Search Documents

Sort by

  • SME
    Proactive Safety Practices At S&B Industrial Minerals S.A.

    By M. Stefanakis

    Respect for the people is one of the main values of S&B. Such respect needs to be manifested by actions ensuring the bodily and spiritual integrity of personnel in pursuing their work. The ultimate ta

    Jan 1, 2007

  • AUSIMM
    Proactive Strata Control Management at Anglo American Metallurgical Coal Australian Open Cut Operations

    Anglo American Metallurgical Coal (AAMC) manages five open cut coal mines in Queensland and New South Wales, producing approximately 30 million tonnes per annum. The size and complexity of these mines

    Nov 25, 2010

  • ISEE
    Proactive Waste Minimization Initiatives for Energetic Waste Sites

    By T Barnes, K D. Sexton, T J. Tope

    For the past decade, the U.S. Department of Defense (DoD) has been under increasing pressure from state and federal regulatory authorities to develop management strategies for waste streams generated

    Jan 1, 1997

  • SME
    Proactively Improving Fluid Power Safety

    By T. R. Ley

    "INTRODUCTION Brutally honest mining executives will tell you that “safety is job #1 but.. dollars are also extremely important”. When economic times are tough, as they are now in mining, it can feel

    Jan 1, 2016

  • IIMP
    Probabilistic design of mine-site ponds using a dynamic water management model

    By James R. Kunkel

    Water management at a mine site is a critical component for the design of ponds for mine facility operation and mine facility closure. A comparison of pond sizes designed using both a probabilistic an

    Sep 14, 2009

  • SME
    Probabilistic Ecological Risk Assessment (ERA) Incorporating Geochemical Speciation to Determine Bioavailable Metals in Freshwaters Affected by Acid Rock Drainage (ARD).

    By J. Twining, V. Nguyen, J. Perera

    A computer code for ecological risk assessment (ERA), AQUARISK, has been developed and applied to evaluate the likelihood of biotic detriment due to exposure to acid rock drainage (ARD) from the Burku

    Jan 1, 2000

  • IOM3
    Probabilistic key-block analysis for support design and effects of mining-induced stress on key-block stability: a case study

    By R. Trueman, D. B. Tyler

    Numerical modelling was used to determine the magnitude and direction of stresses around drives both adjacent to and distant from open stopes in the South Crofty tin mine. Modelling predicted that dri

    Jan 4, 1993

  • SME
    Probabilistic Quantification Of Uncertainty In Predicting Mine Pit-Lake Water Quality (8bb3ab18-1516-4bf4-9057-f861e8ded8f0)

    By J. H. Kempton

    The scrutiny given to model predictions of pit-lake water quality has focused attention on the uncertainty associated with long-term predictions. Although comparison of probabilistic predictive modeli

    Jan 1, 1998

  • AUSIMM
    Probabilistic Slope Design and its Use in Iron Ore Pit Optimisations

    The current economic climate and demand for iron ore has resulted in mine operators being prepared to accept aggressive slope designs and associated failures provided that they can be quantified (ie v

    Jan 1, 2009

  • DFI
    Probabilistic Subsurface Characterization for Transmission Line Foundation Design

    By Neil T. Russo, Peter M. Kandaris, Jogi S. Gadok

    "Assessment of subsurface data for foundation design in support of long high voltage electric transmission lines is best accomplished using a probabilistic strategy since only a small portion of struc

    Jan 1, 2017

  • NIOSH
    Probability of Making A Successful Mine Escape While Wearing A Self-Contained Self-Rescuer

    By John G. Kovac

    A computer simulation has been developed to estimate the chances of a miner making a successful escape while wearing a SCSR. The model takes into account: (1) training in the use of SCSRs, (2) apparat

    Jan 1, 2009

  • CIM
    Probing the Oxidation of Carbon Monoxide Utilizing Aun

    By Michele L. Kimble

    A fast-flow reactor mass spectrometer has been utilized to investigate the reactions of gas-phase gold cluster anions with CO and oxygen. Addition of CO to Aun - produces species of the form Au(CO)m -

    Oct 1, 2003

  • AUSIMM
    Problem roadways in an underground decline solved through the application of Roller Compacted Concrete (RCC)

    By D Bruce, D Cox

    The main access decline at Carrapateena mine was excavated through two different underground aquifers. In these areas of decline, pressurised water finds the path of least resistance through the rock

    Mar 15, 2021

  • ABM
    Problema Das Multiplas Mochilas Com Conflito De Itens Aplicado Na Formação De Cargas Em Forno De Recozimento Em Caixa

    By Vitor Tomaz de Aquino, Moysés Dutra da Silva, Weslley Luiz da Silva Assis, Rafael Masulck Santos, Tiago Araújo Neves

    Neste trabalho é abordado o problema das múltiplas mochilas para modelar a necessidade industrial metalúrgica de alocação de bobinas de aço em um forno de recozimento em caixa. Condições especiais de

    Oct 1, 2019

  • CIM
    Problems and Developments in Rail Movements from Source to Dock

    By J. M. Livingstone

    "This paper covers some of the problems confronted by Canada's railways in moving bulk materials from their source to the dock-site. The ""cost center"" concept is presented, and hypothetical examples

    Jan 1, 1968

  • SME
    Problems And Options In Relation To Abandoned Mine Sites (Asturias, Spain)

    By J. Loredo

    Asturias, in Northwestern Spain, has an extensive mining history. As a result of these historical mine activities where operations have been usually developed with little control on effluents or emiss

    Jan 1, 2003

  • DFI
    Problems Encountered For Deep Caissons For The Second Bassein Creek Bridge At Mumbai, India

    By Deepak B. Deshpande

    This paper enumerates various difficulties encountered in the design and construction of deep caisson foundations for the Second Bassein Creek Bridge constructed over a creek with very difficult site

    Jan 1, 2002

  • Problems in Designing Stable Open-Pit Mine Slopes

    The general significance and possible effects of the ~ttit ud e of rock joints and faults, groundwater, overblastmg, and the geometry and character of stresses created by previous mining, gravity or t

    Jan 1, 1964

  • AIME
    Problems In Mechanization In Primitive Countries

    By James V. Thompson

    ENGINEERS from industrialized countries are frequently called upon to examine mining operations in primitive areas and make recommendations regarding mechanization and modernization. They often set fo

    Jan 8, 1958

  • DFI
    Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing Structure

    By L. F. Albert

    The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory

    Jan 1, 1989