Search Documents

Sort by

  • AUSIMM
    Optimum embankment design for a tailings dam

    By A Fyans, B Ghahreman-Nejad

    This paper discusses the method and results of an options study into selection of the optimal form for a 130 m high tailings/water retaining dam, located in a region of high seismicity in central Iran

    Jul 23, 2018

  • AUSIMM
    Optimum Management of Truck Tyres in a Mine

    By S Casas Castellanos

    "Tyres consumption is one of the costliest branches of the operation in a truck-based haulage mine. Off-the-road (OTR) tyres working within undesirable conditions have a considerable negative impact o

    Nov 15, 2016

  • AIME
    Optimum Mining Plan For Multiple Seam Mining

    By Wen H. Su

    Multiple seam mining and its associated problems are very serious in Southern West Virginia where poor planning or lack of knowledge in seam interaction often results in complete loss of coal properti

    Jan 1, 1984

  • TMS
    Optimum Operating Conditions and Characterisation of Lignin Extracted from Palm Fruit Bunch

    By M. A. Usman, E. I. Akpan, S. O. Adeosun

    Preliminary studies on the extraction and characterisation of biodegradable lignin from palm oil fruitbunch (POFB) for carbon fibre production has been conducted. Centra lComposite Design was used to

    Mar 1, 2017

  • CIM
    Optimum Planning for Multi-Project Earthmoving Operations

    By S. Abu-Samra

    By virtue of its complex nature, the construction industry comprises a wide spectrum of interrelated variables and factors. This multifaceted character of the construction industry puts the use of eng

    Aug 1, 2013

  • SME
    Optimum Production Rate For High-Grade/Low-Tonnage Mines ? Introduction

    By Ross Glanville

    The Optimum Production Rate (OPR) is one of the most important parameters in the evaluation of a mineral deposit. The OPR cam also be expressed as the Optimum Mime Life (OML) in years since the expect

    Jan 1, 1984

  • SME
    Optimum Slopes For Future Open Pit Mines: How To Obtain Them Using A Rock Mechanics Approach ? Introduction

    By Ben L. Seegmiller

    How to obtain optimum slope angles for future open pit mines using the rock mechanics approach is the subject of this paper. In the past ten years significant developments in open pit rock mechanics h

    Jan 1, 1976

  • SME-ICGCM
    Optimun Mining Plan for Multiple Seam Mining

    By Wen H. Su

    Multiple seam mining and its associated problems are very serious in Southern West Virginia where poor planning or lack of knowledge in seam interaction often results in complete loss of coal propert

    Jan 1, 1984

  • CIM
    Option pricing: A new approach to valuing mining projects

    "Option pricing is used in finance for valuing options to buy (or sell) shares at some future date because it provides a convenient framework for quantifying values subject to uncertainty. As one of t

    Jan 1, 1997

  • SME
    Options And Costs For CO2 Reductions At Coal-Burning Utilities (43a94e5d-dcf4-4c2a-989b-7d75ffaa4ace)

    By Jr. Hawk

    The power generation industry may be required to reduce CO2 emissions if regulations related to global climate change are enacted. Coal-fired generation, which emits 82% of the power sector CO2, would

    Jan 1, 1999

  • TMS
    Options For Complying With Water Quality-Base Metal Limitations

    By Jack Thibodeau

    During the past six years, most states have promulgated water quality regulations which contain numerical aquatic life standards for heavy metals. In addition, the Environmental Protection Agency (EPA

    Jan 1, 1996

  • IMMS
    Options to Increase Economy of Deep-Sea Mining

    By T. Yamazaki, R. Arai, N. Nakatani, K. Kuroda

    "These 40 years, deep-sea mining for manganese nodules, cobalt-rich manganese crusts, and seafloor massive sulfides has been continuously business and R&D targets. The economy is the most important fa

    Jan 1, 2017

  • IOM3
    Opttimisation of development layyouts for retreat longwall mining with particular reference to the Australian coal mines

    By R D. Lama, A Misra

    One of the major factors restricting an increase in the productivity of a longwall mine is lower productivity obtained in a development panel. There has been a significant improvement in gate road dev

    Jan 9, 1996

  • CIM
    Orano Mining R&d And Innovation Portfolio And Deployment Methodology

    By Hervé Toubon, Matthieu Davrinche, Jim Corman, Mamane Bello Boubacar Kinassa, Pierre Amadieu

    Orano Mining maintains a significant level of Innovation and Development Research for its sites in Canada, Niger, Kazakhstan, Mongolia, and France. This effort is formalized within the six major thema

    Jan 1, 2020

  • IMPC
    Ore Beneficiability Study on Siliceous-Calcareous Phosphate Rock from Karatau, Republic of Kazakhstan

    By S. J. Ma

    With the very effective depressant and collector developed by China Bluestar Lehigh Engineering Corp (hereinafter referred to as LEHIGH), satisfied results are obtained from laboratorial beneficiation

    Jan 1, 2014

  • AUSIMM
    Ore Block Design in Narrow Vein Gold Deposits – Estimate or Simulate?

    By G D. Matthews, M E. Haylett, S Khosrowshahi, A Weeks

    In narrow orebodies the use of ordinary kriging (OK) may pose certain limitations when used for grade control modelling. The smoothing effect of kriging, by its very nature, cannot retain or accuratel

    Aug 18, 2014

  • SME
    Ore Block Optimization For Grade Control Based On Conditional Simulation

    The impact of smoothing on the definition of ore and waste boundaries using linear estimation and conditional simulation methods is discussed. The nature of transfer functions is examined including th

    Jan 1, 1999

  • SME
    Ore Body Ground Conditions

    By D. J. Lachel, Douglas E. Hansen, Bruce Kennedy

    The very high cost of exploration and development for new mines requires that a carefully planned, complete, and technically competent geotechnical evaluation be applied to the ore body and the surrou

    Jan 1, 1982

  • CIM
    Ore Characterization and the Value of QemSCAN

    The use of QemSCAN in providing mineralogical input to detailed ore and product characterization has proved of immense value in recent years. In this paper, a brief review of selected Cu-case studies

    Jan 1, 2007

  • SME
    Ore Characterization, Hydrometallurgical And Reactive Transport Studies For In-Place Leaching Of Oxidized Gold Deposits

    By P. A. Roberts

    A proposal for a modified in situ leaching method for extracting gold from oxidized gold ores using a non-cyanide lixiviant is described. A non-cyanide lixiviant is suggested because of the obvious co

    Jan 1, 2010