. K. Maina, R. M. Kasomo, B. O. Alunda

    Assessment of blast fragment size distribution is critical in mining operations because it is the initial step towards mineral extraction. Different empirical models and techniques are available for p

    Mar 1, 2021

  • SAIMM
    Copper slag as a potential source of critical elements - A case study from Tsumeb, Namibia

    By S. Lohmeier, D. Gallhofer, B. G. Lottermoser, T. Schirmer

    At a time of resource consumption, it is important to study the chemical composition of mining and metallurgical wastes to prevent the dissipative loss of metals and metalloids from the mining value c

    Mar 1, 2021

  • SME
    Selection of Blasting Design Parameters Affecting Peak Particle Velocity—a Case Study - Mining, Metallurgy & Exploration (2021)

    By Piyush Rai, Suresh Kumar Sharma, Punit Paurush

    The present study has been conducted in surface limestone mine to select the controllable blasting design parameters affecting the peak particle velocity (PPV) for assessment of ground vibration. The

    Mar 1, 2021