Search Documents

Sort by

  • SME
    Determination Of Stresses In Deep Holes And Around Tunnels By Hydraulic Fracturing

    By B. C. Haimson

    The Committee on Rapid Excavation of the National Research Council has recognized in its 1968 report the need for "improvement of rock-mechanics techniques for measuring subsurface stress field in dee

    Jan 1, 1974

  • CIM
    The Ecstall Story: The Transition from Pit to Underground

    By Peter N. Blakey, Jean-Paul Paquette, Barton A. Thomson

    "FROM THE BEGINNING OF THE PIT, it was known that the surface mining method had a projected life of about ten years, and that the ore extended to depths recoverable only by underground mining. When se

    Jan 1, 1974

  • SME
    An Overview Of New Surface Mining Methods Of Steep Slopes In The Appalachian Region

    By Ben E. Lusk

    First of all let me say what a genuine pleasure it is to be here. Acapulco certainly is a beautiful change. I'm going to spend sometime talking about change, because frankly I'm astounded at

    Jan 1, 1974

  • SME
    Rock Mechanics Applications To The Design Of Oil Shale Pillars ? Introduction

    By Jose F. T. Agapito

    The mining engineer must be able to predict the structural behavior of the rock around underground openings so that he can answer questions relating to safety and economics. With the present status of

    Jan 1, 1974

  • CIM
    The Ecstall Story

    By R. D. Mollison

    "Ecstall Mining Limited was formed to operate the Kidd Creek mine, discovered by Texasgulf Incorporated in 1961 the orebody is geologically very complex, containing rich values of zinc, copper, silver

    Jan 1, 1974

  • NIOSH
    RI 7832 Undulatory Conveyor Tests and Evaluation

    By W. K. Kleysteuber

    This report covers the design and testing of a novel bulk materials conveying device by the Bureau of Mines. The transport concept of the device is to create a traveling wave with a steep front so tha

    Jan 1, 1974

  • NIOSH
    OFR-125-77 High Speed Projectile Impact For Mining And Tunneling--Project Ream ? Section 1 ? Introduction

    By John D. Watson

    The results of extensive field tests of a new and powerful method of hard rock excavation are presented in this report.* The method, known by the acronym REAM (Rapid Excavation and Mining), employs hi

    Jan 1, 1974

  • CIM
    The Ecstall Story; The Geology Department

    By Richard R. Walker, John J. Watkins, Allen C. Amos, Matulich. Angelo

    THE KIDD CREEK MINE is located within the Abitibi greenstone belt, near its west end, in an area known as the Porcupine mining camp (Fig. 5). The Abitibi belt, long known for its many major gold and b

    Jan 1, 1974

  • NIOSH
    OFR-38-76 The Feasibility Of Low Current Fault Detection By Differential Current Measurement ? 1.0 Introduction

    By Robert R. Perron

    The U.S. Bureau of Mines is engaged in many diverse programs for improving mine safety. Of particular interest to the Bureau are new and improved means for minimizing the hazard of fire which can be i

    Jan 1, 1974

  • SME
    Observed Loads And Displacements For A Deep Subway Excavation

    By T. D. Rourke, E. J. Cording, O&apos

    INTRODUCTION Detailed investigation of a 60-ft-deep excavation in a mixed profile of sands and stiff clay was performed by the University of Illinois for the Washington Metropolitan Area Transit Au

    Jan 1, 1974

  • NIOSH
    IC 8632 Basic Estimated Capital Investment And Operating Costs For Underground Bituminous Coal Mines - Mines With Annual Production Of 1.06 To 4.99 Million Tons From A 72-Inch Coalbed

    By Sidney Katell

    This study estimates capital investment, operating costs, and selling prices for four underground bituminous mines producing coal with annual production ranging from 1.06 to 4.99 million tons. It is a

    Jan 1, 1974

  • CIM
    The Ecstall Story: The Administration Department

    By Albert W. Scragg

    "THE ADMINISTRATION DEPARTMENT consists of six sections, all with their own supervisors, reporting to the superintendent of administration. Although each of these sections is uniquely separate, they a

    Jan 1, 1974

  • SAIMM
    Background to the Transvaal Iron Age-new discoveries at Olifantspoort and Broederstroom

    By R. J. Mason

    Background to the Transvaal Iron Age-new discoveries at Olifantspoort and Broederstroom R. J. MASON*, Ph.D. (Visitor) The work being done on Iron Age sites in the Transvaal is described, with particul

    Jan 1, 1974

  • NIOSH
    IC 8641 Basic Estimated Capital Investment And Operating Costs For Underground Bituminous Coal Mines - Mines With Annual Production Of 1.03 To 3.09 Million Tons From A 48-Inch Coalbed

    By Sidney Katell

    This Bureau of Mines study estimates capital investment, operating costs, and selling prices for three underground bituminous mines producing coal with annual production ranging from 1.03 to 3.09 mill

    Jan 1, 1974

  • NIOSH
    Part Three - Estimates Of Miner Location Accuracy: Error Analysis In Seismic Location Procedures For Trapped Miners - I. Summary

    By David C. Peters, Robert S. Crosson

    A method of error analysis has been applied to the location technique of non-linear least squares iterative inversion in order to evaluate the resolving power of several seismic array configurations w

    Jan 1, 1974

  • NIOSH
    Part Two - Detection Range And Arrival Time Estimates - I. Summary

    By Roy Greenfield

    Estimates are given for the distance from a seismometer at which a miner can probably be detected. The procedure in making these estimates was to first establish the natural noise levels at the output

    Jan 1, 1974

  • SME
    Influence Of Geology On Pit And Quarry Reuse Planning

    By Kenneth L. Schellie

    In preplanning the reclamation of a pit or quarry the geology of the site is the name of the game! The planner must know the parameters of the deposit, the quantity and kind of earth materials to be r

    Jan 1, 1974

  • NIOSH
    Computer Requirements

    By C. B. Manula, R. L. Sanford, R. A. Rivell

    The need for a large capacity, high speed computer is more apparent in the revised model than in the original one. Core storage requirements for data and model logic have at least tripled. This dictat

    Jan 1, 1974

  • AUSIMM
    The Greenvale Mine and Railway

    Development of the Greenvale orebody, containing 40,000,000 tonnes of nickel ore, began in 1971 and production commenced in 1974. Annual capacity is 2,800,000 wet tonnes. The variations in ore grade

    Jan 1, 1974

  • SME
    Mineral Processing Chemicals Operational Mechanisms And Evnironmental Effects

    By George F. McIntyre

    The subject of this paper is mineral processing chemicals - how they work and where they end up environmentally. First of all, it is necessary to recognize that water is the most universally and widel

    Jan 1, 1974