Search Documents

Sort by

  • IIMP
    Optimisation of Crushing and Grinding Circuits Using Steady-State Simulation

    By C. A. Brown

    "Steady-state simulation has been used for over 20 years to optimise the operation of crushing and grinding circuits. Throughout that period continuing comminution research has been the basis for impr

    Sep 12, 2005

  • AUSIMM
    Optimisation of Drill and Blast for Mill Throughput Improvement at Ban Houayxai Mine

    By D Symonds, S S. Kanchibotla, L Kennelly, G McNamara, J Gaunt, B Adiyansyah

    Ban Houayxai is a gold-silver mine operated by Phu Bia Mining Limited in Laos since 2012. The first two years of operation processed predominately soft oxidised ore but subsequent years were expected

    Aug 24, 2015

  • AUSIMM
    Optimisation of Hydraulic Filling for Underground Disposal of Tailings in Peru

    By D M R Stone

    Failings di,posal presents many challenges at metal mines in Peru where the extreme relief yields very little useable land area. These challenges are amplified by other hazards such as the high seis

    Jan 1, 1998

  • AUSIMM
    Optimisation of Installed Mill Power Post-installation of Secondary Crushing Circuit at Northparkes Mines

    By F Kock, Y Sulianto, T Trott, B G. Putland, D Morgan

    "Northparkes installed and commissioned a secondary crushing circuit in 2010 to debottleneck the semi-autogenous grinding (SAG) mill constrained grinding circuits. Following further improvements to th

    Oct 10, 2016

  • AUSIMM
    Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)

    By D Horacek, I K. Sheppard

    Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in

    Jan 1, 2007

  • AUSIMM
    Optimisation of Ore Selection in Mining: Method and Case Studies

    By Rolley P

    In the course of reviewing grade control practices at the Marvel Loch gold mine in Western Australia in 1992, FSSI Consultants developed and implemented a novel approach to ore selection using a met

    Jan 1, 1997

  • DFI
    Optimisation Of Pile Type To Support Major Structures Above A Deep Sand Profile - Synopsis

    By P. Davies

    The Hillside Smelter presently under construction at Richards Bay, Republic of South Africa, will be, on completion, the fifth largest aluminium smelter in the world. The site selected for this plant

    Jan 1, 1996

  • SAIMM
    Optimisation of pit to sag mill network using mixed integer linear programming APCOM 2021

    By Z. Saw, C. Poveda, N. L. Mai

    Optimising the throughput of a mining network comprising all equipment from shovels to semi-autogenous grinding (SAG) mills is a complicated task, yet the potential benefits can be significant. Key mo

    Sep 1, 2021

  • SME
    Optimisation Of Single-Layer Cover Made Of Desulphurized Tailings: Application To The Doyon Mine

    By I. Demers

    Doyon mine, Quebec, Canada evaluates the possibility of desulphurizing their tailings to produce material to be used in as cover over the acid generating tailings disposal site. Laboratory tests were

    Jan 1, 2008

  • AUSIMM
    Optimisation of surface tailings storage and tailings backfill – a case study

    By B P. Wrench, N R. Steward, C Wu

    A gold mine in southern China has transitioned from an open pit operation to a fully underground mine. An overhand mining method is used which requires the mined stopes to be filled with backfill havi

    Jul 23, 2018

  • AUSIMM
    Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland

    Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland

    Sep 13, 2010

  • TMS
    Optimisation Of The Anode Sector At Norddeutsche Affinerie

    By Torben L. Edens

    Norddeutsche Affinerie is the largest copper producer in Europe. Two sites are in operation for the production of refined copper: primary copper production is located in Hamburg and secondary copper p

    Jan 1, 2006

  • TMS
    Optimisation of the Leach Conditions for a Copper/Uranium Ore

    By S. J. Macnaughton

    The Olympic Dam deposit in South Australia contains 2% copper and 0.06% uranium, which are present as bomite, chalcocite, chalcopyrite, uraninite, coffinite and brannerite. The copper is principally r

    Jan 1, 1999

  • AUSIMM
    Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South Australia

    By B Cook, M Karakus, J Light, E K. Chanda

    The aim of this research is to develop a model through which the appropriate paste recipe parameters, for example solid content and cement content, can be derived given the stope specific requirements

    Mar 24, 2014

  • AUSIMM
    Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process Control

    By J Hartog, V Beehan, D Beeson

    Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing

    Sep 1, 2014

  • CIM
    Optimisation of the Prominent Hill SAG Mill

    By Mark Weidenbach

    OZ Minerals owns and operates the Prominent Hill copper-gold concentrator in South Australia, built in 2008 and commissioned in early 2009. The concentrator operates via semi autogenous grinding in a

    Jan 1, 2012

  • AUSIMM
    Optimisation of the Sepon Copper Milling Circuit

    By A Jakowetz

    OxianaÆs Sepon Copper Operation (part of the combined Sepon Gold and Copper Operation) is located in Savannaket Province, in southern central Lao PDR. The site is relatively remote, being some five ho

    Jan 1, 2006

  • AUSIMM
    Optimisation Opportunities for High Pressure Grinding Rolls Circuits

    By B Davis, A H. Benzer, A N. Mainza, C M. Evertsson, L M. Tavares, M M. Hilden, M S. Powell, C Rule, G Asbj÷rnsson

    The Mogalakwena North Concentrator of Anglo Platinum Operations was built with the capability to allow for future projected expansion. Several research groups, currently working with Anglo American on

    Oct 29, 2012

  • AUSIMM
    Optimised Process Control in Iron Ore via Online Analysis of Light Elements

    By L Köresaar, J Moilanen

    With lower and increasingly variable Fe grades in iron ore resources, the monitoring of Si, Al, Mg and other light elements to meet quality requirements is gaining importance in the iron ore beneficia

    Jul 13, 2015

  • AUSIMM
    Optimising a Combined Open Pit and Underground Strategic Plan

    By M Maulen, K van Olden, T Elkington

    A large open pit is planned at the site of an existing underground mine. Strategic planning work has been undertaken to investigate the project value associated with an expansion of underground operat

    Jan 1, 2009