Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Laboratory Study of Clay Clogging Issues for EPB TBM Tunneling Applications - RETC2021By Jamal Rostami, Wei Hu
Efficient performance of EPB TBMs in clayey ground is primarily dominated by the flow capability of the excavated muck in the cutterhead and screw conveyor. Currently, Consistency Index approach is us
Jun 13, 2021
-
A New Era of Tunneling Planned for Houston—Going Deep to Solve Regional Water Supply, Wastewater, and Drainage Problems - RETC2021By Eric Hansen, Todd Wanless, Chris Mueller, Shannon Dunne, Scott Elmer
Between 2010 and 2018, Houston added more than 1 Million residents; the third largest rate of growth in the nation. With growth, the region faces new challenges with water supply, capacity of its wast
Jun 13, 2021
-
Effect of Muck Transportation System on Overall TBM Performance and Downtimes - RETC2021By J. Rostami, P. P. Nelson, A. Khetwaln
Tunnel boring machines (TBMs) can be considered as the method of choice for tunneling in many projects due to the high level of efficiency and high potential productivity, safety, and applicability in
Jun 13, 2021
-
Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021By David Mast, Irwan Halim, Seung Han Kim
Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,
Jun 13, 2021
-
Back on Track: The Downtown Rail Extension - RETC2021By Meghan M. Murphy, Derek Penrice
The Downtown Rail Extension (DTX) is principal element of the planned second phase of the Transbay Joint Powers Authority’s (TJPA) Transbay Program. When complete, this regionally critical project wil
Jun 13, 2021
-
Pre-Excavation and Early Work Activities for the Long Baseline Neutrino Facility Far Site - RETC2021By Josh Willhite, Seth Pollak, Ben Seling
The Long Baseline Neutrino Facility Far Site at the Sanford Underground Research Facility in Lead, South Dakota will house four large detector tanks located in deep underground caverns. Construction o
Jun 13, 2021
-
Slurry Treatment Plants in Mechanized Tunnelling Operations— Safety, Performance and Cost Factor for Jobsites - RETC2021By Gino Vogt
In mechanized tunnelling operations performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operations
Jun 13, 2021
-
Short Startup for a High Pressure Mixshield Tunnel Boring Machine - RETC2021By Matthew Burdick, Andrew Rule, Erica Bailey
The Second Narrows Water Supply Tunnel, Burrard Inlet Crossing project for the Greater Vancouver Water District entails deep shaft construction, subway sized pressurized face tunneling through highly
Jun 13, 2021
-
Verification and Update on High Pressure Concrete Plug Leakage Remediation - RETC2021By Seung Han Kim, Andrew Yu, Carlos Jaramillo, Chu-Chieh Jay Lin
The Penstock Access Tunnel (PAT) concrete plug is a reinforced concrete plug separating the pressure tunnels from the personnel accessible tunnels and has leaked since the first filling at the Helms P
Jun 13, 2021
-
Mechanical Versus Manual Shotcrete Application in Underground Construction - RETC2021By Lauro Lacerda
Shotcrete is a highly adaptable and widely used underground construction material at infrastructure and mining projects around the world. In fact, many projects could not have been completed without i
Jun 13, 2021
-
Kramer Tunnel—Challenging NATM Tunnelling in Germany’s Alps - RETC2021By Roland Arnold, Richard Gradnik, Martin Zeindl
This paper presents the details of the Kramer tunnel project in the Federal State of Bavaria, Germany. This road tunnel, which has been under construction since December 2019, is the key component of
Jun 13, 2021
-
Potential Pathways forMining Operations to Transition to Renewable Energy—a Case Study - Mining, Metallurgy & Exploration (2021)By Oliver W. Marsden, John O. Marsden
This paper presents the results of a hypothetical case study that evaluates the potential transition of a large copper mining and extraction operation to 90% renewable energy. The case study considers
Jun 4, 2021
-
Automatic closed-loop scheduling in underground mining using discrete event simulationBy F. Sundqvist, B. Skawina, J. Greberg, A. Salama, M. Astrand, P. Ekbeck
Today’s mining operations require fast reporting and rapid rescheduling based on updated information. An automatic mine scheduling system could not only quickly reschedule but also propose alternative
Jun 1, 2021
-
Depositional environment - The original control on gold processingBy J. A. Kinnaird, B. J. Youlton, K. L. Youlton
Methods for treating and processing refractory gold ores are well established. However, what is less well understood is how the formation of the gold-bearing deposits affects gold processing and extra
Jun 1, 2021
-
A Bayesian network approach for geotechnical risk assessment in underground minesBy L. Uotinen, M. Rinne, R. Mishra
Underground mining gives rise to geotechnical hazards. A formal geotechnical risk assessment can help to forecast and mitigate these hazards. Frequentist probability methods can be used when the hazar
Jun 1, 2021
-
Importance and Sensitivity of Variables Defining the Performance of Pre-split Blasting Using Artificial Neural Networks - Mining, Metallurgy & Exploration (2021)By A. K. Raina
Blast induced damage to the final wall of rockmass in any civil or engineering application is a major concern to the rock excavation engineers. There are at least four distinct techniques practised by
May 30, 2021
-
Geotechnical Modeling of Kinross – Round Mountain - Mining, Metallurgy & Exploration (2021)By John Keefner, Charles Kocsis, Kyle A. Scalise
Geotechnical modeling of mines is crucial for understanding the many factors that can pose potential hazards or limit production opportunities. The process of back analyses for modeling is often used,
May 24, 2021
-
Effects of Downwash from a 6-Rotor Unmanned Aerial Vehicle (UAV) on Gas Monitor Concentrations - Mining, Metallurgy & Exploration (2021)By Jacob L. Brinkman, Catherine E. Johnson
Unmanned aerial vehicles (UAVs) are being explored by researchers to measure concentrations of gas emissions in situations where such measurements are otherwise extremely difficult to obtain, such as
May 20, 2021
-
Assessing Longwall Gateroad Ground Response and Support Alternatives - Mining, Metallurgy & Exploration (2021)By Peter Zhang, I. BERK TULU, Morgan M. Sears, Mark Van Dyke, Heather Dougherty, Ted Klemetti, Gabriel S. Esterhuizen
Ground falls in longwall gateroad entries remain a concern in modern longwall operations. The gateroads are subject to changing horizontal and vertical ground stress induced by longwall extraction. Th
May 13, 2021
-
Designing a Geostatistical-Based U-Spatial Statistics Algorithm for the Separation of the Anomaly Area: Application at Baghqloom Porphyry Copper System, Southeastern Iran - Mining, Metallurgy & Exploration (2021)By Omid Asghari, Seyed Reza Ghavami-Riabi, Sajjad Talesh Hosseini
Separation of geochemical anomalies from the background using various methods for identifying areas of higher mineral potential is a critical first step in Greenfield and Brownfield programs. There ar
May 3, 2021