Search Documents

Sort by

  • SME
    Repair of a Failed Reinforced Concrete Adit Tunnel with Carbon Fiber Wrap - NAT2024

    By Daniel Willis, Ryan O’Connell

    An 8-foot tall horseshoe adit tunnel located within an abutment of the Mount Morris Dam in Mount Morris, NY required repair of a failed reinforced concrete liner. The adit tunnel is entirely founded w

    Jun 23, 2024

  • DFI
    Repair Of Deep Foundations - Summary

    By Dennis W. Boehm

    The building boom of the late 1970's and early 1980's has all but used up most of the better sites across the more populated metropolitan areas of the United States. This means that current

    Jan 1, 1999

  • AUSIMM
    Replacement of Pulverised Coal Injection (PCI) with hydrogen and its impact on blast furnace internal conditions

    By S Mitra, D O’Dea, N Barrett, T Honeyands, P Zulli

    The steel industry continues to explore and demonstrate technologies that decrease its greenhouse gas emissions, especially in blast furnace ironmaking where alternate operating conditions will be req

    Nov 8, 2021

  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • IMPC
    Replacing Petrov's Process with Atmospheric Flotation Using PB-BHA Complexes for Separating Scheelite from Fluorite

    By Wei Sun, Ruolin Wang, Jianjun Wang, Xiaodong Li, Honghu Tang, Yuehua Hu, Anh V. Nguyen, Haisheng Han, Kefeng Chen, Zhao Wei

    It is difficult to separate scheelite especially from fluorite with fatty acid collectors because the adsorption mechanism of these collectors occurs through chemisorption of the oleate ion onto the m

    Jan 1, 2018

  • DFI
    Replacing Top Layer Of Soft Clay With Compacted Engineering Fill To Improve The Lateral Capacity Of Piles

    By Venugopal Bonani, Kumaran M., Thomas John

    Liquid storage tanks are usually located in nearshore or coastal regions with soil profiles containing thick layers of compressible soils. These storage tanks are usually of large diameter up to 90m a

    Sep 1, 2022

  • AUSIMM
    Reply to Contributed Discussion (this issue) by John Shepher and L. Keith Rixon

    By ALAN J. HARGRAVES

    It is normal that Shepherd and Rixon, in their contributed discussion (this issue) see differences with Hargraves (1983), as it exemplifies the present uncertain situation worldwide, a situation expec

    Jan 1, 1983

  • AIME
    Report Of Committee On Uniform Mining Laws For Prevention Of Mine Accidents.

    By AIME AIME

    TO THE AMERICAN MINING CONGRESS. AMERICAN INSTITUTE OE MINING ENGINEERS. MINING AND METALLURGICAL SOCIETY OF AMERICA. The committee that makes this report was appointed at the meeting of the Americ

    Jan 10, 1910

  • DFI
    Report On An Instrumented Continuous Flight Auger Test Pile At Ascot.

    By Peter O. Wilkinson

    Ascot Racecourse in the UK is a major international venue for horseracing. The racecourse is being redeveloped to provide entirely new public facilities. The development includes the construction of a

    Jan 1, 2006

  • SME
    Report On Early Strength Performance Of Modern Day Weak Rock Mass Shotcrete Mixes

    By C. C. Clark

    The National Institute for Occupational Safety and Health (NIOSH), Ground Control Engineering Branch is investigating the use of shotcrete in weak rock mass mines with the objective of reducing fatali

    Jan 1, 2010

  • NIOSH
    Report Submitted To The Trail Smelter Arbitral Tribunal - Part I. - Operational Features Of Trail Smelter - Introduction - Instructions Given By Tribunal

    By R. S. Dean

    As set forth in the decision of the Trail Smelter Arbitral Tribunal, dated April 16, 1938 This Tribunal is constituted under and its powers are derived from and limited by the convention between the

    Jan 1, 1944

  • AIME
    Reports of the Annual Meeting, A.I.M.E.

    By AIME AIME

    QUALITY and size do not ordinarily go hand in hand, but there is good evidence that both these attributes reached a new peak at the Annual Meeting of the Institute in New York just concluded. Certainl

    Jan 1, 1940

  • CIM
    Reprocessing of a French Guyana Operation Tailings Using Flotation for Gold Concentration

    By P. Botane, A. Cailleau

    "Compagnie Miniere Esperance operates a gold primary ore body. The ore is processed through crushing, grinding and gravity concentration generating tailings with remaining fine gold. Analyses of the t

    Jan 1, 2009

  • SME
    Reprocessing Of A French Guyana Operation Tailings Using Flotation For Gold Concentration - Introduction - Preprint 09-062

    Compagnie Miniere Esperance (CME), a mining company based in French Guyana, operates a gold primary ore body in open pit. The ore is processed through crushing, grinding and gravity separation. Tailin

    Jan 1, 2009

  • SME
    Reprocessing Of A French Guyana Operation?s Tailings Using Flotation For Gold Concentration

    Compagnie Minière Espérance mines a primary gold orebody in an openpit. The ore is processed through crushing, primary gravity concentration, grinding and secondary gravity separation, generating tail

    Jan 1, 2010

  • CIM
    Reprocessing Of Historic Tailings from the Aunor Mine in Timmins

    By M. A. Tomlinson, A. Di Feo, T. C. Cheng

    "Goldcorp is evaluating the potential for economic reprocessing of historic tailings at several sites, including the Aunor A facility located in Timmins. The overall project is investigating the abili

    Jan 1, 2019

  • SAIMM
    Reprocessing of low grade Cu-Co-Au containing tailings by froth flotation - a case study, I. Silin, Y. Rubinstein, I. Volobayev, A. Liono, D. Gürsel, and H. Wotruba

    By I. Silin, H. Wotruba, A. Liono, I. Volobayev, Y. Rubinstein, D. Gürsel

    Old, abandoned or in situ processed and storaged tailings can be a potential source of remained valuable metals and minerals. By reprocessing of tailings, it is possible not only to achieve economical

    Jan 1, 2020

  • AIME
    Republic Steel's Operations at Port Henry, Mineville, and Fisher Hill

    By Linney, Robert J.

    REPUBLIC Steel Corporation's iron-ore properties in the Adirondacks consist of mines, mills, and sintering plants in the Mineville and Port Henry area and at Lyon Mountain. This article will deal

    Jan 1, 1943

  • AUSIMM
    Required Cooling System Capacities for Extended Longwall Panels at a Bowen Basin Mine

    By M S. Kizil, T OÆConnor

    It is predicted that underground coal mines in the Bowen Basin will have a significant rise in heat problems as mines aim to increase production, depth of extraction and length of longwall panels. At

    Jul 1, 2013

  • SME
    Requirement of Airflow Reversal with Respect to the Proposed Nuclear Waste Repository in Basalt

    By Daniel J. Brunner

    The U. S. Department of Energy (D.O.E.) requires that the prospective nuclear waste repository in Basalt at Hanford, Washington, comply with State of California mine and tunnel safety orders. These re

    Jan 1, 1988