Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
OFR-83C-92 Hoisting System Components - Selection And Guidelines - Volume 3The objective of this study was two-fold: 1. To perform a world literature search pertinent to the analysis, selection and design of hoisting systems and their components and to codify the search
Jan 1, 1988
-
OFR-83D-92 Hoisting System Components - Selection And Guidelines - Volume 4The objective of this study was two-fold: 1. To perform a world literature search pertinent to the analysis, selection and design of hoisting systems and their components and to codify the search i
Jan 1, 1988
-
OFR-84(11)-76 A Master Environmental Control And Mine System Design Simulator For Underground Coal Mining - Volume XI - Total Systems Application ? I. IntroductionBy C. B. Manula
Bituminous coal mining in the United States is currently experiencing a period of rapid growth which began in the early 1960's. Future demands are conservatively predicted to rise to 700 million
Jan 1, 1975
-
OFR-84(7)-76 A Master Environmental Control And Mine System Design Simulator For Underground Coal Mining - Volume VII - Rail Haulage SubsystemBy C. B. Manula
This report is volume 7 of an eleven-volume final report for a Grant completed by The Pennsylvania State University for the Bureau of Mines to develop a dynamic general purpose computer simulation mod
Jan 1, 1974
-
OFR-84(9)-76 A Master Environmental Control And Mine System Design Simulator For Underground Coal Mining - Volume IX - Water GeneratorBy C. B. Manula
This report is volume 9 of an eleven-volume final report for a Grant completed by The Pennsylvania State University for the Bureau of Mines to develop a dynamic general purpose computer simulation mod
Jan 1, 1975
-
OFR-84-79 Factors Influencing The Solution Rate Of Uranium Dioxide Under Conditions Applicable To In Situ LeachingBy A. Renton Amell
The rate of dissolution of U02 was measured in acid solutions similar to those used for in situ leaching, with S04 of 10-1.82 to 10-4 M, Fe(III) of 10-2 to 10-4 M and pH's of 1.1 to 2.3. The depe
Jan 1, 1978
-
OFR-84-82 Feasibility Of Water Injection For Particulate Removal In Large Turbocharged Diesel EnginesBy R. N. Hambright
Gaseous and particulate exhaust emissions are characterized for a 1200 Bhp two-stroke cycle diesel, a 1000 Bhp four-stroke cycle pre-combustion chamber diesel, and a 900 Blip four-stroke cycle, direct
Jan 1, 1981
-
OFR-85-75 Develop And Test Canopy Air Curtain Devices - 1 Introduction And SummaryBy William J. Krisko
This contract final report summarizes the design, fabrication and testing of canopy air curtain devices under Bureau of Mines Contract H0232067. The canopy air curtain device is designed to reduce the
Jan 1, 1975
-
OFR-86(1)-81 Recommended Guidelines For Oxygen Self-Rescuers -Volume I, Underground Coal MiningBy D. Randolph Berry
The U.S. Bureau of Mines awarded a contract to Foster-Miller Associates, Inc. (FMA) to provide recommendations on the safest, most practical methods for complying with new regulations requiring that a
Jan 1, 1981
-
OFR-86-75 Ore Handling Equipment Operations Safety Study In Underground Metal And Nonmetal Mines ? Section 1 ? IntroductionThe low production rates associated with the underground metal mining industry have received considerable attention during the last decade. A number of significant technological advancements, in the f
Jan 1, 1975
-
OFR-86-84 Evaluation Of The Safety Of Underground Blasting ProceduresBy W. G. Freeman
This study provides recommendations for improved safety in underground blasting procedures based on in-mine observations of blasting practices in 30 underground metal, non-metal, and coal mines, and t
Jan 1, 1980
-
OFR-86-95 The Magnitude 5.3 Seismic Event And Collapse At The Solvay Trona Mine: Analysis Of Pillar/Floor Failure Stability - AcknowledgmentsBy Peter L. Swanson
This investigation, which began 90 minutes after the February 3, 1995, seismic event, has benefitted from the assistance of a large number of individuals. These individuals provided information, data,
Jan 1, 2011
-
OFR-87-80 A Technical Basis For The Development Of Deep Ocean Mining RegulationsBy Philip B. Grote
The deep ocean mining industry is in a pre-commercialization stage of development. In the context of a proper legal/regulatory regime, deep ocean mining system design, site survey, and operation techn
Jan 1, 1979
-
OFR-87-81 Development And Demonstration Of Improved Truck LaddersBy G. Gavan
Analysis of reported injuries for off-highway haul trucks indicated that 42.7% were slip and fall, and of these 34.1% occurred mounting and dismounting the machine. Redesign of the lower steps was con
Jan 1, 1979
-
OFR-87-92 The Economic Impact Of The Mining Industry In Southeast Alaska ? IntroductionSoutheast Alaska's mining industry has come to life after nearly 50 years of relative dormancy. Commencement of operations of the Greens Creek Mine in 1989 marked a turning point in the industry
Jan 1, 1992
-
OFR-88-79 Study Of The Human Factors Aspects Of An Automated Continuous Mining SectionBy Robert L. Frantz
This report is a part of the project "Study of the Human Factors Aspects of an Automated Continuous Mining Section". The report covers three phases: Phase I Assessment of the Impact of the Auto
Jan 1, 1977
-
OFR-88-80 Phase 1: Research On The Hydrology And Water Quality Of Watersheds Subjected To Surface MiningFive watersheds, ranging in size from 29 to 49 acres, were selected in East-Central Ohio to investigate the hydrologic and water quality conditions occurring before, during, and after surface mining.
Jan 1, 1978
-
OFR-88-82 Survey Of Safety Procedures For Guarding Blast Affected AreasBy Jerry Bennett
This report describes the results of a survey of current blast area guarding procedures at surface and underground metal/nonmetal mines. It features five case histories (two surface and three undergro
Jan 1, 1981
-
OFR-88-83 Proceedings Of A Workshop Cyanide From Mineral Processing - February 2-3, 1982 Salt Lake City, Utah ? PrefaceThe workshop on "Cyanide Effluents from Mineral Processing' was held on February 2-3, 1982, at the U.S. Bureau of Mines, Salt Lake City Research Center, Salt Lake City, Utah. The workshop was spo
Jan 1, 1983
-
OFR-88-84 Data Security For In-Mine Transmission - Phase II Report - Executive Summary Of Phase I ReportBy Jon G. Bredeson
The electromagnetic noise that exists in a mining environment is quite severe and was shown to have been reasonably well documented by a number of researchers in the Phase I Report. The noise levels a
Jan 1, 1980