Search Documents

Sort by

  • AIME
    Redesign And Construction Of A Tailings Dam To Resist Earthquakes

    By C. O. Brawner

    INTRODUCTION Tailings dams up to about 200 ft. high are proposed to store tailings for a major mining operation on Marinduque Island in the Philippines. The original design of the dam utilized a c

    Jan 1, 1972

  • TMS
    Redesign and Rebuild of the Pan Pacific Copper Flash Smelting Furnace

    By Glenn Stevens

    After 40 years of operation with the original design, Pan Pacific Copper determined it was necessary to rebuild the Saganoseki Flash Smelting Furnace to continue safe operation. The original design em

  • SME
    Redesign Aspects Of Lignite Mine Reclamation: A Case Study In Greece

    By M. Menegaki

    Restoration of abandoned mine sites is still one of the weak points of mining practice. The latter stands especially for the case of the surface coal and lignite exploitations, where the extended size

    Jan 1, 2005

  • CIM
    Redesign of Furnace No. 1 at the Pobuzhsky Ferronickel Combine

    By N. Novikov, M. Jastrzebski, N. Kryzhanovskaya, D. Shevchenko, I. Kapran, N. V. Novikov, T. Koehler, B. Zaporozhets

    "The PFK FeNi Smelter was re-commissioned by Solway Resources in 2002, ending a long period of economic decline in the adjacent town. In 2009 Hatch was retained to design, supply and install a custom

    Jan 1, 2012

  • AUSIMM
    Redevelopment at Northparkes Following Significant Drive Closure

    By J Samosir, L A. Snyman

    Northparkes is located 27 km north of the township of Parkes in central New South Wales, Australia. The operations consist of underground block cave mines and an ore processing plant that produces hig

    Nov 5, 2014

  • AUSIMM
    Redevelopment of the Morning Star Gold Mine - ABSTRACT ONLY

    Morning Star Gold aims to enter the ranks of Australia's gold producers, revitalising the Eastern Victorian Goldfi elds in the second half of 2010 - the fi rst gold production in around 50 years

    Aug 1, 2010

  • TMS
    Redoubling Platinum Group Metal Smelting Intensity - Operational Challenges And Solutions

    By Rodney Hundermark, July Ndlovu, Lloyd Nelson, Phillimon Mukumbe, Paul van Manen, Whitey Seyanund, Bart Pieterse, Bertus de Villiers, Diale Mokwena

    The 2003 redoubling in power to 68MW on the Polokwane Smelter furnace represented a significant intensification in platinum group metal (PGM) smelting. Combined with onerous ‘green’ PGM concentrate s

    Jan 1, 2014

  • IMPC
    Redox Potential Dependence of Chalcopyrite Leaching (efe1695f-0ff5-4a1f-83c2-d23dbd863027)

    By Naoki Hiroyoshi, Hajime Miki, Tsuyoshi Hirajima, Masami Tsunekawa

    Acidic solutions for chalcopyrite leaching contain cupric, ferrous and ferric ions, and the oxidizing power of the solutions is indicated by a redox potential, determined by the concentration ratio of

    Jan 1, 2003

  • CIM
    Redox Potential Measurement during Pressure Oxidation (POX) of a Refractory Gold Ore

    By V. G. Papangelakis, I. Guzman, S. J. Thorpe

    Pressure oxidation (POX) leaching has been commercially applied to refractory gold ores since the 1980s. In the process, sulphide material is oxidized and dissolved in order to release the gold encaps

    Jan 1, 2017

  • IIMP
    Reducción del consumo de energía en los procesos minerometalúrgicos: ¿cuestión de cultura o de apertura a las mejoras?

    By Renan Barrio de Mendoza

    "El presente texto señala la aplicación de nuevas tecnologías conceptos para reducir u optimizar el consumo de energía, como los costos de operación en los procesos metalúrgicos. Así, el uso eficiente

    Jul 1, 2015

  • SME
    Reduce Urban Tunnel Utility Relocation Risk through Early Relocation by Specialty Contractor

    By Justin Carl, Aliuddin Mohammad, Gordon Evans, Steven Bealby, Carlton Ray

    "The District of Columbia Water and Sewer Authority (DC Water) is implementing the $2.2-billion DC Clean Rivers Project (DCCR) to control combined sewer overflows (CSO) to the Anacostia and Potomac ri

    Jan 9, 2017

  • SME
    Reduced Coal Fines In Blasting (a7406117-2c42-446a-826d-922e873557e8)

    Explosives are used to mine coal. Any blast results in three size categories of products, namely over-, middle-, and under-size. Boulders can still be broken smaller in further operations after blasti

    Jan 1, 1996

  • AUSIMM
    Reduced Development through improved Rise and Widening Firings using Orica WebGen™ at Ernest Henry Mine

    By J Say, M Hawtin, L Carlon, P Cann

    Historically, production from sublevels of the Ernest Henry Mine (EHM) started from blind uphole rises at the end of slot drives. Where previous investigations considered removing these slot drives an

    Mar 15, 2021

  • CIM
    Reduced Energy Consumption at Kidd Creek through Pressure Filtration Technology

    By S. Pinard, J. MacLellan, G. Ehlert

    "The Kidd Creek concentrator is looking actively for alternative technology as means of reducing operating costs in their concentrate handling section. The use of pressure and vacuum filters to elimin

    Jan 1, 1992

  • ISEE
    Reducing a Quarry Global Carbon Footprint through Blast Optimization

    By Pierre DePasquale, Ricardo Chavez

    Lowering of quarry energy consumption participates to answer both environmental and financial issues. The “EE-Quarry” European project, supported by the European Commission (EE stands for Energy Effic

    Jan 1, 2015

  • AUSIMM
    Reducing Bench Turnover Time and Improving Shovel Digability

    By D Kavanagh, C Michaud

    "A continuous improvement initiative was identified at Kalgoorlie Consolidated Gold Mine’s (KCGM) Fimiston open pit with the goal of reducing bench turnover time and increasing shovel digability by im

    Nov 15, 2016

  • ISEE
    Reducing Blast Vibration Amplitudes Close-In to Structures of Sub-Standard Construction

    By Enrique Munaretti, Cathy Aimone-Martin, Vitor Rosenhaim, Jair Koppe

    Production blasts at one of Copelmi’s coal mine operations will be carried out 100 m (330 ft) from a neighborhood located in the town of Butiá, southern Brazil. Mine management is concerned about the

    Jan 1, 2013

  • SME
    Reducing Bolter Operator Exposure To Hazards (10250071-d245-48e5-87ea-cabe71bcc3da)

    By M. J. Klishis

    This paper presents the findings of a study on roof bolters' hazard exposure. A "micro-analysis" of accident data was combined with ergonomic observations of roof bolter operators to categorize b

    Jan 1, 1995

  • ISEE
    Reducing Coal Damage And Loss With A New Blasting Technology

    By Tapan Goswami, Lloyd Hain, Geoff Brent

    For many years Ramp 24 at Ensham mine in Queensland, Australia has suffered substantial coal loss and damage due to the fragile nature of the coal and problematic geological conditions, which have pro

    Jan 1, 2008

  • DFI
    Reducing Construction Interference when Implementing Geotechnical Instrumentation and Monitoring in Urban Excavation Projects

    By Martin B. Hudson, Daniel Brescia, Zhangwei Ning

    Due to the complexity and sensitivity of surrounding environments, instrumentation and monitoring (I&M) is critical for many urban deep excavations. The objects to be monitored include shoring bulkhea

    Jan 1, 2018