Search Documents

Sort by

  • NIOSH
    OFR-12-87 Development And Validation Of A Comprehensive Mine Rescue Team Training Program

    By Ronald Althouse

    During the past five years under contract with the U. S. Bureau of Mines (BOM Contract J0308002). West Virginia University's Mining Extension Service (WVU-MES) has designed, developed) and delive

    Jan 1, 1986

  • NIOSH
    OFR-12-89-2 Technical Appendices The Potential Supply Of Minerals From The White Mountains National Recreation Area And The Steese National Conservation Area In Alaska ? Appendix A ? Potential Mineral Supply Analysis Methodology

    The development of the potential supply analytic system has advanced to the point that quantitative estimates of economically recoverable resources can be made as the final step of the traditional reg

    Jan 1, 2011

  • NIOSH
    OFR-12-90 Gold- And PGM-Bearing Conglomerate Of The Valdez Creek Mining District, Alaska

    By Steven A. Fechner

    The U.S, Bureau of Mines is conducting a four-year (1987-1990) study to assess the mineral resources and mineral development potential of the Valdez Creek Mining District in southcentral Alaska. This

    Jan 1, 2011

  • NIOSH
    OFR-120(2)-79 Guidelines For Automatic Couplers - Volume II - Design, Inspection And Maintenance Manual

    By Dipak C. Talapatra

    This report describes the development of guidelines for design, inspection and maintenance of automatic couplers. In order to devise the guidelines, performance requirements for automatic couplers wer

    Jan 1, 1977

  • NIOSH
    OFR-120-78 Improved Fire Protection System For Underground Fueling Areas - Volume I

    By B. C. Christensen

    The contract objectives are (1) to develop safe practice guidelines which will minimize the chance of fires in underground fueling areas and (2) to develop a low-cost, reliable, automatic fire protect

    Jan 1, 1977

  • NIOSH
    OFR-120-80 The Effect Of In Situ Retorting On Oil Shale Pillars

    By L. Ozdemir

    An investigation was made to determine the mechanical properties of oil shale at elevated temperatures and confining pressures, the thermal properties at elevated temperatures, and to provide mathemat

    Jan 1, 1981

  • NIOSH
    OFR-120-84 Development Of Foreign Economic Indices - Phase I For Philippines

    By Alice M. Chieruzzi

    This Country Documentation Report presents the development of economic indices for the Philippines for the period from 1970 through 1981. The work was done through the Bureau of Mines, Minerals Availa

    Jan 1, 1983

  • NIOSH
    OFR-121(1)-82 Health And Safety Analysis On Support Walls

    [lllc purpabr at thla report Vd, Lu JeLermlnr the health ar1J sdfet?; Nene11Le a octatc?J ultll Lne oar L.t support Ydlll ..up.I,ated lu dltetllative cupPurt svsLem, larrellLty hcle.g uaeJ af the Len,

    Jan 1, 1980

  • NIOSH
    OFR-121(2)-82 Steel Supports Design Criteria - A Summary Of European Data

    By Steven A. Hawkins

    This report details the conduct and results of a 5-month study to collect data on the use of steel support for ground control in European underground coal mines. The report summarizes European steel s

    Jan 1, 1980

  • NIOSH
    OFR-121-77 Longwall Ignition Suppression

    By Ronald D. Rothchild

    This report describes the results of a study of longwall ignition hazards and specific suppression systems to minimize each of the major hazards. The major ignition hazards were identified by conducti

    Jan 1, 1976

  • NIOSH
    OFR-121-78 Design Of A Retrofittable Temporary Face Support System

    By Alfred Bellows

    The objective was to develop and design a remotely operated temporary roof support system that provides a safe working environment between a freshly cut coal face and the last line of permanently supp

    Jan 1, 1976

  • NIOSH
    OFR-121-81 Innovations For Explosionproof Electrical Enclosures

    By R. J. Gunderman

    Explosionproof electrical enclosures for coal mine face equipment have been of the same basic design for many years without significant change. Characteristics for potential improvement were investiga

    Jan 1, 1980

  • NIOSH
    OFR-121-84 Development Of Foreign Economic Indices - Phase I For Zambia

    By Alice M. Chieruzzi

    This Country Documentation Report presents the development of economic indices for Zambia for the period from 1970 through 1981. The work done through the Bureau of' Mines, Minerals Availability

    Jan 1, 1983

  • NIOSH
    OFR-122(1)-78 Advancing Oil Shale Mining Technology: Program Evaluation - Executive Summary

    By G. F. Kuncir

    The analysis summarized herein evaluates the Bureau of Mines Program for Advancing Mining Technology Oil Shale in terms of the economic benefits which may be derived for the Nation as a result of its

    Jan 1, 1977

  • NIOSH
    OFR-122(1)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume I - Process Technology And Costs

    By K. B. Bengtson

    This task report provides the process technology, preliminary design, capital and operating costs for a 25 TPD pilot plant to produce cell-grade alumina using a clay/hydrochloric acid extraction - HCI

    Jan 1, 1979

  • NIOSH
    OFR-122(2)-78 Advancing Oil Shale Mining Technology: Program Evaluation - Time-Cost-Risk Analysis

    By G. F. Kuncir

    The time-cost-risk analysis described herein was performed as part of an evaluation of the Advancing Oil Shale Mining Technology Program performed by The Aerospace Corporation. The objectives of this

    Jan 1, 1977

  • NIOSH
    OFR-122(4)-78 Advancing Oil Shale Mining Technology: Program Evaluation - Benefit-Cost Analysis

    By G. F. Kuncir

    The analysis described herein evaluates the Bureau of Mines Program for Advancing Mining Technology - Oil Shale in terms of the economic benefits which may be derived for the Nation as a result of its

    Jan 1, 1977

  • NIOSH
    OFR-122(4)-80 Alumina Process Feasibility Study And Preliminary Plot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume IV - Appendix B - General Specification - Section 1 - Building Description

    1.0 Control House (DWG. NO. 56-401-G) - 1.1 Physical Description The Control House is a single story, 2728 square foot building with an adjacent transformer yard. A four foot overhang provides shad

    Jan 1, 1979

  • NIOSH
    OFR-122(5)-78 Advancing Oil Shale Mining Technology: Program Evaluation - Economic Mine Models

    By G. F. Kuncir

    This volume was prepared in support of an evaluation of the Advancing Oil Shale Mining Technology Program performed by The Aerospace Corporation under a Bureau of Mines contract. The evaluation is des

    Jan 1, 1977

  • NIOSH
    OFR-122(5)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Vol V - Appen B - General Specs - Sect 5 - Mechanical - Material Handling And Assoc Equip

    1.0 SCOPE AND REGULATIONS 1.1 This specification covers the minimum requirements for material handling and associated equipment including design and materials. 1.2 This specification requires

    Jan 1, 1979