Search Documents

Sort by

  • IMPC
    Maximising the Value of ‘A Wealth of Information’ (1e5cd2ab-37d3-481c-b69f-500fafd475e7)

    By Rob Morrison, Andrew Scott

    "Long before a modern mine commences operations it has already become a wealth of information. After start up, it can generate enormous quantities of data – especially with semi-automated data acquisi

    Jan 1, 2003

  • AUSIMM
    Maximising Value Through Maintaining Your Flotation Equipment

    By B Murphy, S O’Connell, J L. Heath

    In the 1989 best-seller The 7 Habits of Highly Effective People, the author, Stephen Covey, highlights the importance of maintaining not only ‘production’, but also, ‘production capacity’. When operat

    Sep 1, 2014

  • SME
    Maximization of Productivity Of Autonomous Equipment in Underground Mines

    By J. Paraszczak

    Underground metal mining involves many challenges. Economic slowdown, tough international competition and sometimes volatile metal prices put constant pressure on mine operators to increase productivi

  • SME
    Maximization of Productivity of Autonomous Trackless Loading and Haulage Equipment in Underground Metal Mines ? A Challenging Task

    By J. Paraszczak

    Application of teleoperated and automated (or ?autonomous?) mobile equipment in underground metal mines is a promising avenue for overcoming some of the challenges facing mine operators. These include

    Feb 23, 2014

  • CIM
    Maximizing fuel cell test reliability

    By C. Andrews

    Fuel cell testing requires fully automated operation, on-site configuration of tests, and real-time monitoring for performance and failures. Balancing the flexibility and programmability of a test sta

    Jan 1, 2005

  • CIM
    Maximizing Gravity Recovery through the Application of Multiple Gravity Devices

    By J. A. Abols, P. M. Grady

    Recovery via gravity is one of the oldest mineral processing methods available. Unfortunately, the use of gravity techniques for gold recovery has been in decline for the past century as more effectiv

    Jan 1, 2005

  • ISEE
    Maximizing Mining Recovery Through Advanced Blasting Techniques and Blast Movement Management

    By Aris Tambunan, Nella Lubis, Nurafrianti Saala, Komang Widhiayanto, Herry Saputra, Rudolf Sitorus

    Maximizing mining recovery rates and minimizing ore loss are pivotal objectives for economic efficiency and operational effectiveness. This study explores methods to address these imperatives by enhan

    Jan 21, 2025

  • SME
    Maximizing REE Enrichment by Froth Flotation of Alaskan Coal Using Box-Behnken Design Mining, Metallurgy and Exploration

    By T. Gupta, T. Ghosh

    Rare earth elements (REEs) and their compounds are essential in a multitude of mundane and sophisticated applications such as renewable energy technologies, catalysts, medicine, and defense applicatio

  • SME
    Maximizing REE Enrichment by Froth Flotation using Box-Behnken Design in Alaskan Coal

    By T. Gupta, T. Ghosh

    "Rare Earth Elements (REEs) and their compounds are essential for numerous modern high tech applications such as renewable energy technologies, catalysts and defense applications. The destabilization

    Jan 1, 2017

  • TMS
    Maximizing the Values of Steelmaking Slags

    By Naiyang Ma

    Along with steel production, various steelmaking slags are constantly generated at considerably high rates. In general, steelmaking slags are not categorized into hazardous materials and do not cause

    Mar 1, 2017

  • CIM
    Maximizing Value ? Promoting Materials Stewardship In The Minerals And Metals Sector

    By J. K. Atherton

    If the metals sector is to contribute successfully to sustainable consumption we must adopt principles and practices which address the entire life cycle of the materials we produce. Progress must be f

    Jan 1, 2007

  • SME
    Maximum Charge Weight Equation for Underground Blast Overpressures

    By B. Petri, N. Rouse

    "Air overpressure monitoring procedures and instrumentation guidelines which apply to production blasting in underground limestone mining are not readily available. The industry also lacks an applicab

    Jan 1, 2015

  • SAIMM
    Maximum height estimation for mine waste dumps

    By S. Chai

    Waste dumps are widely used to discharge stripped mine wastes in open pit mining methods. As mining progresses, the height of the waste dumps will increase gradually, which may induce sliding failure

    Oct 1, 2022

  • SME
    Maximum Utilization Of ANFO Energy By Proper Initiation

    By Paul H. Rylund

    Substantial priming was a considered necessity for proper initiation of ammonium nitrate-fuel oil mixes as ANFO began to carve its niche in the mining industry in the latter fifties. Heavy priming acc

    Jan 1, 1972

  • CIM
    Mcclean Lake Mill 55 Kt Debottlenecking Study

    By T. S. Grewal, S. C. Gupta, H. Natarajan, T. W. McQuade, N. Nejibulloev-Mamedov

    Cigar Lake is one of the world’s largest high-grade uranium mines. The ore mined at Cigar Lake is milled at Orano Canada Inc’s (Orano) McClean Lake mill. The average Cigar Lake ore uranium grade since

    Jan 1, 2020

  • CIM
    McLaughlin's Improved Sag Milling Circuit

    By M. Jorgensen, I. Markland, D. Shuck

    "The McLaughlin Mine owned by Homestake Mining Company is located 70 miles northeast of San Francisco in California's coastal range. The mine began operations in February of 1985. The mill currently p

    Jan 1, 1991

  • SME
    MDC’s Hartford, Connecticut South Tunnel Project: Integrating Site Investigation Technology, Geology and Geotechnical Engineering for Effective Ground Characterization

    By Robin Dill, Wei Song, Andrew Perham, Leo Martin

    "AECOM completed a subsurface exploration program for an 18-foot diameter, approximately 4-mile long rock tunnel project in Hartford, CT. The tunnel crosses the regional geologic trend through the mid

    Jan 1, 2016

  • CIM
    MDS Analysis of Film Stability and Bubble Attachment at Selected Mineral Surfaces

    By J. Jin, J. D. Miller

    "Bubble attachment at hydrophobic surfaces is of critical importance in the flotation recovery of mineral resources and fundamental experimental results have been reported in the literature describing

    Jan 1, 2016

  • CIM
    Meadowbank Mine: Environmental Challenge North of 60

    By Stéphane Robert

    This document presents estimates of future "total cash cost per ounce" and "minesite cost per tonne" that are not recognized measures under United States generally accepted accounting principles ("US

    May 1, 2011

  • DFI
    Meadowlands Megaproject: 9,000 Piles and Counting

    By Ronald D. Boyer

    "Early in the design stage of Meadowlands Xanadu, the client’s project director informed me that “after construction, nobody is going to come to Xanadu to see the foundations.” My response was, “Well,

    Jan 1, 2009