Search Documents

Sort by

  • CIM
    German Experience in Hydraulic Coal Mining and its Application to Canadian Conditions

    By H. Harzer

    Statistics Canada record s indicate that in recent years 70 to 80% of the entire Canadian coal production originated from Western Canadian mines, in which about 55 to 65% of the coals are bituminous.

    Jan 1, 1978

  • CIM
    The Geology of the Cluff Lake Uranium Deposits

    By Charles T. Harper

    The uranium deposits discovered by Amok (Canada) Ltd. in the Cluff Lake area of north western Saskatchewan occur at or near the southern edge of the uplifted basement core of the Carswell circular str

    Jan 1, 1978

  • CIM
    Surface Reclamation Situations and Practices On Coal Exploration and Surface Mine Sites At Sparwood, B.C.

    By Roger J. Berdusco

    Kaiser Resources Ltd. owns and operates a 5-million-tonper- year open-pit and hydraulic coal mine near Sparwood in southeastern British Columbia. Since 1969, Kaiser has maintained a field-scale reclam

    Jan 1, 1978

  • NIOSH
    OFR-106-79 Quick-Fix Blowout Stopping Field Evaluation

    By Mackenzie Burnett

    Quick-Fix Blowout Stoppings were evaluated in several underground mines as an alternative to conventional ventilation control bulkheads. Blowout stoppings offer considerable savings in bulkhead constr

    Jan 1, 1978

  • CIM
    Project Environmental Approval

    By B. R. Boardman

    Project Environmental Approval is a multi-faceted issue. From a mining perspective, it is a costly item because of avoidable time delay. The government perspective is that the approvals are a necessar

    Jan 1, 1978

  • NIOSH
    RI 8312 Selenium Removal From Acidic Waste Water Using Zinc Reduction and Lime Neutralization

    By W. N. Marchant

    The Bureau of Mines improved removal of selenium from zinc smelter acidic gas scrubber effluent by using zinc dust to precipitate soluble selenium prior to lime neutralization. Lime neutralization alo

    Jan 1, 1978

  • NIOSH
    RI 8267 Methane Accumulations in Coal Mine Roof Cavities (d7390f1b-b406-43c9-ac62-7576fb9700c9)

    By Robert P. Vinson, Kissell. Fred N., Edward D. Thimons

    "The Bureau of Mines investigated the presence and extent of methane accumulations in mine roof cavities using a full-scale mine model. Methane was released at a constant rate into the roof of a cavit

    Jan 1, 1978

  • AIME
    Cities Service Company - Pinto Valley Project - Miami, Arizona

    The Pinto Valley, Arizona, plant of Cities Service Company is one of the newest copper producers in the United States, having started production in 1975. It is located a few miles west of Miami, Arizo

    Jan 1, 1978

  • CIM
    The Sherritt-Cominco Copper Process ? PART II: Pilot-Plant Operation

    By P. Kawulka

    An integrated pilot plant for the development of the S-C Copper Process was constructed at Fort Saskatchewan in 1975 and operated in 1976. The pilot plant was designed to treat 9 tonnes per day of a p

    Jan 1, 1978

  • SME
    A Process That Uses Sulfur From A Copper Concentrate To Reduce Leached Copper

    By R. H. Bartlett

    Hydrometallurgical processes for copper flotation concentrates avoid the S02 emission problems associated with smelting, but they require oxidation of copper to obtain solubilization during leaching.

    Jan 1, 1978

  • NIOSH
    RI 8300r A Flexible Helical Rock Bolt

    By Clarence O. Babcock

    This report describes the results of Bureau of Mines laboratory and preliminary field tests on a rock bolt of helical shape. The flexible construction allows the bolt to maintain a more stable load le

    Jan 1, 1978

  • CIM
    Diagnostic Studies of Lubricants

    By E. Goodwin

    The mechanics of formation of wear-metal suspensions in lubricants is discussed, along with the relationship of the concentration of the metals and other particles to the wear of lubricated machinery

    Jan 1, 1978

  • CIM
    Diesel Emissions and Mine Ventilation

    By D. B. Stewart

    In the past few years, much effort has been spent in elucidating the impact of diesel engines on the mine environment. This paper summarizes diesel fundamentals , exhaust emissions and typical tailpip

    Jan 1, 1978

  • CIM
    Room-and-Pillar Mining at Devco?s Prince Mine

    By A. R. MacLean

    This mine is situated at Point Aconi, Cape Breton , Nova Scotia, and is a replacement for the 100-year-old Princess Collie ry. It is a slope mine which is the continuation of a s trip mine operation.

    Jan 1, 1978

  • AUSIMM
    Hydraulic Rock Drills in Production and Development

    The paper covers the history and develop- ment of electrical and diesel-powered hydrau- lic percussion rock drills. It examines main design aspects and problems encountered in pro- ducing an efficien

    Jan 1, 1978

  • NIOSH
    OFR-48-80 Field Test Of Chemical Injection For Stabilizing Coal Mine Roof

    By H. W. Brandt

    A field test was designed to inject a specially formulated two compound epoxy resin into the roof rock ahead of a working face to cement fractures and formation interfaces at the Westmoreland Coal Co.

    Jan 1, 1978

  • CIM
    Prospection Alluvionnaire (Minéraux Lourds)en Gaspésie- Traitement des Donnés et Comparaison Avecles Résultats Géochimiques en Sédiments de Ruisseau

    By Robert L. Tremblay

    Dans le but de voir si une région comme la Gaspésie, qui a subi la derniere glaciation , se prête avantageusement à la méthode de prospection alluvionnaire, environ 800 concentrés de minéraux lourds f

    Jan 1, 1978

  • CIM
    Mineral Waste Resources of Canada

    By R. K. Collings

    The annual production of mineral and mineral-based wastes in Canada is conservatively estimated to be 400 million tons. Over 90 per cent of this amount is waste rock or mill tailings from the mining a

    Jan 1, 1978

  • SME
    An Industrial Coal-Fired Fluidized Bed Combustion System Using Dolomite Limestone For Sulfur Emission Control

    By J. Leonard Frame

    A coal-fired fluidized bed combustion (FBC) system will be installed at the Owatonna Tool Company, Owatonna, Minnesota. Two FBC combustors will burn solid fuels: coal, petroleum coke, and wood and pap

    Jan 1, 1978

  • NIOSH
    IC 8773 Economic Evaluation Of A Leach-Electrolysis Process For Recovering Lead From Galena Concentrate

    By Thomas A. Phillips

    The Bureau of Mines presents an economic evaluation of its leach- electrolysis process for recovering lead from galena concentrate. In this process, galena concentrate is leached at 200° F with a ferr

    Jan 1, 1978