Geotechnical Considerations In Nuclear Power Plant Construction And Licensing ? IntroductionBy James W. Mitchell
On December 2, 1942, a scientific team lead by Nobel Prize winner Enrico Fermi first initiated and controlled a self-sustaining nuclear chain reaction. This historic event occurring beneath the stands
Jan 1, 1974
-
Geotechnical Considerations In Underground Coal GasificationBy J. M. Avasthi
Gulf Research & Development Company conducted the nation's first underground coal gasification test in steeply dipping beds near Rawlins, Wyoming. The geotechnical considerations played a major r
Jan 1, 1981
-
Geotechnical Considerations in Underground Coal Gasification (b0daa032-49f3-4f12-ab84-34160644e033)By J. M. Avasthi
The DOE-funded (Contract No. DE-ACO3-77ET13108) Gulf Research & Development Co. (GR&DC) field tests of underground coal gasification in steeply dipping beds (UCG/SDB) were conducted in the North Knobs
Jan 1, 1984
-
Geotechnical Data Analysis to Select a Feasible Method for Development of a Long Axis, Large Diameter Vertical Ventilation ShaftBy E. J. Walls, W. C. Joughin
"In selecting a suitable method to sink a vertical shaft for underground access, a number of constraints influence the ultimate decision of where and how to develop the shaft, not least among these be
Apr 1, 2019
-
Geotechnical data collection and application to the Leeville underground mine - SME Transactions 2010By Changshou Sun
The Leeville underground mine has been in operation since 2006 and currently produces 3,175 t (3,500 st) of ore per day with an average gold grade of 12.6 g/t (0.4 opst). The mine has a large horizont
Jan 1, 2010
-
Geotechnical Data Collections And Applications At The Leeville Underground MineBy C. Sun
The Leeville underground mine has been in operation since 2006 and currently produces 3,300 tons of ore per day with an average gold grade of 0.4 opt. The mine has a large horizontal extent of 2,500 f
Jan 1, 2010
-
Geotechnical Design and Performance of Road and Railway Viaducts Supported on DSM Columns - A Summary of PracticeBy Michal Topolnicki
"Discussed is the use of wet Deep Soil Mixing, generally executed with single mixing tools 0.8 to 1.6m in diameter, employed in the foundation of viaduct supports. The applications involve economical
Jan 1, 2015
-
Geotechnical Design For Open Pits At Tanjianshan, ChinaBy Huang Zhiwei, Paul Skayman, Kevin Holley
In 1989 The First Brigade for Geology and Mineral Exploration of Qinghai Province discovered gold at Jinlonggou and Qinlongtan, Tanjianshan. Between 1992 and 2002 small scale mining was carried out a
Jan 1, 2006
-
Geotechnical Engineering at Ok Tedi - A Multidisciplinary ApproachBy A P MACONOCHIE
The methods used and some of the results obtained from a major geotechnical study of the Ok Tedi mine area, Papua New Guinea, are described. The study was carried out at both regional and local scal
Jan 1, 1992
-
Geotechnical Evaluation For the Design and Construction of Mine ProjectsBy Trevor A. Moss
Installation of equipment and structures at mines often requires mine planners to evaluate unique loading and operating conditions. Consideration of these unusual features is required throughout desig
Jan 1, 1992
-
Geotechnical Evaluation For The Design And Construction Of Mine Projects (4bd0c866-12e8-4d49-923c-02cf84dcd6fb)By T. A. Moss
The installation of equipment and structures at mines often requires the evaluation of unique loading and operating conditions. Consideration of these unusual features is required throughout design an
Jan 1, 1992
-
Geotechnical Exploration for a Lake Mead IntakeBy Richard F. Coon
Six potential locations along the west shore of Lake Mead were evaluated to site anew water intake pumping station for the SNWA. The evaluations were based upon geotechnical exploration results and c
Jan 1, 1997
-
Geotechnical Exploration For The H-3 Highway Trans-Koolau TunnelBy Lee W. Abramson, William H. Hansmire
The H-3 Project is planning, design, and construction of a 10-mile (16 km)-long final segment of new highway that traverses the Koolau mountain range in Oahu. Interstate H-3 traverses North Halawa Val
Jan 1, 1989
-
Geotechnical Factors Affecting the Surface Placement of Process Tailings in Paste FormBy D J. A Van Zyl, J C. Cunning
Technological advances associated with the expanded application of paste technology in underground mine backfilling are now stimulating an interest in the disposal of process tailings as paste in the
Jan 1, 1998
-
Geotechnical Factors Influencing A Time-Dependent Deformation Mechanism Around An Entry In A Dipping SeamBy M. K. Larson
The U.S. Bureau of Mines and Cyprus Shoshone Coal Corp. conducted a study of deformation mechanisms in strata around a longwall gate road system at two sites in an underground coal mine near Ham, WY.
Jan 1, 1996
-
Geotechnical Factors Influencing Violent Failure In U. S. MinesBy Brian White, Hamid Maleki
Sudden, violent failures of rock around mine openings influence access, ventilation, and safety in both hard-rock and coal mines. To develop predictive tools for assessing the potential for violent fa
-
Geotechnical Input to the Porgera Gold Project, Enga Province Papua New GuineaBy Mules GJ
Geotechnical investigations have played a key role in influencing decisions for development of the Porgera Gold Project in the highlands of Papua New Guinea. Porgera is located 130 km west-northwest o
Jan 1, 1990
-
Geotechnical Instrumentation of Pile Foundations Embedded In Molasse of a High-Rise BuildingBy A. Daouadji, P. Cazes, S. Grange, L. Briançon, R. Milane
Construction in congested urban areas is often accompanied by geotechnical problems due to high loads and the impact caused by nearby buildings. For this reason, it is important to understand the beha
Jan 1, 2019
-
Geotechnical Instrumentation Research Leads Into Development Of Improved Mine DesignsBy H. Maleki
This paper recognizes the 100th year of research accomplishments by the mining industry resulting from close cooperation among mining companies, geotechnical consultants and researchers from the forme
Jan 1, 2010
-
Geotechnical Investigation and Design for the Sister Grove Outfall Tunnels - RETC2021By Michael Schultz, Gregory Sanders
In 2017, the North Texas Municipal Water District (NTMWD) initiated the design of the Sister Grove Regional Water Resource Recovery Facility (SGRWRRF) to provide additional treatment capacity for futu
Jun 13, 2021