Search Documents

Sort by

  • SME
    Fragmentation modeling using the Multiple Blasthole Fragmentation (MBF) model at an openpit mine

    By C. McAllister, D. Preece, J. Berendzen

    "The Multiple Blasthole Fragmentation (MBF) model models multiple explosive charge contributions and the effect on fragmentation of delay timing with its associated scatter for each blasthole. The mod

    Oct 1, 2016

  • ISEE
    Fragmentation of Sandstones and Quartzites

    By Lewis L. Oriard

    Some two million cubic yards of sandstone and orthoquartzite were blasted and excavated at Upper Stillwater Dam, located high in the Uinta Mountains in northern Utah. The material was processed to pro

    Jan 1, 1993

  • AUSIMM
    Fragmentation Optimisation – Adopting Mine to Mill for Reducing Costs and Increasing Productivity

    By V M. Silva, P A. A Martins, V O. Matthew, A L. S Fonseca, E B. Cunha, A J. D Ferrari, E M. S Silva, A C. Silva, D R. T Vilela

    The Anglo American phosphate mine is located in the Brazilian state of Goiás and possesses one of Brazil’s most important phosphate rock deposits, with the site being the country’s second largest

    Aug 24, 2015

  • ISEE
    Fragmentation Optimization Techniques using 5.5 inch Hole Plugs at the Holcim Cement – St. Genevieve Quarry

    By Douglas Bartley

    As the economy continues to slowly recover, our industry continues to finds ways to increase productivity while being forced to cut costs. The drilling and blasting process is the starting point of an

    Jan 1, 2012

  • AUSIMM
    Fragmentation Prediction and Assessment at the Ridgeway Deeps and Cadia East Cave Operations

    By J L. Lett, I Brunton, T Thornhill

    Block cave fragmentation has been documented in the literature to have a significant impact on mine design, performance and downstream material handling and comminution processes. Due to this impact,

    May 9, 2016

  • SME
    Fragmentation Studies In A Georgia Granite

    By Douglas Castleberry

    The degree of fragmentation obtained in primary quarry blasting has always been a factor in the speed of digging' the muckpile This paper will discuss a case history of increased production and a

    Jan 1, 1960

  • SAIMM
    Framework for ergonomic design of control centres in underground coal mines—A Serbian experience

    By M. Grozdanovic, D. Marjanovic, M. Ilic

    We present a framework for solving the problem of functional compatibility between process control equipment in control centres at underground mines and operator capabilities. The equipment incorporat

    Jun 10, 2024

  • DFI
    Framework for Risk-Based Electric System Deep Foundation Design

    By Steve Davidow, Ashely E. Evans, Peter M. Kandaris

    "Annually thousands of deep foundations are constructed across North America supporting high voltage transmission line structures. However, a recent state of the practice survey by the Deep Foundation

    Jan 1, 2017

  • AUSIMM
    Framework for Strategic Water Management in the Minerals Industry

    Access to secure and reliable water resources is fundamental to the minerals industry. In recognition of that requirement, and cognisant of extensive contemporary public water debate and reform initia

    Jan 1, 2006

  • CIM
    Francoeur Mine

    By J. E. Hawley

    "The property of Francoeur Gold Mines, Limited, lies directly west of the Armfield mine in Beauchastel township, Abitibi district, and 12 miles west and slightly south of Noranda. The gold deposits ar

    Jan 1, 1954

  • SME
    Franklin Industrial Minerals -Mica Operations in New Mexico

    By Gary L. Nelson

    An overview is provided of Franklin Industrial Minerals mica mine and plant operations located near Velarde, New Mexico. Operated by Franklin Industrial Minerals since July of 1990, several process an

    Jan 1, 1994

  • DFI
    Fraser Heights Bridge – Comparison between PDA Tests and Pile Capacity Estimation Methods

    By Ali Azizian, Brian Hall

    "Driven piles were selected to support the Fraser Heights Bridge bents. Piles were a key component of the top-down construction approach, which was adopted for minimizing potential impacts on an envir

    Jan 1, 2016

  • AUSIMM
    Frasers Underground - From Technical Study to Production

    Oceana Gold CorporationÆs (OGC) Frasers underground (FRUG) transitioned into production in early 2008. The mine uses a relatively unique yielding pillars mining method that takes its lessons from empi

    Jan 1, 2009

  • AUSIMM
    Freeport's Fourth Concentrator-A Large Step Towards the 21st Century

    By Napitupulu P

    PT Freeport Indonesia currently operates a concentrating complex capable of milling 127 000 metric tonnes per day of copper and gold hearing ore. The facilities consist of both a conventional crushi

    Jan 1, 1997

  • SME
    Freeport-McMoRan Finds New Way To Put Waste Oil To Use

    Equipment-washing facilities at Freeport-McMo-Ran?s Sierrita Mine in Arizona produce a mixture of oil and water that was difficult to dispose of easily or cheaply. However, after some changes in the f

    Jan 1, 2009

  • AIME
    Freezing Techniques For Shaft Support

    By T. R. Braithwaite

    The brief comments made in this chapter deal mainly with shaft sinking, but don't assume that freezing techniques apply only to shaft sinking. They can be used on tunnel work, on such things as l

    Jan 1, 1970

  • DFI
    Fresh Concrete Pressure in Cast In-Situ Bored Piles

    By Matthias Pulsfort, Hanna Nissen, Markus Herten

    An insufficient integrity of cast in-situ bored piles can lead to a reduction of the load bearing capacity and may require cost intensive repairs. Reasons for an insufficient pile integrity are linke

    Sep 8, 2021

  • AUSIMM
    Friction bolt performance over the past ten years in Australian mines

    By T M. Nester, D J. Reardon, A N. Page, B J. Barsanti

    The load capacity of a friction bolt has long been regarded as 4 t/m of embedment for ground support design analysis and supported by in situ pull test results. In recent years, the authors have obser

    Nov 29, 2022

  • DFI
    Friction Fatigue and Drivability Analysis of Open Ended Pipe Piles Based on Cone Penetration Testing Results

    By Frank Rausche, Scott D. Webster, Rozbeh B. Moghaddam

    "Pile foundation driveability is a function of several variables such as subsurface characteristics, hammer type, hammer efficiency, pile type, and plugging conditions. One important phenomenon occurr

    Jan 1, 2017

  • SAIMM
    Friction Hydro Pillar Process As An Alternative Repair Technology For Creep Evaluation Sites On Thick-Walled 10CrMo910 Creep-Resistant Steel Structures ? Synopsis

    By D. L. H. Bulbring

    The removal of a cylindrical core from thick-wall sections for creep analysis by the relatively new Weldcore® process represents a very exciting methodology for obtaining more representative creep dam

    Jan 1, 2013