Search Documents

Sort by

  • SME
    Optimal Drill Hole Location Using Geostatistics

    By M. E. Gershon

    Conventional methods of drill hole site selection are reviewed briefly. Two approaches using geostatistics are then discussed, both of which have been shown to yield improved results. Finally, a branc

    Jan 1, 1985

  • AIME
    Optimal Drill Hole Location Using Geostatistics (cd5c25a1-8a84-40e5-93b1-a034f39f350b)

    By M. E. Gershon

    Conventional methods of drill hole site selection are reviewed briefly. Two approaches using geostatistics are then discussed, both of which have been shown to yield improved results. Finally, a branc

    Jan 1, 1985

  • SME
    Optimal Drillhole Location Using Geostatistics

    By Mark E. Gershon

    Conventional methods of drillhole site selection are reviewed briefly. Two approaches using geostatistics are then discussed, both of which have been shown to yield improved results. Finally, a branch

    Jan 1, 1983

  • CIM
    Optimal Equipment Lifespan Vs Maintenance Cost

    By L. Chunpongtong

    One of the challenges of mine planning is to determine the most cost-effective replacement time for aging equipment. The lifespan of equipment, such as haul trucks and shovels, deployed in mining oper

    Aug 1, 2013

  • SME-ICGCM
    Optimal Extraction of Coal from Developed Pillars Locked-Up under Different Surface/Sub-surface Structures

    By Arka Jyoti Das, Prabhat Kumar Mandal

    "Coal mining in India has a strategic importance for the energy security of the country. Presently, the majority of coal production is coming from open-cast mining. Due to the fast depletion of reserv

    Jan 1, 2016

  • SME
    Optimal Grade Control Using Geostatistics And Economics: Methodology And Examples (0cbcdec1-207d-4fc8-8d49-cd716d6fcdc7)

    An important problem in mine operations is the classification of material as waste, low-grade stockpile, and ore. This classification must often be made with blasthole data that are widely spaced and

    Jan 1, 1999

  • TMS
    Optimal Leaching On Hydrometallurgical Process of Recycling Batteries Using Less Energy and Reactants

    By Felipe Costa Hashimoto Bertin, Jorge Alberto Soares Tenório, Rodrigo de Souza Dalti Pereira, Denise Crocce Romano Espinosa

    "The increasing amount of portable devices and their fast obsolescence generates an increasing quantity of discarded batteries. The recycling process of discarded batteries allows the recovery of meta

    Jan 1, 2014

  • SME
    Optimal Pitwall Shapes to Increase Financial Return and Decrease Carbon Footprint of Open Pit Mines

    By G. ALBORNOZ, S. Utili, A. AGOSTI, C. VALDERRAMA, R. PELL, N. Morales

    The steepness of the slopes of an open pit mine has a substantial influence on the financial return of the mine. The paper proposes a novel design methodology where overall steeper pitwalls are employ

    Feb 9, 2022

  • SME
    Optimal Pitwall Shapes To Increase Financial Return And Decrease Carbon Footprint Of Open Pit Mines - SME Annual Meeting 2022

    By G. ALBORNOZ, S. Utili, A. AGOSTI, C. VALDERRAMA, R. PELL, N. Morales

    The steepness of the slopes of an open pit mine has a substantial influence on the financial return of the mine. The paper proposes a novel design methodology where overall steeper pitwalls are employ

    Mar 2, 2022

  • SME
    Optimal pitwall shapes to increase financial return and decrease carbon footprint of openpit mines

    By G. ALBORNOZ, S. Utili, A. AGOSTI, C. VALDERRAMA, R. PELL

    The steepness of an openpit mine’s slopes has a substantial influence on the mine’s financial return. This paper proposes a novel design methodology where overall steeper pitwalls are employed without

  • IMPC
    Optimal Selection Of Grinding Medium For A Drum Mill

    By M. Vulkov

    The paper is focused on the optimal selection of grinding medium for a drum mill. The decision-making is based on the fuzzy multiple attribute approach. One way to optimize the grinding process in a t

    Sep 1, 2012

  • SME
    Optimal Sizing Of Conventionally-Sunk Ventilation Shafts Based Upon Capital And Operating Criteria (e05ee128-628b-45f8-8a69-2e8e36ccc831)

    By Y. J. Wang

    The selection of a shaft size for ventilation purposes is a classic problem of concern to mining engineers. This presentation is concerned with the sizing of conventionally-sunk circular shafts with c

    Jan 1, 1977

  • CIM
    Optimal Synthesis of Energy Supply Systems for Remote Open Pit Mines

    By M. Carvalho

    The primary motivation underlying the proposal of polygeneration systems for mine sites is to increase the efficient use of natural resources by combining different technologies and energy resources w

    Aug 1, 2013

  • IIMP
    OptimalSlope: a software determining optimal pitwall shapes of maximum Overall Slope Angles leading to increased financial returns and reduced mining carbon footprint

    By Stefano Utili, Robert Pell, Nelson Morales, Cristobal Valderrama, Andrea Agosti, Guillermo Albornoz

    The overall slope angle (OSA) of pit walls plays a crucial role in the financial return of open pit mines. The work showcases a novel design methodology where non-planar geotechnically optimal pit wal

    Sep 30, 2022

  • CIM
    Optimisation and Continuous Improvement of Antamina Comminution Circuit

    By Edward Rybinski

    Compañía Minera Antamina is a polymetallic mining complex that produces copper and zinc concentrates as primary products and molybdenum and lead/bismuth/silver concentrates as by-products. In 2007, Me

    Jan 1, 2012

  • IMPC
    Optimisation Aspects of Compressive Crushing

    Compressive crushing is applied in crushing plants used in mineral, mining, and aggregate in-dustry for fragmentation of rock materials. From a global perspective, the total volume of crushed rock is

    Jan 1, 2014

  • AUSIMM
    Optimisation of Asanko’s Obotan SABC circuit to achieve ‘Project 5 Million’

    By R Bradford, W Gift-Agbey, T Vorster, P Morgan, E Grobler

    The Asanko Gold Mine in Ghana started processing ore from the Nkran pit in January 2016 at a production nameplate of 3 Mt/a. The flowsheet is a conventional SAG, ball mill and pebble crusher (SABC) w

    Aug 29, 2018

  • AUSIMM
    Optimisation of cemented rock fill strength for open stope support

    By J Player, R de Vries, E Villaescusa, H Saw, R Hassell

    The use of cemented rock fill (CRF) for support of open stope walls has increased in the Australian underground mines operations over the last five years due in part to its low capital cost. In open s

    Oct 16, 2017

  • AUSIMM
    Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning Scheduler

    By D R. Seaman, R P. Tooher, B A. Seaman

    "Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove

    Oct 10, 2016

  • AUSIMM
    Optimisation of copper treatment at Mount Isa Mines Limited

    By Canning RL, Pritchard J

    The surface treatment works in the Mount Isa Mines Limited copper stream consist of a concentrator and smelter with annual capacities of 5.6 million tonnes of ore and production of 155 000 tonnes

    Jan 1, 1986